---
description: Is South West Jordan a good data center market for power? DCPI verdict CAUTION, score 48.6/100 (WECC), as of 2026-11-12. Grid, queue and deal context for 300+ markets.
title: "South West Jordan data centers: power, grid and capacity | DC Hub"
---

# South West Jordan data center market

Power availability in South West Jordan: DCPI verdict CAUTION, composite score 48.6 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 257 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the South West Jordan data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the South West Jordan market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**48.6/100**

MW, all listings**0**any status, unverified listings included

Verdict**CAUTION**

## Colocation lease rates in South West Jordan

DC Hub does not hold a lease-rate figure for this market yet.

South West Jordan operates a four-facility market tracked by DC Hub, anchored by Aligned Data Centers (2 sites) and eBay (1 site). The region currently shows fragmented operator presence with limited transparency—only one tracked facility has reported megawatt capacity to the market. No recent deal activity has been recorded in this market segment.

This pairing means new capacity additions face real friction even where raw megawatt availability exists—grid modernization, line upgrades, or substation work may be prerequisites for large incremental loads.

Operator concentration remains loose across the four tracked sites. Aligned Data Centers holds the largest local footprint at two facilities, while eBay maintains a single presence. The absence of recent tracked transactions suggests the market is not currently active in M&A or site acquisition. Comparative regional context—West Jordan, for example, concentrates six facilities primarily under Flexential and Novva—highlights that South West Jordan has not yet consolidated to similar density levels.

Prospective operators should factor interconnection timelines and grid reinforcement requirements into site evaluation.

## Data centers in South West Jordan

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [Aligned Salt Lake (SLC-01)](https://dchub.cloud/facilities/aligned-data-centers-aligned-salt-lake-slc-01-4320c937) | Aligned Data Centers | Operational |  |
| [eBay](https://dchub.cloud/facilities/ebay-ebay-da342478) |  | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Utah](https://dchub.cloud/facilities/in/us/utah).

## More on South West Jordan

- [South West Jordan DCPI score](https://dchub.cloud/dcpi/south-west-jordan)
- [South West Jordan market brief](https://dchub.cloud/markets/south-west-jordan/brief)
- [Utah data center market brief](https://dchub.cloud/states/utah/brief)
- [Utah data center tax incentives](https://dchub.cloud/states/utah/data-center-incentives)

### Email me when the South West Jordan DCPI verdict changes

Email me when South West Jordan's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

South West Jordan market data is live in DC Hub — cited and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=south-west-jordan) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=south-west-jordan)

JSON: [/api/v1/markets/south-west-jordan/deep-dive](https://dchub.cloud/api/v1/markets/south-west-jordan/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"South West Jordan","item":"https://dchub.cloud/markets/south-west-jordan"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"South West Jordan Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:27:31.807858+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/south-west-jordan",
 "wordCount":257,
 "about":{"@type":"Place","name":"South West Jordan"},
 "description":"Live data-center market analysis. DCPI score 48.6/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "south-west-jordan", "name": "South West Jordan Data Center Market — DC Hub", "description": "Live data-center market measurements for South West Jordan, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/south-west-jordan", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "South West Jordan"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 0.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 48.6, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:49:43."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "CAUTION", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:49:43.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:49:43."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/south-west-jordan#webpage", "url": "https://dchub.cloud/markets/south-west-jordan", "name": "South West Jordan data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the South West Jordan data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the South West Jordan market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the South West Jordan data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the South West Jordan market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```
