---
description: Is Troy a good data center market for power? DCPI verdict CAUTION, score 46.8/100 (MISO), as of 2026-11-12. Grid, queue and deal context for 300+ markets.
title: "Troy data centers: power, grid and capacity | DC Hub"
---

# Troy data center market

Power availability in Troy: DCPI verdict CAUTION, composite score 46.8 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 204 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Troy data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Troy market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**46.8/100**

MW, all listings**0**any status, unverified listings included

Verdict**CAUTION**

This analysis was written on 2026-11-07, when the Data Center Power Index for this market read 46.6. The index is recomputed through the day and reads 46.8 now — the figure above is the live one, and the narrative below describes the market as it stood when it was written.

## Colocation lease rates in Troy

DC Hub does not hold a lease-rate figure for this market yet.

Troy's data center market comprises three tracked facilities operated primarily by ManagedWay Company, which manages two sites, and Dennis Sampier, who operates one. The market has recorded no recent deal activity in the tracked period. A single tracked operator has reported power capacity metrics to DC Hub; the others have not disclosed megawatt figures publicly.

The DCPI verdict of CAUTION reflects a split signal on power availability. The combination suggests new power is attainable but not frictionless; operators should expect moderate lead times and infrastructure coordination requirements rather than acute scarcity or blockage.

ManagedWay Company's dual-site presence establishes it as the largest operator footprint in the market, though the absence of recent tracked deals leaves current expansion intent unclear. No acquisitions, investments or new site announcements have been recorded for Troy.

## Data centers in Troy

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [Chick-fil-A Hiring Center](https://dchub.cloud/facilities/dennis-sampier-chick-fil-a-hiring-center-c32e0a11) | Dennis Sampier | Operational |  |
| [ManagedWay TYM1](https://dchub.cloud/facilities/managedway-company-managedway-tym1-72657d6c) | ManagedWay Company | Operational |  |
| [ManagedWay TYM2](https://dchub.cloud/facilities/managedway-company-managedway-tym2-f0c165a7) | ManagedWay Company | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Michigan](https://dchub.cloud/facilities/in/us/michigan).

## More on Troy

- [Troy DCPI score](https://dchub.cloud/dcpi/troy)
- [Troy market brief](https://dchub.cloud/markets/troy/brief)
- [Michigan data center market brief](https://dchub.cloud/states/michigan/brief)
- [Michigan data center tax incentives](https://dchub.cloud/states/michigan/data-center-incentives)

### Email me when the Troy DCPI verdict changes

Email me when Troy's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Troy market data is live in DC Hub — cited and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=troy) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=troy)

JSON: [/api/v1/markets/troy/deep-dive](https://dchub.cloud/api/v1/markets/troy/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Troy","item":"https://dchub.cloud/markets/troy"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Troy Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:30:44.621452+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/troy",
 "wordCount":204,
 "about":{"@type":"Place","name":"Troy"},
 "description":"Live data-center market analysis. DCPI score 46.8/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "troy", "name": "Troy Data Center Market — DC Hub", "description": "Live data-center market measurements for Troy, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/troy", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Troy"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 0.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 46.8, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:47:44."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "CAUTION", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:47:44.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:47:44."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/troy#webpage", "url": "https://dchub.cloud/markets/troy", "name": "Troy data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Troy data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Troy market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Troy data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Troy market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```
