# Sheridan data center market

Power availability in Sheridan: DCPI verdict AVOID, composite score 35.4 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 253 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Sheridan data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Sheridan market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**35.4/100**

MW, all listings**0**any status, unverified listings included

Verdict**AVOID**

## Colocation lease rates in Sheridan

DC Hub does not hold a lease-rate figure for this market yet.

Sheridan's tracked data center footprint consists of two facilities operated by Advanced Communications Technology and DC HOST INC, with no recent deal activity recorded. The market has generated limited transaction history, and local operators remain individually positioned without consolidation. Community engagement around data center development is documented, with Sheridan residents actively weighing regulatory and infrastructure implications of facility expansion in the region.

Operators considering new builds or expansions should expect a measured, not unlimited, supply of new generation to support incremental load.

Sheridan's deal pipeline remains inactive with no tracked transactions. The two documented operators each control single facilities, indicating a fragmented market structure without dominant platform consolidation. This contrasts with some peer markets where single operators control significant portions of tracked sites, though those markets also show deal stagnation.

Regulatory and community considerations appear material to Sheridan's development trajectory, based on documented local discourse around data center expansion and responsible development frameworks. Power availability and grid access remain technical prerequisites, but permitting and stakeholder alignment will likely shape the pace at which new capacity materializes in this market.

## More on Sheridan

- [Sheridan DCPI score](https://dchub.cloud/dcpi/sheridan)
- [Sheridan market brief](https://dchub.cloud/markets/sheridan/brief)
- [Wyoming data center market brief](https://dchub.cloud/states/wyoming/brief)
- [Wyoming data center tax incentives](https://dchub.cloud/states/wyoming/data-center-incentives)

### Email me when the Sheridan DCPI verdict changes

Email me when Sheridan's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Sheridan market data is live in DC Hub — cited and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=sheridan) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=sheridan)

JSON: [/api/v1/markets/sheridan/deep-dive](https://dchub.cloud/api/v1/markets/sheridan/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Sheridan","item":"https://dchub.cloud/markets/sheridan"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Sheridan Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:26:53.608953+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/sheridan",
 "wordCount":253,
 "about":{"@type":"Place","name":"Sheridan"},
 "description":"Live data-center market analysis. DCPI score 35.4/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "sheridan", "name": "Sheridan Data Center Market — DC Hub", "description": "Live data-center market measurements for Sheridan, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/sheridan", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Sheridan"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 0.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 35.4, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:49:47."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "AVOID", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:49:47.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:49:47."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/sheridan#webpage", "url": "https://dchub.cloud/markets/sheridan", "name": "Sheridan data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Sheridan data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Sheridan market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Sheridan data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Sheridan market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```