---
description: Is Secaucus a good data center market for power? DCPI verdict AVOID, score 21.5/100 (PJM), as of 2026-11-12. 80 MW tracked across all listings, unverified included (as of 2026-11-07). Grid, queue and deal context for 300+ markets.
title: "Secaucus data centers: power, grid and capacity | DC Hub"
---

# Secaucus data center market

Power availability in Secaucus: DCPI verdict AVOID, composite score 21.5 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 266 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Secaucus data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Secaucus market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**21.5/100**

MW, all listings**80**sum of the sites that report MW; most do notany status, unverified listings included

Verdict**AVOID**

This analysis was written on 2026-11-07, when the Data Center Power Index for this market read 21.7. The index is recomputed through the day and reads 21.5 now — the figure above is the live one, and the narrative below describes the market as it stood when it was written.

## Secaucus at a glance

Secaucus has 80 MW operational among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are Equinix (80 MW).

Capacity by status, as of 2026-11-12

| Status | MW |
| --- | --- |
| Operational | 80 |
| Total listed | 80 |

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

## Colocation lease rates in Secaucus

DC Hub does not hold a lease-rate figure for this market yet.

This assessment applies specifically to sourcing additional power supply—the metric does not reflect market demand, facility quality, or operator viability, but rather the physical and financial friction of expanding electrical infrastructure in the area.

Deal activity in Secaucus remains absent from recent tracking records, with no transactions logged. Historical local reporting referenced two forthcoming data center projects that would have increased the town's total facility count, though these do not appear in current tracked deals, suggesting either extended development timelines or changes in project status.

## Data centers in Secaucus

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [Equinix NJ Campus](https://dchub.cloud/facilities/equinix-equinix-nj-campus-26f01f95) | Equinix | Operational | 80 |
| [Centersquare NYC3 Data Center](https://dchub.cloud/facilities/centersquare-centersquare-nyc3-data-center-ac9ee9e5) | Centersquare | Operational |  |
| [Centersquare New Jersey (EWR5)](https://dchub.cloud/facilities/centersquare-centersquare-new-jersey-ewr5-d3e656ee) | Centersquare | Operational |  |
| [CoreSite - Secaucus (NY2)](https://dchub.cloud/facilities/coresite-coresite-secaucus-ny2-e7a47af4) | CoreSite | Operational |  |
| [CoreSite Secaucus Campus](https://dchub.cloud/facilities/coresite-coresite-secaucus-campus-3c52f2eb) | CoreSite | Operational |  |
| [Equinix NY2 Secaucus](https://dchub.cloud/facilities/equinix-equinix-ny2-secaucus-d0b19ee2) | Equinix | Operational |  |
| [Equinix NY2/NY4/NY5/NY6 - New York, Secaucus](https://dchub.cloud/facilities/equinix-equinix-ny2ny4ny5ny6-new-york-secaucus-fa61a016) | Equinix | Operational |  |
| [Equinix NY3 - New York, Secaucus](https://dchub.cloud/facilities/equinix-equinix-ny3-new-york-secaucus-46867701) | Equinix | Operational |  |
| [Equinix New York Secaucus NY5](https://dchub.cloud/facilities/equinix-equinix-new-york-secaucus-ny5-b5f4714f) | Equinix | Operational |  |
| [Equinix Secaucus NY6](https://dchub.cloud/facilities/equinix-equinix-secaucus-ny6-176df7ed) | Equinix | Operational |  |
| [Evocative EWR1](https://dchub.cloud/facilities/vpls-evocative-ewr1-bebfa156) | VPLS | Operational |  |
| [Evocative Secaucus](https://dchub.cloud/facilities/evocative-evocative-secaucus-f63d807b) | Evocative | Operational |  |
| [H5 Data Centers Secaucus (NJ01)](https://dchub.cloud/facilities/h5-data-centers-h5-data-centers-secaucus-nj01-17cf7c6d) | H5 Data Centers | Operational |  |
| [InterServer Teb2](https://dchub.cloud/facilities/interserver-inc-interserver-teb2-f8df66f8) | InterServer, Inc | Operational |  |
| [InterServer Teb4](https://dchub.cloud/facilities/interserver-inc-interserver-teb4-ca54acb2) | InterServer, Inc | Operational |  |
| [NJDC2 - 300 J F Kennedy Blvd](https://dchub.cloud/facilities/colocation-america-corporation-njdc2-300-j-f-kennedy-blvd-bf731b00) | Colocation America Corporation | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [New Jersey](https://dchub.cloud/facilities/in/us/new-jersey).

## More on Secaucus

- [Secaucus DCPI score](https://dchub.cloud/dcpi/secaucus)
- [Secaucus market brief](https://dchub.cloud/markets/secaucus/brief)
- [New Jersey data center market brief](https://dchub.cloud/states/new-jersey/brief)
- [New Jersey data center tax incentives](https://dchub.cloud/states/new-jersey/data-center-incentives)

### Email me when the Secaucus DCPI verdict changes

Email me when Secaucus's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Secaucus: 80 MW tracked, any status — live, cited, and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=secaucus) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=secaucus)

JSON: [/api/v1/markets/secaucus/deep-dive](https://dchub.cloud/api/v1/markets/secaucus/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Secaucus","item":"https://dchub.cloud/markets/secaucus"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Secaucus Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:26:11.455702+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/secaucus",
 "wordCount":266,
 "about":{"@type":"Place","name":"Secaucus"},
 "description":"Live data-center market analysis. DCPI score 21.5/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "secaucus", "name": "Secaucus Data Center Market — DC Hub", "description": "Live data-center market measurements for Secaucus, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/secaucus", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Secaucus"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 80.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 21.5, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:45:41."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "AVOID", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:45:41.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:45:41."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/secaucus#webpage", "url": "https://dchub.cloud/markets/secaucus", "name": "Secaucus data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Secaucus data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Secaucus market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Secaucus data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Secaucus market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```
