description: Is Social Circle a good data center market for power? DCPI verdict AVOID, score 24.7/100 (SOCO), as of 2026-11-12. 80 MW tracked across all listings, unverified included (as of 2026-11-07). Grid, queue and deal context for 300+ markets.
title: "Social Circle data centers: power, grid and capacity | DC Hub"
---

# Social Circle data center market

Power availability in Social Circle: DCPI verdict AVOID, composite score 24.7 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 282 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Social Circle data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Social Circle market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**24.7/100**

MW, all listings**80**sum of the sites that report MW; most do notany status, unverified listings included

Verdict**AVOID**

## Social Circle at a glance

Social Circle has 40 MW under construction among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are Meta (40 MW).

Capacity by status, as of 2026-11-12

| Status | MW |
| --- | --- |
| Under construction | 40 |
| Total listed | 40 |

## Developers building or planning in Social Circle

| Operator | Under construction MW | Planned MW |
| --- | --- | --- |
| Meta | 40 |  |

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

## Colocation lease rates in Social Circle

DC Hub does not hold a lease-rate figure for this market yet.

Meta operates two sites in the market, while MORNING HORNET, LLC and Meta Platforms each operate one facility. The market remains concentrated among a small operator cohort with no recent deal activity recorded.

Prospective operators should anticipate limited optionality for power sourcing through standard utility channels.

No recent deals have been tracked in Social Circle, leaving the transaction registry blank. Meta's dual-site presence suggests sustained operational commitment, though the absence of M&A activity or new entrant announcements points to limited secondary market liquidity. The operator base remains small and static, with neither consolidation nor competitive entry evident in recent periods. This dormancy contrasts with adjacent Georgia markets where build activity and M&A flow have been more active—notably, a Tampa contractor recently acquired a data center firm behind a 625-acre Georgia campus, and Carrier Connect secured a full-facility lease for 4 MW outside Atlanta, demonstrating regional development momentum that has not materialized in Social Circle specifically.

## Data centers in Social Circle

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [Meta Stanton Springs Building 5](https://dchub.cloud/facilities/meta-meta-stanton-springs-building-5-4856c1e2) | Meta | Under Construction | 40 |
| [Meta Stanton Springs Data Center](https://dchub.cloud/facilities/meta-meta-stanton-springs-data-center-1e86f624) | Meta | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Georgia](https://dchub.cloud/facilities/in/us/georgia).

## More on Social Circle

- [Social Circle DCPI score](https://dchub.cloud/dcpi/social-circle)
- [Social Circle market brief](https://dchub.cloud/markets/social-circle/brief)
- [Georgia data center market brief](https://dchub.cloud/states/georgia/brief)
- [Georgia data center tax incentives](https://dchub.cloud/states/georgia/data-center-incentives)

### Email me when the Social Circle DCPI verdict changes

Email me when Social Circle's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Social Circle: 80 MW tracked, any status — live, cited, and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=social-circle) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=social-circle)

JSON: [/api/v1/markets/social-circle/deep-dive](https://dchub.cloud/api/v1/markets/social-circle/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Social Circle","item":"https://dchub.cloud/markets/social-circle"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Social Circle Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:26:44.005923+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/social-circle",
 "wordCount":282,
 "about":{"@type":"Place","name":"Social Circle"},
 "description":"Live data-center market analysis. DCPI score 24.7/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "social-circle", "name": "Social Circle Data Center Market — DC Hub", "description": "Live data-center market measurements for Social Circle, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/social-circle", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Social Circle"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 80.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 24.7, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:50:04."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "AVOID", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:50:04.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:50:04."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/social-circle#webpage", "url": "https://dchub.cloud/markets/social-circle", "name": "Social Circle data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Social Circle data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Social Circle market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Social Circle data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Social Circle market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```