---
description: Is Scottsdale a good data center market for power? DCPI verdict BUILD, score 69.2/100 (WECC), as of 2026-11-12. Grid, queue and deal context for 300+ markets.
title: "Scottsdale data centers: power, grid and capacity | DC Hub"
---

# Scottsdale data center market

Power availability in Scottsdale: DCPI verdict BUILD, composite score 69.2 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 237 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Scottsdale data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Scottsdale market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**69.2/100**

MW, all listings**0**any status, unverified listings included

Verdict**BUILD**

## Colocation lease rates in Scottsdale

DC Hub does not hold a lease-rate figure for this market yet.

Iron Mountain and Iron Mountain Data Centers each operate one tracked site, joined by K-Motion Interactive and Profit Finder Pro Software as single-facility operators. The absence of recent deal flow leaves market consolidation patterns unclear; only one tracked facility has reported capacity metrics to DC Hub.

Deal flow in Scottsdale remains dormant relative to peer Arizona markets. Phoenix has seen recent consolidation activity—RadiusDC announced its acquisition of PhoenixNAP's Phoenix data center and colocation business in March 2026—while Tempe and broader regional markets show no tracked M&A. The absence of deal records does not indicate demand weakness; rather, it reflects either pre-development activity, private transactions below tracking thresholds, or genuine market thinness at the M&A level.

## Data centers in Scottsdale

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [Iron Mountain Data Center - Scottsdale (AZS-1)](https://dchub.cloud/facilities/iron-mountain-data-centers-iron-mountain-data-center-scottsdale-azs-1-60bc1eac) | Iron Mountain Data Centers | Operational |  |
| [Sungard AS Scottsdale](https://dchub.cloud/facilities/sungard-availability-services-sungard-as-scottsdale-cece21ce) | Sungard Availability Services | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Arizona](https://dchub.cloud/facilities/in/us/arizona).

## More on Scottsdale

- [Scottsdale DCPI score](https://dchub.cloud/dcpi/scottsdale)
- [Scottsdale market brief](https://dchub.cloud/markets/scottsdale/brief)
- [Arizona data center market brief](https://dchub.cloud/states/arizona/brief)
- [Arizona data center tax incentives](https://dchub.cloud/states/arizona/data-center-incentives)

### Email me when the Scottsdale DCPI verdict changes

Email me when Scottsdale's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Scottsdale market data is live in DC Hub — cited and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=scottsdale) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=scottsdale)

JSON: [/api/v1/markets/scottsdale/deep-dive](https://dchub.cloud/api/v1/markets/scottsdale/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Scottsdale","item":"https://dchub.cloud/markets/scottsdale"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Scottsdale Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:26:03.516360+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/scottsdale",
 "wordCount":237,
 "about":{"@type":"Place","name":"Scottsdale"},
 "description":"Live data-center market analysis. DCPI score 69.2/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "scottsdale", "name": "Scottsdale Data Center Market — DC Hub", "description": "Live data-center market measurements for Scottsdale, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/scottsdale", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Scottsdale"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 0.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 69.2, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:46:51."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "BUILD", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:46:51.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:46:51."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/scottsdale#webpage", "url": "https://dchub.cloud/markets/scottsdale", "name": "Scottsdale data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Scottsdale data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Scottsdale market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Scottsdale data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Scottsdale market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```
