# Silver Spring data center market

Power availability in Silver Spring: DCPI verdict AVOID, composite score 22.9 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 244 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Silver Spring data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Silver Spring market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**22.9/100**

MW, all listings**0**any status, unverified listings included

Verdict**AVOID**

## Colocation lease rates in Silver Spring

DC Hub does not hold a lease-rate figure for this market yet.

The market has recorded no recent deal activity in the tracked dataset. Atlantech Online, Inc., DataBridge Sites, PROSPERITY DRIVE DATA CENTER, LLC, and Agile Data Sites each operate one facility in the region.

Together, these scores suggest that operators and site developers should anticipate extended timelines for power procurement and higher complexity in securing new supply agreements.

Operator fragmentation—five operators across 11 sites—reflects the typical structure of secondary markets in the Mid-Atlantic region. The absence of tracked deal flow in Silver Spring does not indicate market weakness but rather reflects the granular, non-disclosed nature of most real estate transactions at this scale.

Power availability remains the primary variable shaping feasibility for new or expanded capacity in Silver Spring through 2027.

## Data centers in Silver Spring

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [Agile Silver Spring](https://dchub.cloud/facilities/agile-data-sites-agile-silver-spring-371b9f2b) | Agile Data Sites | Operational |  |
| [Atlantech Online - Silver Spring, MD](https://dchub.cloud/facilities/atlantech-online-inc-atlantech-online-silver-spring-md-fca6df12) | Atlantech Online, Inc. | Operational |  |
| [Databridge Sites Silver Spring](https://dchub.cloud/facilities/databridge-sites-databridge-sites-silver-spring-0e23db7a) | DataBridge Sites | Operational |  |
| [KAISER PERMANENTE DATA CENTER](https://dchub.cloud/facilities/kaiser-permanente-data-center-c3a15d1e) |  |  |  |
| [Lincoln Rackhouse Maryland](https://dchub.cloud/facilities/lincoln-rackhouse-lincoln-rackhouse-maryland-22a4fbed) | Lincoln Rackhouse | Operational |  |
| [Lincoln Rackhouse Silver Spring](https://dchub.cloud/facilities/lincoln-rackhouse-lincoln-rackhouse-silver-spring-f62cf2e7) | Lincoln Rackhouse | Operational |  |
| [PROSPERITY DRIVE DATA CENTER, LLC](https://dchub.cloud/facilities/prosperity-drive-data-center-llc-dac48f05) |  |  |  |
| [VERIZON FAIRLAND DATA CENTER](https://dchub.cloud/facilities/verizon-fairland-data-center-43b9546a) |  |  |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Maryland](https://dchub.cloud/facilities/in/us/maryland).

## More on Silver Spring

- [Silver Spring DCPI score](https://dchub.cloud/dcpi/silver-spring)
- [Silver Spring market brief](https://dchub.cloud/markets/silver-spring/brief)
- [Maryland data center market brief](https://dchub.cloud/states/maryland/brief)
- [Maryland data center tax incentives](https://dchub.cloud/states/maryland/data-center-incentives)

### Email me when the Silver Spring DCPI verdict changes

Email me when Silver Spring's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Silver Spring market data is live in DC Hub — cited and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=silver-spring) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=silver-spring)

JSON: [/api/v1/markets/silver-spring/deep-dive](https://dchub.cloud/api/v1/markets/silver-spring/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Silver Spring","item":"https://dchub.cloud/markets/silver-spring"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Silver Spring Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:26:20.440492+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/silver-spring",
 "wordCount":244,
 "about":{"@type":"Place","name":"Silver Spring"},
 "description":"Live data-center market analysis. DCPI score 22.9/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "silver-spring", "name": "Silver Spring Data Center Market — DC Hub", "description": "Live data-center market measurements for Silver Spring, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/silver-spring", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Silver Spring"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 0.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 22.9, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:47:21."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "AVOID", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:47:21.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:47:21."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/silver-spring#webpage", "url": "https://dchub.cloud/markets/silver-spring", "name": "Silver Spring data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Silver Spring data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Silver Spring market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Silver Spring data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Silver Spring market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```