description: Is The Dalles a good data center market for power? DCPI verdict CAUTION, score 55.1/100 (WECC), as of 2026-11-12. 600 MW tracked across all listings, unverified included (as of 2026-11-07). Grid, queue and deal context for 300+ markets.
title: "The Dalles data centers: power, grid and capacity | DC Hub"
---

# The Dalles data center market

Power availability in The Dalles: DCPI verdict CAUTION, composite score 55.1 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 229 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the The Dalles data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the The Dalles market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**55.1/100**

MW, all listings**600**sum of the sites that report MW; some do notany status, unverified listings included

Verdict**CAUTION**

## The Dalles at a glance

The Dalles has 550 MW operational and 50 MW under construction among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are Google (600 MW).

Capacity by status, as of 2026-11-12

| Status | MW |
| --- | --- |
| Operational | 550 |
| Under construction | 50 |
| Total listed | 600 |

## Developers building or planning in The Dalles

| Operator | Under construction MW | Planned MW |
| --- | --- | --- |
| Google | 50 |  |

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

## Colocation lease rates in The Dalles

DC Hub does not hold a lease-rate figure for this market yet.

The Dalles hosts six tracked facilities totaling 600 MW across multiple operational statuses, with Google operating all six sites. A wind-driven grass fire burned near a Google data center construction site in the region, underscoring the rural location's exposure to seasonal hazards. The market remains dominated by a single operator, concentrating both infrastructure decisions and expansion trajectories in one entity's hands.

This combination means new power supply is possible but faces non-trivial infrastructure friction; parties pursuing additional capacity should expect to navigate upgrades to grid connectivity rather than assume unconstrained access to the region's underlying generation.

No recent deals are tracked in The Dalles' registry, leaving operator composition and expansion plans opaque.

## Data centers in The Dalles

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [Google Cloud us-west1 (Oregon)](https://dchub.cloud/facilities/google-google-cloud-us-west1-oregon-6a97c689) | Google | Operational | 300 |
| [Google The Dalles Data Center](https://dchub.cloud/facilities/google-google-the-dalles-data-center-89640cbf) | Google | Operational | 250 |
| [Google The Dalles Building 4](https://dchub.cloud/facilities/google-google-the-dalles-building-4-80c3ac7a) | Google | Under Construction | 50 |
| [Google The Dalles Oregon](https://dchub.cloud/facilities/google-google-the-dalles-oregon-d7560913) | Google | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Oregon](https://dchub.cloud/facilities/in/us/oregon).

## More on The Dalles

- [The Dalles DCPI score](https://dchub.cloud/dcpi/the-dalles)
- [The Dalles market brief](https://dchub.cloud/markets/the-dalles/brief)
- [Oregon data center market brief](https://dchub.cloud/states/oregon/brief)
- [Oregon data center tax incentives](https://dchub.cloud/states/oregon/data-center-incentives)

### Email me when the The Dalles DCPI verdict changes

Email me when The Dalles's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

The Dalles: 600 MW tracked, any status — live, cited, and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=the-dalles) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=the-dalles)

JSON: [/api/v1/markets/the-dalles/deep-dive](https://dchub.cloud/api/v1/markets/the-dalles/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"The Dalles","item":"https://dchub.cloud/markets/the-dalles"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"The Dalles Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:30:14.681311+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/the-dalles",
 "wordCount":229,
 "about":{"@type":"Place","name":"The Dalles"},
 "description":"Live data-center market analysis. DCPI score 55.1/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "the-dalles", "name": "The Dalles Data Center Market — DC Hub", "description": "Live data-center market measurements for The Dalles, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/the-dalles", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "The Dalles"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 600.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 55.1, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:46:53."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "CAUTION", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:46:53.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:46:53."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/the-dalles#webpage", "url": "https://dchub.cloud/markets/the-dalles", "name": "The Dalles data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the The Dalles data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the The Dalles market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the The Dalles data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the The Dalles market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```