# Stamford data center market

Power availability in Stamford: DCPI verdict AVOID, composite score 32.8 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 199 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Stamford data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Stamford market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**32.8/100**

MW, all listings**0**any status, unverified listings included

Verdict**AVOID**

## Colocation lease rates in Stamford

DC Hub does not hold a lease-rate figure for this market yet.

No recent deals have been tracked in this market, and power capacity reporting remains sparse; only one tracked site has submitted megawatt data.

Together these scores suggest that operators seeking to add load or expand operations will encounter material obstacles in accessing new or firm power.

Deal activity in Stamford has recorded no transactions in the tracked window. The operator roster shows no dominant player—Cloudpath's three-site footprint is the largest holding—and no consolidation signals have emerged through M&A activity.

## Data centers in Stamford

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [Cloudpath CT1 (26 Fahey St)](https://dchub.cloud/facilities/cloudpath-llc-cloudpath-ct1-26-fahey-st-c5f0ec01) | Cloudpath LLC | Operational |  |
| [Cloudpath CT2 (1351 Washington Blvd)](https://dchub.cloud/facilities/cloudpath-llc-cloudpath-ct2-1351-washington-blvd-be006a72) | Cloudpath LLC | Operational |  |
| [Crown Castle Stamford](https://dchub.cloud/facilities/crown-castle-inc-crown-castle-stamford-700d0b94) | Crown Castle Inc. | Operational |  |
| [Lumen Stamford](https://dchub.cloud/facilities/lumen-technologies-lumen-stamford-8be4ec0f) | Lumen Technologies | Operational |  |
| [Omega CT1](https://dchub.cloud/facilities/omega-systems-consultants-llc-omega-ct1-4adc14a4) | Omega Systems Consultants, LLC | Operational |  |
| [amnet Data Center](https://dchub.cloud/facilities/amnet-data-center-946f9b6b) |  | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Connecticut](https://dchub.cloud/facilities/in/us/connecticut).

## More on Stamford

- [Stamford DCPI score](https://dchub.cloud/dcpi/stamford)
- [Stamford market brief](https://dchub.cloud/markets/stamford/brief)
- [Connecticut data center market brief](https://dchub.cloud/states/connecticut/brief)
- [Connecticut data center tax incentives](https://dchub.cloud/states/connecticut/data-center-incentives)

### Email me when the Stamford DCPI verdict changes

Email me when Stamford's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Stamford market data is live in DC Hub — cited and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=stamford) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=stamford)

JSON: [/api/v1/markets/stamford/deep-dive](https://dchub.cloud/api/v1/markets/stamford/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Stamford","item":"https://dchub.cloud/markets/stamford"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Stamford Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:28:09.885904+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/stamford",
 "wordCount":199,
 "about":{"@type":"Place","name":"Stamford"},
 "description":"Live data-center market analysis. DCPI score 32.8/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "stamford", "name": "Stamford Data Center Market — DC Hub", "description": "Live data-center market measurements for Stamford, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/stamford", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Stamford"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 0.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 32.8, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:47:01."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "AVOID", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:47:01.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:47:01."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/stamford#webpage", "url": "https://dchub.cloud/markets/stamford", "name": "Stamford data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Stamford data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Stamford market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Stamford data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Stamford market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```