---
description: Is Tampa a good data center market for power? DCPI verdict AVOID, score 30.4/100 (FRCC), as of 2026-11-12. 18 MW tracked across all listings, unverified included (as of 2026-11-07). Grid, queue and deal context for 300+ markets.
title: "Tampa data centers: power, grid and capacity | DC Hub"
---

# Tampa data center market

Power availability in Tampa: DCPI verdict AVOID, composite score 30.4 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 237 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Tampa data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Tampa market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**30.4/100**

MW, all listings**18**sum of the sites that report MW; most do notany status, unverified listings included

Verdict**AVOID**

## Tampa at a glance

Tampa has 18 MW operational among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are 365 Data Centers (10 MW) and Flexential (8 MW).

Capacity by status, as of 2026-11-12

| Status | MW |
| --- | --- |
| Operational | 18 |
| Total listed | 18 |

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

## Colocation lease rates in Tampa

DC Hub does not hold a lease-rate figure for this market yet.

The market remains fragmented, with no single operator commanding dominant capacity share. No recent deals have been tracked in this market during the current reporting window.

This combination—idle capacity coupled with procurement barriers—suggests that new power infrastructure expansion will face headwinds from both grid access limitations and the need to rationalize existing supply before adding incremental load.

Operator concentration remains modest. Carrier Core operates a single tracked facility, while Flexential Corp maintains 2 additional locations separate from the primary Flexential portfolio.

The Tampa market's power trajectory will depend on whether grid infrastructure investment can match incremental demand from the broader Southeast data center build cycle currently visible in neighboring markets.

## Data centers in Tampa

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [365 DC Tampa](https://dchub.cloud/facilities/365-data-centers-365-dc-tampa-6aa1c637) | 365 Data Centers | Operational | 10 |
| [Flexential Tampa](https://dchub.cloud/facilities/flexential-flexential-tampa-19a7e6ba) | Flexential | Operational | 8 |
| [AceHost Tampa](https://dchub.cloud/facilities/acehost-acehost-tampa-fe879452) | AceHost | Operational |  |
| [Centersquare Tampa (TPA1)](https://dchub.cloud/facilities/centersquare-centersquare-tampa-tpa1-081a4da9) | Centersquare | Operational |  |
| [Cyxtera Tampa TP1](https://dchub.cloud/facilities/cyxtera-cyxtera-tampa-tp1-96f42eef) | Cyxtera | Operational |  |
| [Flexential - Tampa/West (TPA01/02)](https://dchub.cloud/facilities/flexential-corp-flexential-tampawest-tpa0102-9e8febab) | Flexential Corp. | Operational |  |
| [Flexential Tampa - North](https://dchub.cloud/facilities/flexential-flexential-tampa-north-2fde947a) | Flexential | Operational |  |
| [Flexential Tampa - West](https://dchub.cloud/facilities/flexential-flexential-tampa-west-9faef0fb) | Flexential | Operational |  |
| [Frontier Tampa Main Tandem Office](https://dchub.cloud/facilities/frontier-florida-llc-frontier-tampa-main-tandem-office-f92f1a7f) | Frontier Florida LLC | Operational |  |
| [H5 Data Centers Tampa](https://dchub.cloud/facilities/365-data-centers-365-data-centers-tampa-ta1-4db3c312) | 365 Data Centers | Operational |  |
| [Hivelocity](https://dchub.cloud/facilities/hivelocity-llc-hivelocity-e18b88d1) | Hivelocity LLC | Operational |  |
| [The Franklin Exchange Tampa](https://dchub.cloud/facilities/the-wilson-company-the-franklin-exchange-tampa-a6e1aaaf) | The Wilson Company | Operational |  |
| [WOW! Business (Tampa Datacenter)](https://dchub.cloud/facilities/wow-wow-business-tampa-datacenter-afacd0b1) | WOW! | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Florida](https://dchub.cloud/facilities/in/us/florida).

## More on Tampa

- [Tampa DCPI score](https://dchub.cloud/dcpi/tampa)
- [Tampa market brief](https://dchub.cloud/markets/tampa/brief)
- [Florida data center market brief](https://dchub.cloud/states/florida/brief)
- [Florida data center tax incentives](https://dchub.cloud/states/florida/data-center-incentives)

### Email me when the Tampa DCPI verdict changes

Email me when Tampa's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Tampa: 18 MW tracked, any status — live, cited, and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=tampa) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=tampa)

JSON: [/api/v1/markets/tampa/deep-dive](https://dchub.cloud/api/v1/markets/tampa/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Tampa","item":"https://dchub.cloud/markets/tampa"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Tampa Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:29:58.723235+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/tampa",
 "wordCount":237,
 "about":{"@type":"Place","name":"Tampa"},
 "description":"Live data-center market analysis. DCPI score 30.4/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "tampa", "name": "Tampa Data Center Market — DC Hub", "description": "Live data-center market measurements for Tampa, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/tampa", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Tampa"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 18.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 30.4, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:45:48."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "AVOID", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:45:48.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:45:48."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/tampa#webpage", "url": "https://dchub.cloud/markets/tampa", "name": "Tampa data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Tampa data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Tampa market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Tampa data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Tampa market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```
