---
description: Is Tempe a good data center market for power? DCPI verdict BUILD, score 69.2/100 (WECC), as of 2026-11-12. Grid, queue and deal context for 300+ markets.
title: "Tempe data centers: power, grid and capacity | DC Hub"
---

# Tempe data center market

Power availability in Tempe: DCPI verdict BUILD, composite score 69.2 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 263 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Tempe data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Tempe market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**69.2/100**

MW, all listings**0**any status, unverified listings included

Verdict**BUILD**

## Colocation lease rates in Tempe

DC Hub does not hold a lease-rate figure for this market yet.

EdgeConneX operates two sites in the market, while Alembic Computer Services, Inc., Omnis Network, and EdgeConneX Inc. each operate single facilities. No recent deals have been tracked in Tempe, and only one operator has submitted power consumption data to DC Hub's monitoring network. The fragmented operator base and limited reporting suggest a market still establishing its data center infrastructure footprint.

This combination signals that new power supply is accessible relative to current demand—a rare configuration.

Operator concentration in Tempe is light. EdgeConneX's presence across three tracked entities (two standalone facilities and one under EdgeConneX Inc.) represents the largest single operator footprint, but no dominant platform has emerged. The absence of tracked M&A activity into Tempe contrasts with the consolidation wave visible in nearby Phoenix and broader Southwest markets, where regional acquisitions have reshuffled operator rosters.

Power availability positions Tempe as a viable greenfield market for new site development, particularly for operators seeking grid access without competing for scarce utility capacity.

## Data centers in Tempe

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [Digital Realty Data Center](https://dchub.cloud/facilities/digital-realty-digital-realty-data-center-4d75fbc4) | Digital Realty | Operational |  |
| [EdgeConneX Phoenix (EDCPHX01)](https://dchub.cloud/facilities/edgeconnex-inc-edgeconnex-phoenix-edcphx01-fb732938) | EdgeConneX Inc. | Operational |  |
| [Omnis Network Phoenix](https://dchub.cloud/facilities/omnis-network-llc-omnis-network-phoenix-53f6e8a4) | Omnis Network, LLC | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Arizona](https://dchub.cloud/facilities/in/us/arizona).

## More on Tempe

- [Tempe DCPI score](https://dchub.cloud/dcpi/tempe)
- [Tempe market brief](https://dchub.cloud/markets/tempe/brief)
- [Arizona data center market brief](https://dchub.cloud/states/arizona/brief)
- [Arizona data center tax incentives](https://dchub.cloud/states/arizona/data-center-incentives)

### Email me when the Tempe DCPI verdict changes

Email me when Tempe's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Tempe market data is live in DC Hub — cited and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=tempe) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=tempe)

JSON: [/api/v1/markets/tempe/deep-dive](https://dchub.cloud/api/v1/markets/tempe/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Tempe","item":"https://dchub.cloud/markets/tempe"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Tempe Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:30:07.602916+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/tempe",
 "wordCount":263,
 "about":{"@type":"Place","name":"Tempe"},
 "description":"Live data-center market analysis. DCPI score 69.2/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "tempe", "name": "Tempe Data Center Market — DC Hub", "description": "Live data-center market measurements for Tempe, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/tempe", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Tempe"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 0.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 69.2, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:46:47."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "BUILD", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:46:47.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:46:47."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/tempe#webpage", "url": "https://dchub.cloud/markets/tempe", "name": "Tempe data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Tempe data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Tempe market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Tempe data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Tempe market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```
