---
description: Is Southfield a good data center market for power? DCPI verdict CAUTION, score 45.3/100 (MISO), as of 2026-11-12. 8 MW tracked across all listings, unverified included (as of 2026-11-07). Grid, queue and deal context for 300+ markets.
title: "Southfield data centers: power, grid and capacity | DC Hub"
---

# Southfield data center market

Power availability in Southfield: DCPI verdict CAUTION, composite score 45.3 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 242 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Southfield data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Southfield market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**45.3/100**

MW, all listings**8**sum of the sites that report MW; most do notany status, unverified listings included

Verdict**CAUTION**

This analysis was written on 2026-11-07, when the Data Center Power Index for this market read 45.2. The index is recomputed through the day and reads 45.3 now — the figure above is the live one, and the narrative below describes the market as it stood when it was written.

## Southfield at a glance

Southfield has 8 MW operational among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are 365 Data Centers (8 MW).

Capacity by status, as of 2026-11-12

| Status | MW |
| --- | --- |
| Operational | 8 |
| Total listed | 8 |

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

## Colocation lease rates in Southfield

DC Hub does not hold a lease-rate figure for this market yet.

The operator base shows no dominant player; the top five entities control ten of twelve tracked facilities. One tracked site currently reports power metrics; the remainder do not publicly disclose MW capacity.

This pairing means new power requests face real friction: utilities and grid operators are managing load growth actively, and securing incremental capacity will require navigating existing bottlenecks in distribution infrastructure rather than wholesale power scarcity. Sites seeking multi-megawatt allocations should expect longer lead times and higher coordination costs with local utility planning.

No recent deals are tracked in Southfield. The operator composition—dominated by mid-market and regional players rather than hyperscalers—reflects a market that has not seen recent M&A consolidation or announced lease commitments at scale. The market remains static in deal flow, with no evidence of new entrants, exits, or portfolio reshuffling among the current twelve tracked sites.

Southfield's power environment will likely remain a negotiating factor for any facility expansion or new build planning in the region.

## Data centers in Southfield

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [365 DC Detroit](https://dchub.cloud/facilities/365-data-centers-365-dc-detroit-386ce0f0) | 365 Data Centers | Operational | 8 |
| [123.NET - DC1 - 24700 Northwestern Hwy.](https://dchub.cloud/facilities/123net-llc-123net-dc1-24700-northwestern-hwy-d15827dd) | 123.Net, LLC. | Operational |  |
| [123.NET - DC2 - 24275 Northwestern Hwy.](https://dchub.cloud/facilities/123net-llc-123net-dc2-24275-northwestern-hwy-36ddc1bb) | 123.Net, LLC. | Operational |  |
| [123.NET - DC3 - 24245 Northwestern Hwy.](https://dchub.cloud/facilities/123net-llc-123net-dc3-24245-northwestern-hwy-a0491b79) | 123.Net, LLC. | Operational |  |
| [365 Data Centers Detroit (DT1)](https://dchub.cloud/facilities/365-data-centers-365-data-centers-detroit-dt1-431dc93b) | 365 Data Centers | Operational |  |
| [EDCDET01](https://dchub.cloud/facilities/telnet-worldwide-inc-edcdet01-2112f837) | TelNet Worldwide, Inc. | Operational |  |
| [EdgeConneX Detroit (EDCDET01)](https://dchub.cloud/facilities/edgeconnex-inc-edgeconnex-detroit-edcdet01-b8ae2777) | EdgeConneX Inc. | Operational |  |
| [EdgeConneX Detroit DET01](https://dchub.cloud/facilities/edgeconnex-edgeconnex-detroit-det01-5a34c0d8) | EdgeConneX | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Michigan](https://dchub.cloud/facilities/in/us/michigan).

## More on Southfield

- [Southfield DCPI score](https://dchub.cloud/dcpi/southfield)
- [Southfield market brief](https://dchub.cloud/markets/southfield/brief)
- [Michigan data center market brief](https://dchub.cloud/states/michigan/brief)
- [Michigan data center tax incentives](https://dchub.cloud/states/michigan/data-center-incentives)

### Email me when the Southfield DCPI verdict changes

Email me when Southfield's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Southfield: 8 MW tracked, any status — live, cited, and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=southfield) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=southfield)

JSON: [/api/v1/markets/southfield/deep-dive](https://dchub.cloud/api/v1/markets/southfield/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Southfield","item":"https://dchub.cloud/markets/southfield"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Southfield Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:27:39.343315+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/southfield",
 "wordCount":242,
 "about":{"@type":"Place","name":"Southfield"},
 "description":"Live data-center market analysis. DCPI score 45.3/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "southfield", "name": "Southfield Data Center Market — DC Hub", "description": "Live data-center market measurements for Southfield, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/southfield", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Southfield"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 8.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 45.3, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:46:21."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "CAUTION", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:46:21.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:46:21."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/southfield#webpage", "url": "https://dchub.cloud/markets/southfield", "name": "Southfield data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Southfield data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Southfield market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Southfield data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Southfield market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```
