# Toronto data center market

Power availability in Toronto: DCPI verdict AVOID, composite score 25.2 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 255 words · generated 2026-11-10 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Toronto data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Toronto market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**25.2/100**

MW, all listings**705**sum of the sites that report MW; most do notany status, unverified listings included

Verdict**AVOID**

## Toronto at a glance

Toronto has 45 MW operational and 40 MW under construction among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are Microsoft (40 MW), Yondr Group (27 MW) and Cologix (18 MW).

Capacity by status, as of 2026-11-12

| Status | MW |
| --- | --- |
| Operational | 45 |
| Under construction | 40 |
| Total listed | 85 |

## Developers building or planning in Toronto

| Operator | Under construction MW | Planned MW |
| --- | --- | --- |
| Microsoft | 40 |  |

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

## Colocation lease rates in Toronto

DC Hub does not hold a lease-rate figure for this market yet.

This operator concentration reflects a mature, consolidated market where facility acquisition and portfolio integration have shaped the competitive structure. The market remains geographically and operationally centered on the city's established data center corridors.

These metrics suggest that new entrants or existing operators seeking significant expansion will face material obstacles in power acquisition rather than abundance.

Recent tracked deal activity in Toronto remains minimal, with no deals recorded in the current window. The Ontario government's new data center framework announcement suggests policy-level recognition of infrastructure gaps, though framework adoption and project execution typically lag announcement. Operator dynamics continue to reflect consolidation and asset optimization rather than aggressive new-build announcements.

## Data centers in Toronto

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [Microsoft Vaughan Ontario](https://dchub.cloud/facilities/microsoft-microsoft-vaughan-ontario-27be5f6d) | Microsoft | Under Construction | 40 |
| [Yondr Toronto](https://dchub.cloud/facilities/yondr-group-yondr-toronto-cae3c4fc) | Yondr Group | Operational | 27 |
| [Cologix Toronto 1](https://dchub.cloud/facilities/cologix-cologix-toronto-1-a37f1f8b) | Cologix | Operational | 18 |
| [Bell Toronto](https://dchub.cloud/facilities/bell-canada-formally-group-telecom-bell-toronto-fd1e0ee3) | Bell Canada (formally Group Telecom) | Operational |  |
| [Canada15Edge Data Center](https://dchub.cloud/facilities/canada15edge-data-centers-canada15edge-data-center-be89661a) | Canada15Edge Data Centers | Operational |  |
| [Digital Realty YYZ12 Toronto (151 Front Street)](https://dchub.cloud/facilities/digital-realty-digital-realty-yyz12-toronto-151-front-street-90c0e47c) | Digital Realty | Operational |  |
| [Rogers Data Center](https://dchub.cloud/facilities/rogers-data-center-874a585b) |  | Operational |  |
| [Telehouse Toronto (151 Front St West)](https://dchub.cloud/facilities/telehouse-telehouse-toronto-151-front-st-west-b89e0af9) | Telehouse | Operational |  |
| [Telus](https://dchub.cloud/facilities/telus-telus-25df25aa) |  | Operational |  |
| [eStruxture TOR-2](https://dchub.cloud/facilities/estruxture-data-centers-inc-estruxture-tor-2-a7d64cfb) | eStruxture Data Centers Inc. | Operational |  |
| [eStruxture TOR-4](https://dchub.cloud/facilities/estruxture-data-centers-inc-estruxture-tor-4-d901cc64) | eStruxture Data Centers Inc. | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Canada](https://dchub.cloud/facilities/in/ca).

## More on Toronto

- [Toronto DCPI score](https://dchub.cloud/dcpi/toronto)
- [Toronto market brief](https://dchub.cloud/markets/toronto/brief)

### Email me when the Toronto DCPI verdict changes

Email me when Toronto's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Toronto: 705 MW tracked, any status — live, cited, and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=toronto) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=toronto)

JSON: [/api/v1/markets/toronto/deep-dive](https://dchub.cloud/api/v1/markets/toronto/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-10, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Toronto","item":"https://dchub.cloud/markets/toronto"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Toronto Data Center Market Deep-Dive",
 "datePublished":"2026-11-10T09:01:06.763580+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/toronto",
 "wordCount":255,
 "about":{"@type":"Place","name":"Toronto"},
 "description":"Live data-center market analysis. DCPI score 25.2/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "toronto", "name": "Toronto Data Center Market — DC Hub", "description": "Live data-center market measurements for Toronto, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/toronto", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Toronto"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 705.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 25.2, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:48:22."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "AVOID", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:48:22.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:48:22."}], "dateModified": "2026-11-10", "temporalCoverage": "2026-11-10"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/toronto#webpage", "url": "https://dchub.cloud/markets/toronto", "name": "Toronto data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Toronto data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Toronto market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Toronto data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Toronto market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```