description: Is Somerset a good data center market for power? DCPI verdict AVOID, score 22.0/100 (PJM), as of 2026-11-12. 500 MW tracked across all listings, unverified included (as of 2026-11-07). Grid, queue and deal context for 300+ markets.
title: "Somerset data centers: power, grid and capacity | DC Hub"
---

# Somerset data center market

Power availability in Somerset: DCPI verdict AVOID, composite score 22 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 292 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Somerset data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Somerset market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**22.0/100**

MW, all listings**500**sum of the sites that report MW; most do notany status, unverified listings included

Verdict**AVOID**

This analysis was written on 2026-11-07, when the Data Center Power Index for this market read 22.2. The index is recomputed through the day and reads 22.0 now — the figure above is the live one, and the narrative below describes the market as it stood when it was written.

## Colocation lease rates in Somerset

DC Hub does not hold a lease-rate figure for this market yet.

Only one tracked facility publicly reports megawatt capacity, signaling opacity across the broader operational footprint. The operator base remains thin—beyond CyrusOne's dominance, Rackspace maintains a single tracked presence with its Belmont NYC2 facility.

The DCPI verdict reflects limited headroom for new power sourcing. Operators seeking to add capacity here should expect elevated grid interconnection timelines and higher marginal costs for power acquisition.

Deal flow has stalled entirely: no recent transactions are tracked in Somerset. The absence of named recent deals is consistent with operator focus on managing existing assets rather than pursuing growth through procurement.

Market evolution will depend on utility-side investment in transmission and generation serving the Somerset region; absent that infrastructure expansion, power scarcity will remain the primary limiting factor for the foreseeable future.

## Data centers in Somerset

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [BNY Mellon Somerset](https://dchub.cloud/facilities/bny-mellon-somerset-bny-mellon-somerset-71f1bc2e) |  | Operational |  |
| [CyrusOne NJ-1](https://dchub.cloud/facilities/cyrusone-inc-cyrusone-nj-1-6bb77018) | CyrusOne Inc. | Operational |  |
| [CyrusOne Somerset](https://dchub.cloud/facilities/cyrusone-cyrusone-somerset-7bd969b9) | CyrusOne | Operational |  |
| [Rackspace Belmont NYC2](https://dchub.cloud/facilities/rackspace-belmont-nyc2-rackspace-belmont-nyc2-599e835f) |  | Operational |  |
| [Rackspace Somerset NYC1](https://dchub.cloud/facilities/rackspace-somerset-nyc1-rackspace-somerset-nyc1-14ab5e4c) |  | Operational |  |
| [Somerset, NJ, NYM1](https://dchub.cloud/facilities/cyrusone-somerset-nj-nym1-07432c4e) | CyrusOne | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [New Jersey](https://dchub.cloud/facilities/in/us/new-jersey).

## More on Somerset

- [Somerset DCPI score](https://dchub.cloud/dcpi/somerset)
- [Somerset market brief](https://dchub.cloud/markets/somerset/brief)
- [New Jersey data center market brief](https://dchub.cloud/states/new-jersey/brief)
- [New Jersey data center tax incentives](https://dchub.cloud/states/new-jersey/data-center-incentives)

### Email me when the Somerset DCPI verdict changes

Email me when Somerset's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Somerset: 500 MW tracked, any status — live, cited, and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=somerset) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=somerset)

JSON: [/api/v1/markets/somerset/deep-dive](https://dchub.cloud/api/v1/markets/somerset/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Somerset","item":"https://dchub.cloud/markets/somerset"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Somerset Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:27:07.990123+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/somerset",
 "wordCount":292,
 "about":{"@type":"Place","name":"Somerset"},
 "description":"Live data-center market analysis. DCPI score 22.0/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "somerset", "name": "Somerset Data Center Market — DC Hub", "description": "Live data-center market measurements for Somerset, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/somerset", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Somerset"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 500.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 22.0, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:46:11."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "AVOID", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:46:11.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:46:11."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/somerset#webpage", "url": "https://dchub.cloud/markets/somerset", "name": "Somerset data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Somerset data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Somerset market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Somerset data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Somerset market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```