# Sioux Falls data center market

Power availability in Sioux Falls: DCPI verdict AVOID, composite score 34.1 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 219 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Sioux Falls data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Sioux Falls market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**34.1/100**

MW, all listings**0**any status, unverified listings included

Verdict**AVOID**

## Colocation lease rates in Sioux Falls

DC Hub does not hold a lease-rate figure for this market yet.

The market has drawn multi-year interest from developers—a 164-acre data center proposal has moved through city planning, and the Sioux Falls City Council approved rezoning for proposed data center land—but these efforts reflect pipeline activity rather than executed supply. No recent deals have been tracked in this market.

Together, these scores mean that operators pursuing incremental power additions will face longer lead times, higher interconnection costs, and potentially limited windows for new builds.

Operator concentration is moderate but not consolidated. TierPoint operates two distinct facilities plus one entity registered as "Tierpoint Sioux Falls," while South Dakota Network (SDN Communications) holds two sites. The USGS EROS Data Center rounds out the tracked base. The operator roster suggests regional and mission-specific players rather than national platform builders.

## Data centers in Sioux Falls

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [Midco Sioux Falls](https://dchub.cloud/facilities/midcontinent-communications-midco-sioux-falls-0ee15dfd) | Midcontinent Communications | Operational |  |
| [SDN Communication Mark Shlanta Technology Park](https://dchub.cloud/facilities/south-dakota-network-dba-sdn-communications-sdn-communication-mark-shlanta-technology-park-3bffe77a) | South Dakota Network dba SDN Communications | Operational |  |
| [TierPoint Sioux Falls - East](https://dchub.cloud/facilities/tierpoint-llc-tierpoint-sioux-falls-east-377f7dc9) | TierPoint, LLC | Operational |  |
| [TierPoint Sioux Falls - West](https://dchub.cloud/facilities/tierpoint-llc-tierpoint-sioux-falls-west-e9748637) | TierPoint, LLC | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [South Dakota](https://dchub.cloud/facilities/in/us/south-dakota).

## More on Sioux Falls

- [Sioux Falls DCPI score](https://dchub.cloud/dcpi/sioux-falls)
- [Sioux Falls market brief](https://dchub.cloud/markets/sioux-falls/brief)
- [South Dakota data center market brief](https://dchub.cloud/states/south-dakota/brief)
- [South Dakota data center tax incentives](https://dchub.cloud/states/south-dakota/data-center-incentives)

### Email me when the Sioux Falls DCPI verdict changes

Email me when Sioux Falls's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Sioux Falls market data is live in DC Hub — cited and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=sioux-falls) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=sioux-falls)

JSON: [/api/v1/markets/sioux-falls/deep-dive](https://dchub.cloud/api/v1/markets/sioux-falls/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Sioux Falls","item":"https://dchub.cloud/markets/sioux-falls"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Sioux Falls Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:26:36.947534+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/sioux-falls",
 "wordCount":219,
 "about":{"@type":"Place","name":"Sioux Falls"},
 "description":"Live data-center market analysis. DCPI score 34.1/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "sioux-falls", "name": "Sioux Falls Data Center Market — DC Hub", "description": "Live data-center market measurements for Sioux Falls, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/sioux-falls", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Sioux Falls"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 0.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 34.1, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:47:03."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "AVOID", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:47:03.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:47:03."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/sioux-falls#webpage", "url": "https://dchub.cloud/markets/sioux-falls", "name": "Sioux Falls data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Sioux Falls data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Sioux Falls market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Sioux Falls data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Sioux Falls market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```