# Syracuse data center market

Power availability in Syracuse: DCPI verdict CAUTION, composite score 49.2 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 275 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Syracuse data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Syracuse market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**49.2/100**

MW, all listings**0**any status, unverified listings included

Verdict**CAUTION**

## Colocation lease rates in Syracuse

DC Hub does not hold a lease-rate figure for this market yet.

The market has generated no recent deal activity in the tracked dataset. Only one facility in the market currently reports megawatt consumption to DC Hub, indicating limited transparency into aggregate demand or utilization patterns across the region.

The CAUTION verdict does not preclude new power procurement, but it signals that power availability is not automatic and project timelines should account for utility negotiation.

No recent deals have been tracked in Syracuse, leaving operator activity opaque. The regional political environment around data center siting—documented in concurrent Syracuse.com coverage—suggests ongoing community-level friction around facility expansion and land use, which may influence both deal announcements and permitting velocity. Lightboard's dual-site presence in the market indicates some consolidation or multi-facility strategy, while the presence of five single-site operators points to a market where regional and smaller independent operators retain meaningful presence rather than being fully dominated by hyperscale entrants.

## Data centers in Syracuse

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [Northland Communications - Syracuse](https://dchub.cloud/facilities/northland-communications-northland-communications-syracuse-746edd9e) | Northland Communications | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [New York](https://dchub.cloud/facilities/in/us/new-york).

## More on Syracuse

- [Syracuse DCPI score](https://dchub.cloud/dcpi/syracuse)
- [Syracuse market brief](https://dchub.cloud/markets/syracuse/brief)
- [New York data center market brief](https://dchub.cloud/states/new-york/brief)
- [New York data center tax incentives](https://dchub.cloud/states/new-york/data-center-incentives)

### Email me when the Syracuse DCPI verdict changes

Email me when Syracuse's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Syracuse market data is live in DC Hub — cited and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=syracuse) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=syracuse)

JSON: [/api/v1/markets/syracuse/deep-dive](https://dchub.cloud/api/v1/markets/syracuse/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Syracuse","item":"https://dchub.cloud/markets/syracuse"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Syracuse Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:29:39.158384+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/syracuse",
 "wordCount":275,
 "about":{"@type":"Place","name":"Syracuse"},
 "description":"Live data-center market analysis. DCPI score 49.2/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "syracuse", "name": "Syracuse Data Center Market — DC Hub", "description": "Live data-center market measurements for Syracuse, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/syracuse", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Syracuse"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 0.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 49.2, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:47:47."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "CAUTION", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:47:47.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:47:47."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/syracuse#webpage", "url": "https://dchub.cloud/markets/syracuse", "name": "Syracuse data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Syracuse data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Syracuse market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Syracuse data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Syracuse market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```