---
description: Is Santiago a good data center market for power? DCPI verdict CAUTION, score 44.8/100 (CEN), as of 2026-11-12. 18 MW tracked across all listings, unverified included (as of 2026-11-11). Grid, queue and deal context for 300+ markets.
title: "Santiago data centers: power, grid and capacity | DC Hub"
---

# Santiago data center market

Power availability in Santiago: DCPI verdict CAUTION, composite score 44.8 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 226 words · generated 2026-11-11 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Santiago data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Santiago market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**44.8/100**

MW, all listings**18**sum of the sites that report MW; most do notany status, unverified listings included

Verdict**CAUTION**

## Santiago at a glance

Santiago has 18 MW operational among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are Ascenty (18 MW).

Capacity by status, as of 2026-11-12

| Status | MW |
| --- | --- |
| Operational | 18 |
| Total listed | 18 |

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

## Colocation lease rates in Santiago

DC Hub does not hold a lease-rate figure for this market yet.

Reporting on deployed capacity remains sparse—only one tracked operator discloses megawatt figures—making granular capacity assessment difficult.

The DCPI verdict of CAUTION reflects competing signals in Santiago's power environment. New power procurement will require navigation of Chile's approval processes and grid interconnection timelines; neither score suggests immediate scarcity, but neither confirms unencumbered access to incremental supply.

Santiago's operator roster remains stable, with no recorded transactions, acquisitions, or capital deployments among tracked facilities. This absence of recorded deal flow does not reflect market weakness; it indicates a consolidation phase or private deployment pattern not yet surfaced in public M&A channels.

Power procurement risk in Santiago hinges on grid interconnection capacity and regulatory timelines rather than on operator demand or facility availability.

## Data centers in Santiago

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [Ascenty Santiago 1](https://dchub.cloud/facilities/ascenty-ascenty-santiago-1-5a00156e) | Ascenty | Operational | 18 |
| [Adexus Santiago - CLink Extension](https://dchub.cloud/facilities/adexus-sa-adexus-santiago-clink-extension-cea65eb5) | Adexus S.A. | Operational |  |
| [Azure Chile Central Santiago](https://dchub.cloud/facilities/microsoft-azure-chile-central-santiago-82a4b58f) | Microsoft | Operational |  |
| [COLO 2](https://dchub.cloud/facilities/microsoft-colo-2-63948936) | Microsoft | Operational |  |
| [DC Porvenir](https://dchub.cloud/facilities/ingeniera-e-informtica-asociada-ltda-iia-ltda-dc-porvenir-6a45f235) | Ingeniería e Informática Asociada Ltda (IIA Ltda) | Operational |  |
| [GTD data center - Panamericana](https://dchub.cloud/facilities/gtd-gtd-data-center-panamericana-0c0300fc) | GTD | Operational |  |
| [Google Cloud southamerica-west1 Santiago](https://dchub.cloud/facilities/google-google-cloud-southamerica-west1-santiago-1cb5ec6a) | Google | Operational |  |
| [IBM data center / Centro Tecnológico San Bernardo](https://dchub.cloud/facilities/ibm-data-center-centro-tecnolgico-san-bernardo-46481d28) |  | Operational |  |
| [Odata Data Center](https://dchub.cloud/facilities/odata-data-center-odata-data-center-de60b395) |  | Operational |  |
| [Oracle Cloud Chile Santiago](https://dchub.cloud/facilities/oracle-oracle-cloud-chile-santiago-f2ec5d94) | Oracle | Operational |  |
| [SONDA - Kudos](https://dchub.cloud/facilities/sonda-sa-sonda-kudos-8010756c) | SONDA S.A. | Operational |  |
| [SONDA - Teatinos](https://dchub.cloud/facilities/sonda-sa-sonda-teatinos-0f7d8491) | SONDA S.A. | Operational |  |
| [entel - Data Center Amunategui](https://dchub.cloud/facilities/entel-chile-sa-entel-data-center-amunategui-3062e12e) | Entel Chile S.A. | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Chile](https://dchub.cloud/facilities/in/cl).

## More on Santiago

- [Santiago DCPI score](https://dchub.cloud/dcpi/santiago)
- [Santiago market brief](https://dchub.cloud/markets/santiago/brief)

### Email me when the Santiago DCPI verdict changes

Email me when Santiago's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Santiago: 18 MW tracked, any status — live, cited, and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=santiago) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=santiago)

JSON: [/api/v1/markets/santiago/deep-dive](https://dchub.cloud/api/v1/markets/santiago/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-11, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Santiago","item":"https://dchub.cloud/markets/santiago"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Santiago Data Center Market Deep-Dive",
 "datePublished":"2026-11-11T09:02:14.732854+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/santiago",
 "wordCount":226,
 "about":{"@type":"Place","name":"Santiago"},
 "description":"Live data-center market analysis. DCPI score 44.8/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "santiago", "name": "Santiago Data Center Market — DC Hub", "description": "Live data-center market measurements for Santiago, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/santiago", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Santiago"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 18.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 44.8, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:49:17."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "CAUTION", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:49:17.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:49:17."}], "dateModified": "2026-11-11", "temporalCoverage": "2026-11-11"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/santiago#webpage", "url": "https://dchub.cloud/markets/santiago", "name": "Santiago data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Santiago data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Santiago market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Santiago data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Santiago market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```
