Power availability in Somerville: DCPI verdict AVOID, composite score 31.7 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 256 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Somerville data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Somerville market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**31.7/100**

MW, all listings**0**any status, unverified listings included

Verdict**AVOID**

## Colocation lease rates in Somerville

DC Hub does not hold a lease-rate figure for this market yet.

Somerville's tracked market comprises seven facilities across a fragmented operator base. CoreSite operates three sites, while FirstLight Fiber, TOWARDEX Technologies International, VPLS, and CORESITE RE 70 INNERBELT LLC each operate single facilities. No recent deals have been recorded in this market, and tracked site operators have not publicly reported megawatt capacity figures.

Together these metrics signal that new power connections will face friction: grid upgrades may be required, utility coordination windows may be narrow, and permitting timelines for distribution infrastructure could extend project schedules.

No acquisitions, build-to-suit transactions, or capacity expansions have been recorded in recent tracking windows, which reflects rational operator behavior in markets where spare power is scarce. When incremental supply is difficult to secure, neither new entrants nor existing operators typically initiate facility expansion or acquisition rounds.

Site planners and operators should expect that power procurement in Somerville will require either direct utility engagement for dedicated feeds, extended lead times for grid reinforcement, or location-specific trade-offs between facility density and power availability.

## Data centers in Somerville

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [CORESITE RE 70 INNERBELT LLC](https://dchub.cloud/facilities/coresite-re-70-innerbelt-llc-30e90a2d) | CoreSite |  |  |
| [CoreSite - Boston (BO1)](https://dchub.cloud/facilities/coresite-coresite-boston-bo1-90d31058) | CoreSite | Operational |  |
| [Evocative BOS1](https://dchub.cloud/facilities/vpls-evocative-bos1-63ee7b21) | VPLS | Operational |  |
| [Hub Express System](https://dchub.cloud/facilities/towardex-technologies-international-inc-hub-express-system-6586c4bd) | TOWARDEX Technologies International, Inc. | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Massachusetts](https://dchub.cloud/facilities/in/us/massachusetts).

## More on Somerville

- [Somerville DCPI score](https://dchub.cloud/dcpi/somerville)
- [Somerville market brief](https://dchub.cloud/markets/somerville/brief)
- [Massachusetts data center market brief](https://dchub.cloud/states/massachusetts/brief)
- [Massachusetts data center tax incentives](https://dchub.cloud/states/massachusetts/data-center-incentives)

### Email me when the Somerville DCPI verdict changes

Email me when Somerville's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Somerville market data is live in DC Hub — cited and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=somerville) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=somerville)

JSON: [/api/v1/markets/somerville/deep-dive](https://dchub.cloud/api/v1/markets/somerville/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Somerville","item":"https://dchub.cloud/markets/somerville"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Somerville Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:27:15.579923+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/somerville",
 "wordCount":256,
 "about":{"@type":"Place","name":"Somerville"},
 "description":"Live data-center market analysis. DCPI score 31.7/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "somerville", "name": "Somerville Data Center Market — DC Hub", "description": "Live data-center market measurements for Somerville, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/somerville", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Somerville"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 0.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 31.7, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:47:55."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "AVOID", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:47:55.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:47:55."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/somerville#webpage", "url": "https://dchub.cloud/markets/somerville", "name": "Somerville data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Somerville data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Somerville market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Somerville data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Somerville market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```