---
description: Is St. Louis a good data center market for power? DCPI verdict CAUTION, score 49.5/100 (MISO), as of 2026-11-12. 18 MW tracked across all listings, unverified included (as of 2026-11-07). Grid, queue and deal context for 300+ markets.
title: "St. Louis data centers: power, grid and capacity | DC Hub"
---

# St. Louis data center market

Power availability in St. Louis: DCPI verdict CAUTION, composite score 49.5 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 199 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the St. Louis data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the St. Louis market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**49.5/100**

MW, all listings**18**sum of the sites that report MW; most do notany status, unverified listings included

Verdict**CAUTION**

## St. Louis at a glance

St. Louis has 18 MW operational among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are Netrality (12 MW) and TierPoint (6 MW).

Capacity by status, as of 2026-11-12

| Status | MW |
| --- | --- |
| Operational | 18 |
| Total listed | 18 |

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

## Colocation lease rates in St. Louis

DC Hub does not hold a lease-rate figure for this market yet.

The market has recorded no recent M&A activity in the tracked dataset. Municipal planning has advanced significantly, with St.

New power procurement in St. Louis will require navigating both physical grid limitations and the regulatory environment that has emerged around recent development proposals. Operators should expect permitting and interconnection timelines to reflect the heightened local scrutiny now embedded in the approval process.

Operator concentration remains modest, with Netrality and TierPoint controlling the largest individual footprints but neither dominating the market structurally. No recent deals have been tracked, indicating a period of consolidation pause rather than active M&A repositioning.

Power sourcing decisions in St.

## Data centers in St. Louis

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [Netrality 210 N Tucker](https://dchub.cloud/facilities/netrality-netrality-210-n-tucker-78e1eee6) | Netrality | Operational | 12 |
| [TierPoint St. Louis](https://dchub.cloud/facilities/tierpoint-tierpoint-st-louis-9a16a617) | TierPoint | Operational | 6 |
| [Cogent St Louis](https://dchub.cloud/facilities/cogent-communications-inc-cogent-st-louis-64916c80) | Cogent Communications, Inc. | Operational |  |
| [Netrality St. Louis - 210 N Tucker](https://dchub.cloud/facilities/netrality-data-centers-netrality-st-louis-210-n-tucker-8d14241c) | Netrality Data Centers | Operational |  |
| [TierPoint St. Louis - Olive](https://dchub.cloud/facilities/tierpoint-llc-tierpoint-st-louis-olive-3c05885c) | TierPoint, LLC | Operational |  |
| [TierPoint St. Louis - Walnut](https://dchub.cloud/facilities/tierpoint-llc-tierpoint-st-louis-walnut-c1dee294) | TierPoint, LLC | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Missouri](https://dchub.cloud/facilities/in/us/missouri).

## More on St. Louis

- [St. Louis DCPI score](https://dchub.cloud/dcpi/st-louis)
- [St. Louis market brief](https://dchub.cloud/markets/st-louis/brief)
- [Missouri data center market brief](https://dchub.cloud/states/missouri/brief)
- [Missouri data center tax incentives](https://dchub.cloud/states/missouri/data-center-incentives)

### Email me when the St. Louis DCPI verdict changes

Email me when St. Louis's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

St. Louis: 18 MW tracked, any status — live, cited, and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=st-louis) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=st-louis)

JSON: [/api/v1/markets/st-louis/deep-dive](https://dchub.cloud/api/v1/markets/st-louis/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"St Louis","item":"https://dchub.cloud/markets/st-louis"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"St. Louis Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:28:02.330948+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/st-louis",
 "wordCount":199,
 "about":{"@type":"Place","name":"St. Louis"},
 "description":"Live data-center market analysis. DCPI score 49.5/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "st-louis", "name": "St. Louis Data Center Market — DC Hub", "description": "Live data-center market measurements for St. Louis, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/st-louis", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "St. Louis"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 18.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 49.5, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:46:16."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "CAUTION", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:46:16.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:46:16."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/st-louis#webpage", "url": "https://dchub.cloud/markets/st-louis", "name": "St. Louis data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the St. Louis data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the St. Louis market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the St. Louis data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the St. Louis market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```
