# Seoul data center market

Power availability in Seoul: DCPI verdict AVOID, composite score 21.7 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 223 words · generated 2026-11-11 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Seoul data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Seoul market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**21.7/100**

MW, all listings**200**sum of the sites that report MW; most do notany status, unverified listings included

Verdict**AVOID**

## Seoul at a glance

Seoul has 40 MW under construction among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are STACK Infrastructure (40 MW).

Capacity by status, as of 2026-11-12

| Status | MW |
| --- | --- |
| Under construction | 40 |
| Total listed | 40 |

## Developers building or planning in Seoul

| Operator | Under construction MW | Planned MW |
| --- | --- | --- |
| STACK Infrastructure | 40 |  |

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

## Colocation lease rates in Seoul

DC Hub does not hold a lease-rate figure for this market yet.

The market is fragmented among four operators each running three facilities—LG Uplus Corp., KINX Inc., Equinix, and LG CNS—alongside Digital Edge with two tracked sites.

Operators pursuing expansion will encounter material friction on the power sourcing side.

Deal flow shows targeted rather than broad-based growth. This project, distinct from Digital Realty's completed second facility (first announced in 2021), indicates multiple operators are advancing Seoul-based development. LG's $910M commitment underscores confidence in market fundamentals, though the investment's specific allocation—whether toward new capacity, upgrades, or operations—remains unspecified.

Forward expansion in Seoul will depend on resolving grid-side friction rather than operator willingness to build.

## Data centers in Seoul

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [STACK Seoul](https://dchub.cloud/facilities/stack-infrastructure-stack-seoul-bb1b6bc1) | STACK Infrastructure | Under Construction | 40 |
| [AWS AP Northeast 2 (Seoul)](https://dchub.cloud/facilities/amazon-web-services-aws-ap-northeast-2-seoul-3d88880e) | Amazon Web Services | Operational |  |
| [Azure Korea Central Seoul](https://dchub.cloud/facilities/microsoft-azure-korea-central-seoul-43f7a413) | Microsoft | Operational |  |
| [KINX Dogok](https://dchub.cloud/facilities/kinx-inc-kinx-dogok-d59587a6) | KINX Inc. | Operational |  |
| [KINX Gasan](https://dchub.cloud/facilities/kinx-inc-kinx-gasan-5aabfafd) | KINX Inc. | Operational |  |
| [KINX Sangam](https://dchub.cloud/facilities/kinx-inc-kinx-sangam-9c20b7f4) | KINX Inc. | Operational |  |
| [KR1 강남데이터센터](https://dchub.cloud/facilities/kr1-286c5e2a) | 엠피리온 디지털 | Operational |  |
| [KT Mokdong IDC Seoul](https://dchub.cloud/facilities/kt-corporation-kt-mokdong-idc-seoul-9832b3b0) | KT Corporation | Operational |  |
| [Oracle Cloud Korea Seoul](https://dchub.cloud/facilities/oracle-oracle-cloud-korea-seoul-af3ee2b0) | Oracle | Operational |  |
| [SK브로드밴드 IDC](https://dchub.cloud/facilities/sk-sk-idc-cd58a907) | SK브로드밴드 | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [South Korea](https://dchub.cloud/facilities/in/kr).

## More on Seoul

- [Seoul DCPI score](https://dchub.cloud/dcpi/seoul)
- [Seoul market brief](https://dchub.cloud/markets/seoul/brief)

### Email me when the Seoul DCPI verdict changes

Email me when Seoul's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Seoul: 200 MW tracked, any status — live, cited, and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=seoul) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=seoul)

JSON: [/api/v1/markets/seoul/deep-dive](https://dchub.cloud/api/v1/markets/seoul/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-11, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Seoul","item":"https://dchub.cloud/markets/seoul"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Seoul Data Center Market Deep-Dive",
 "datePublished":"2026-11-11T09:01:14.475901+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/seoul",
 "wordCount":223,
 "about":{"@type":"Place","name":"Seoul"},
 "description":"Live data-center market analysis. DCPI score 21.7/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "seoul", "name": "Seoul Data Center Market — DC Hub", "description": "Live data-center market measurements for Seoul, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/seoul", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Seoul"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 200.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 21.7, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:48:56."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "AVOID", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:48:56.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:48:56."}], "dateModified": "2026-11-11", "temporalCoverage": "2026-11-11"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/seoul#webpage", "url": "https://dchub.cloud/markets/seoul", "name": "Seoul data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Seoul data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Seoul market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Seoul data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Seoul market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```