---
description: Is Stockholm a good data center market for power? DCPI verdict CAUTION, score 52.4/100 (NORDPOOL), as of 2026-11-12. Grid, queue and deal context for 300+ markets.
title: "Stockholm data centers: power, grid and capacity | DC Hub"
---

# Stockholm data center market

Power availability in Stockholm: DCPI verdict CAUTION, composite score 52.4 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 252 words · generated 2026-11-11 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Stockholm data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Stockholm market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**52.4/100**

MW, all listings**0**any status, unverified listings included

Verdict**CAUTION**

## Colocation lease rates in Stockholm

DC Hub does not hold a lease-rate figure for this market yet.

The market shows a fragmented competitive landscape dominated by established regional players with no single hyperscaler commanding outsized presence. Individual facility utilization and power capacity remain opaque, as only one site in the tracked registry has reported megawatt figures to the market.

New power procurement here will depend heavily on utility infrastructure upgrades and transmission availability rather than generation scarcity; developers cannot assume grid headroom simply because national power supply is adequate. This mismatch between generation surplus and local distribution tightness creates the caution signal.

No recent deals have been tracked in Stockholm's market, leaving operator expansion intentions unclear. These regional signals suggest operator appetite for Nordic presence remains intact, though Stockholm deal activity itself offers no direct evidence of near-term facility expansion, acquisition, or new site development. The operator roster remains stable and concentrated among the same five names.

Forward momentum will hinge on whether Swedish grid authority investments relieve the local distribution bottleneck that currently constrains new power access despite national generation surplus.

## Data centers in Stockholm

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [AWS EU North 1 (Stockholm)](https://dchub.cloud/facilities/amazon-web-services-aws-eu-north-1-stockholm-4ee24f7f) | Amazon Web Services | Operational |  |
| [Bahnhof](https://dchub.cloud/facilities/bahnhof-bahnhof-99566355) |  | Operational |  |
| [Bahnhof Pionen Stockholm](https://dchub.cloud/facilities/bahnhof-bahnhof-pionen-stockholm-d260a330) | Bahnhof | Operational |  |
| [Bahnhof Thule](https://dchub.cloud/facilities/bahnhof-bahnhof-thule-519eaf0a) | Bahnhof | Operational |  |
| [City Hosting](https://dchub.cloud/facilities/city-hosting-sweden-ab-city-hosting-3eb03fbc) | City Hosting Sweden AB | Operational |  |
| [Conapto Stockholm North](https://dchub.cloud/facilities/conapto-conapto-stockholm-north-59b929f9) | Conapto | Operational |  |
| [DigiPlex Stockholm DC](https://dchub.cloud/facilities/digiplex-digiplex-stockholm-dc-0600762b) | DigiPlex | Operational |  |
| [Digital Realty STO1 Stockholm](https://dchub.cloud/facilities/digital-realty-digital-realty-sto1-stockholm-00a81c61) | Digital Realty | Operational |  |
| [Digital Realty Stockholm STO1-STO5](https://dchub.cloud/facilities/digital-realty-digital-realty-stockholm-sto1-sto5-7e587a71) | Digital Realty | Operational |  |
| [Equinix SK1 - Stockholm, Bromma](https://dchub.cloud/facilities/equinix-equinix-sk1-stockholm-bromma-e9aea1ba) | Equinix | Operational |  |
| [Equinix SK2 - Stockholm, Sköndal](https://dchub.cloud/facilities/equinix-equinix-sk2-stockholm-skndal-554033ef) | Equinix | Operational |  |
| [Equinix SK3 - Stockholm, Spånga](https://dchub.cloud/facilities/equinix-equinix-sk3-stockholm-spnga-06b7006d) | Equinix | Operational |  |
| [Fiber Direkt B15](https://dchub.cloud/facilities/fiber-direkt-i-sverige-ab-fiber-direkt-b15-a7bd991a) | Fiber Direkt i Sverige AB | Operational |  |
| [Glesys Stockholm 1](https://dchub.cloud/facilities/glesys-ab-glesys-stockholm-fe5fbe83) | Glesys AB | Operational |  |
| [GlobalConnect Hammarby](https://dchub.cloud/facilities/globalconnect-group-globalconnect-hammarby-db713271) | GlobalConnect Group | Operational |  |
| [GlobalConnect Sätra](https://dchub.cloud/facilities/globalconnect-group-globalconnect-stra-d51f873f) | GlobalConnect Group | Operational |  |
| [Oracle Cloud Sweden Stockholm](https://dchub.cloud/facilities/oracle-oracle-cloud-sweden-stockholm-4eb6224f) | Oracle | Operational |  |
| [STOKAB KN3, Kista](https://dchub.cloud/facilities/ab-stokab-stokab-kn3-kista-0d7a0a26) | AB Stokab | Operational |  |
| [STOKAB KN5, Södermalm](https://dchub.cloud/facilities/ab-stokab-stokab-kn5-sdermalm-999a9fe8) | AB Stokab | Operational |  |
| [STOKAB KN6, Hammarby](https://dchub.cloud/facilities/ab-stokab-stokab-kn6-hammarby-a0f09c86) | AB Stokab | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Sweden](https://dchub.cloud/facilities/in/se).

## More on Stockholm

- [Stockholm DCPI score](https://dchub.cloud/dcpi/stockholm)
- [Stockholm market brief](https://dchub.cloud/markets/stockholm/brief)

### Email me when the Stockholm DCPI verdict changes

Email me when Stockholm's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Stockholm market data is live in DC Hub — cited and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=stockholm) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=stockholm)

JSON: [/api/v1/markets/stockholm/deep-dive](https://dchub.cloud/api/v1/markets/stockholm/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-11, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Stockholm","item":"https://dchub.cloud/markets/stockholm"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Stockholm Data Center Market Deep-Dive",
 "datePublished":"2026-11-11T05:23:59.628569+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/stockholm",
 "wordCount":252,
 "about":{"@type":"Place","name":"Stockholm"},
 "description":"Live data-center market analysis. DCPI score 52.4/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "stockholm", "name": "Stockholm Data Center Market — DC Hub", "description": "Live data-center market measurements for Stockholm, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/stockholm", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Stockholm"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 0.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 52.4, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:48:19."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "CAUTION", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:48:19.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:48:19."}], "dateModified": "2026-11-11", "temporalCoverage": "2026-11-11"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/stockholm#webpage", "url": "https://dchub.cloud/markets/stockholm", "name": "Stockholm data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Stockholm data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Stockholm market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Stockholm data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Stockholm market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```
