description: Is Spokane a good data center market for power? DCPI verdict CAUTION, score 48.2/100 (WECC), as of 2026-11-12. Grid, queue and deal context for 300+ markets.
title: "Spokane data centers: power, grid and capacity | DC Hub"
---

# Spokane data center market

Power availability in Spokane: DCPI verdict CAUTION, composite score 48.2 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 235 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Spokane data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Spokane market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**48.2/100**

MW, all listings**0**any status, unverified listings included

Verdict**CAUTION**

## Colocation lease rates in Spokane

DC Hub does not hold a lease-rate figure for this market yet.

Cutting Edge Communications Spokane, Kiemle & Hagood, Lumen Technologies, Neutron LLC, and Neutron Spokane each operate single sites in the region. Only one facility operator has submitted measurable capacity data to DC Hub's tracking network, indicating limited transparency across the market's installed base.

The DCPI verdict of CAUTION reflects a structural tension in Spokane's power environment. Together, these readings suggest that Spokane can accommodate incremental capacity additions, but neither seamlessly nor cheaply. Operators pursuing new power will encounter real procurement timelines and upfront infrastructure costs.

No recent deals have been tracked in Spokane's data center market. The region's operator roster has remained static, with no announced acquisitions, lease expansions, or new facility launches recorded.

Spokane County's extension of a data center construction pause through June 2027 introduces regulatory uncertainty that will shape power infrastructure planning for the next 18 months.

## Data centers in Spokane

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [Neutron - Spokane](https://dchub.cloud/facilities/neutron-llc-neutron-spokane-77f2c075) | Neutron LLC | Operational |  |
| [TierPoint Spokane WA](https://dchub.cloud/facilities/tierpoint-tierpoint-spokane-wa-5a1b4f9e) | TierPoint | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Washington](https://dchub.cloud/facilities/in/us/washington).

## More on Spokane

- [Spokane DCPI score](https://dchub.cloud/dcpi/spokane)
- [Spokane market brief](https://dchub.cloud/markets/spokane/brief)
- [Washington data center market brief](https://dchub.cloud/states/washington/brief)
- [Washington data center tax incentives](https://dchub.cloud/states/washington/data-center-incentives)

### Email me when the Spokane DCPI verdict changes

Email me when Spokane's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Spokane market data is live in DC Hub — cited and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=spokane) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=spokane)

JSON: [/api/v1/markets/spokane/deep-dive](https://dchub.cloud/api/v1/markets/spokane/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Spokane","item":"https://dchub.cloud/markets/spokane"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Spokane Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:27:47.106734+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/spokane",
 "wordCount":235,
 "about":{"@type":"Place","name":"Spokane"},
 "description":"Live data-center market analysis. DCPI score 48.2/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "spokane", "name": "Spokane Data Center Market — DC Hub", "description": "Live data-center market measurements for Spokane, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/spokane", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Spokane"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 0.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 48.2, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:47:33."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "CAUTION", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:47:33.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:47:33."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/spokane#webpage", "url": "https://dchub.cloud/markets/spokane", "name": "Spokane data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Spokane data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Spokane market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Spokane data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Spokane market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```