---
description: Is Tucson a good data center market for power? DCPI verdict BUILD, score 69.6/100 (WECC), as of 2026-11-12. 5 MW tracked across all listings, unverified included (as of 2026-11-07). Grid, queue and deal context for 300+ markets.
title: "Tucson data centers: power, grid and capacity | DC Hub"
---

# Tucson data center market

Power availability in Tucson: DCPI verdict BUILD, composite score 69.6 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 315 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Tucson data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Tucson market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**69.6/100**

MW, all listings**5**sum of the sites that report MW; most do notany status, unverified listings included

Verdict**BUILD**

## Tucson at a glance

Tucson has 5 MW operational among the verified sites DC Hub lists that report capacity, as of 2026-11-12.

Capacity by status, as of 2026-11-12

| Status | MW |
| --- | --- |
| Operational | 5 |
| Total listed | 5 |

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

## Colocation lease rates in Tucson

DC Hub does not hold a lease-rate figure for this market yet.

Tucson hosts nine tracked data center facilities across five distinct operators, with CenturyLink Tucson, DirecTV, Involta Tucson, Login LLC, and Simply Bits LLC each maintaining a single site in the market. One facility publicly reports its power consumption, but aggregate capacity data for the market remains undisclosed. The operator base reflects a mix of regional and national providers without clear market concentration, suggesting a fragmented competitive landscape typical of secondary markets in the Southwest.

This combination signals that new power supply capacity is available and that regulatory, infrastructure, or contractual barriers to accessing that power remain modest.

No recent deals have been tracked in Tucson's data center market. The deal silence is consistent with a market in early- to mid-stage maturity, where operators maintain independent facilities without triggering major transactional events.

Tucson's regulatory environment is beginning to formalize data center governance; Oro Valley municipal proceedings have included discussion of new data center rules, and a 160-acre greenfield proposal in nearby Sahuarita is under public review. These signals suggest that municipal capacity planning and land-use policy around data center siting are active considerations for future development. Power and supply fundamentals remain the primary variable shaping feasibility for new or expanded operations in the market.

## Data centers in Tucson

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [DirecTV](https://dchub.cloud/facilities/directv-directv-e3e7dcfd) |  | Operational | 5 |
| [Login Tucson](https://dchub.cloud/facilities/login-llc-login-tucson-98f734e2) | Login, LLC | Operational |  |
| [Simply Bits DC1](https://dchub.cloud/facilities/simply-bits-llc-simply-bits-dc1-481f7696) | Simply Bits, LLC | Operational |  |
| [ark data centers - Tucson, AZ](https://dchub.cloud/facilities/ark-data-centers-ark-data-centers-tucson-az-bd229f40) | ark data centers | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Arizona](https://dchub.cloud/facilities/in/us/arizona).

## More on Tucson

- [Tucson DCPI score](https://dchub.cloud/dcpi/tucson)
- [Tucson market brief](https://dchub.cloud/markets/tucson/brief)
- [Arizona data center market brief](https://dchub.cloud/states/arizona/brief)
- [Arizona data center tax incentives](https://dchub.cloud/states/arizona/data-center-incentives)

### Email me when the Tucson DCPI verdict changes

Email me when Tucson's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Tucson: 5 MW tracked, any status — live, cited, and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=tucson) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=tucson)

JSON: [/api/v1/markets/tucson/deep-dive](https://dchub.cloud/api/v1/markets/tucson/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Tucson","item":"https://dchub.cloud/markets/tucson"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Tucson Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:30:53.118326+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/tucson",
 "wordCount":315,
 "about":{"@type":"Place","name":"Tucson"},
 "description":"Live data-center market analysis. DCPI score 69.6/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "tucson", "name": "Tucson Data Center Market — DC Hub", "description": "Live data-center market measurements for Tucson, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/tucson", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Tucson"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 5.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 69.6, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:47:43."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "BUILD", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:47:43.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:47:43."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/tucson#webpage", "url": "https://dchub.cloud/markets/tucson", "name": "Tucson data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Tucson data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Tucson market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Tucson data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Tucson market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```
