# South Charleston data center market

Power availability in South Charleston: DCPI verdict AVOID, composite score 22.1 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 237 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the South Charleston data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the South Charleston market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**22.1/100**

MW, all listings**0**any status, unverified listings included

Verdict**AVOID**

## Colocation lease rates in South Charleston

DC Hub does not hold a lease-rate figure for this market yet.

South Charleston operates three tracked facilities across a fragmented operator base with no recent deal activity on record. Alpha Innovations, Alpha Technologies Inc., and SecureNet each operate one facility in the market. The absence of reported megawatt data from site operators limits visibility into aggregate capacity, though the three-operator split indicates no single dominant infrastructure player.

The DCPI verdict reflects substantial headwinds for new power procurement. Together, these scores suggest that sourcing incremental megawatts for new data center infrastructure would face both supply scarcity and grid-side operational friction. The AVOID designation reflects the power access outlook specifically, not broader market fundamentals.

Three single-facility operators suggest either organic standalone builds or older M&A activity predating current tracking.

## Data centers in South Charleston

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [Alpha Federal](https://dchub.cloud/facilities/alpha-innovations-alpha-federal-75fad3bd) | Alpha Innovations | Operational |  |
| [Alpha Technologies DC1](https://dchub.cloud/facilities/alpha-technologies-inc-alpha-technologies-dc1-d14ef872) | Alpha Technologies Inc. | Operational |  |
| [SecureNet DC1](https://dchub.cloud/facilities/securenet-securenet-dc1-cd67d891) | SecureNet | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [West Virginia](https://dchub.cloud/facilities/in/us/west-virginia).

## More on South Charleston

- [South Charleston DCPI score](https://dchub.cloud/dcpi/south-charleston)
- [South Charleston market brief](https://dchub.cloud/markets/south-charleston/brief)
- [West Virginia data center market brief](https://dchub.cloud/states/west-virginia/brief)
- [West Virginia data center tax incentives](https://dchub.cloud/states/west-virginia/data-center-incentives)

### Email me when the South Charleston DCPI verdict changes

Email me when South Charleston's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

South Charleston market data is live in DC Hub — cited and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=south-charleston) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=south-charleston)

JSON: [/api/v1/markets/south-charleston/deep-dive](https://dchub.cloud/api/v1/markets/south-charleston/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"South Charleston","item":"https://dchub.cloud/markets/south-charleston"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"South Charleston Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:27:25.118973+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/south-charleston",
 "wordCount":237,
 "about":{"@type":"Place","name":"South Charleston"},
 "description":"Live data-center market analysis. DCPI score 22.1/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "south-charleston", "name": "South Charleston Data Center Market — DC Hub", "description": "Live data-center market measurements for South Charleston, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/south-charleston", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "South Charleston"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 0.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 22.1, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:49:33."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "AVOID", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:49:33.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:49:33."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/south-charleston#webpage", "url": "https://dchub.cloud/markets/south-charleston", "name": "South Charleston data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the South Charleston data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the South Charleston market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the South Charleston data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the South Charleston market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```