# San Antonio data center market

Power availability in San Antonio: DCPI verdict CAUTION, composite score 42.3 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 256 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the San Antonio data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the San Antonio market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**42.3/100**

MW, all listings**1,747**sum of the sites that report MW; most do notany status, unverified listings included

Verdict**CAUTION**

## San Antonio at a glance

San Antonio has 847 MW operational among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are Microsoft (650 MW), H5 Data Centers (75 MW) and CyrusOne (57 MW).

Capacity by status, as of 2026-11-12

| Status | MW |
| --- | --- |
| Operational | 847 |
| Total listed | 847 |

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

## Colocation lease rates in San Antonio

Broker lease rates (CBRE/JLL): available on paid plans. Asking base rent per kW of critical IT capacity. Electricity is normally billed separately (metered pass-through), plus cross-connects and one-time fees. Signed deals, term and size change the number. Source: CBRE North America Data Center Trends H1 2026 (250+ kW): Austin-San Antonio (combined market) (figure on paid plans) [(link)](https://www.cbre.com/insights/books/north-america-data-center-trends-h1-2026)

The market has drawn regulatory attention: city officials have adopted stricter approval processes for new data center development, and Texas Research Park has emerged as a focal point for regional deployment.

This pairing means operators pursuing incremental capacity will encounter elevated friction in securing grid access and managing interconnection timelines; it does not preclude new builds, but it narrows the margin for oversized power bids or aggressive multi-site expansion plans without prior offtake certainty.

No recent deals are currently tracked in San Antonio, leaving operator consolidation and capacity transfers opaque.

Regulatory scrutiny and the CAUTION verdict together suggest San Antonio's next phase will hinge on grid infrastructure upgrades and interconnection queue management rather than land or operator availability. Watch for announcements of transmission or substation investments tied to specific facility phases.

## Data centers in San Antonio

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [Microsoft San Antonio Data Center](https://dchub.cloud/facilities/microsoft-microsoft-san-antonio-data-center-a5adc2fc) | Microsoft | Operational | 350 |
| [Microsoft Azure South Central US (Texas)](https://dchub.cloud/facilities/microsoft-microsoft-azure-south-central-us-texas-52e977d1) | Microsoft | Operational | 300 |
| [Microsoft](https://dchub.cloud/facilities/microsoft-san-antonio-4d30b4f7) |  | Operational | 50 |
| [H5 San Antonio 2](https://dchub.cloud/facilities/h5-data-centers-h5-san-antonio-2-56c66368) | H5 Data Centers | Operational | 45 |
| [H5 San Antonio 1](https://dchub.cloud/facilities/h5-data-centers-h5-san-antonio-1-ebeb1cdf) | H5 Data Centers | Operational | 30 |
| [CyrusOne San Antonio I](https://dchub.cloud/facilities/cyrusone-cyrusone-san-antonio-i-cc095c13) | CyrusOne | Operational | 19 |
| [CyrusOne San Antonio II](https://dchub.cloud/facilities/cyrusone-cyrusone-san-antonio-ii-94a28de3) | CyrusOne | Operational | 19 |
| [CyrusOne San Antonio III](https://dchub.cloud/facilities/cyrusone-cyrusone-san-antonio-iii-e68235c8) | CyrusOne | Operational | 19 |
| [CHRISTUS Health](https://dchub.cloud/facilities/christus-health-christus-health-4f39811a) |  | Operational | 5 |
| [Frost Bank](https://dchub.cloud/facilities/frost-bank-frost-bank-d0fd5209) |  | Operational | 5 |
| [Lowe's Data Center](https://dchub.cloud/facilities/lowes-lowes-data-center-bc43b817) | Lowe's | Operational | 5 |
| [Amazon AWS SAT - 12807 Donop](https://dchub.cloud/facilities/amazon-web-services-amazon-aws-sat-12807-donop-5998c2c4) | Amazon Web Services | Operational |  |
| [Azure South Central US Texas](https://dchub.cloud/facilities/microsoft-azure-south-central-us-texas-7b1d632c) | Microsoft | Operational |  |
| [CyrusOne SAT10 & SAT11](https://dchub.cloud/facilities/cyrusone-cyrusone-sat10-sat11-49251eff) | CyrusOne | Operational |  |
| [H5 Data Centers San Antonio](https://dchub.cloud/facilities/h5-data-centers-h5-data-centers-san-antonio-4a69df07) | H5 Data Centers | Operational |  |
| [Lumen San Antonio 1](https://dchub.cloud/facilities/lumen-technologies-lumen-san-antonio-1-c67f1947) | Lumen Technologies | Operational |  |
| [Lumen San Antonio 2](https://dchub.cloud/facilities/lumen-technologies-lumen-san-antonio-2-8f6cb0fa) | Lumen Technologies | Operational |  |
| [Microsoft SAT 80](https://dchub.cloud/facilities/microsoft-microsoft-sat-80-7ab2b702) | Microsoft | Operational |  |
| [Microsoft SAT 81](https://dchub.cloud/facilities/microsoft-microsoft-sat-81-7241efb4) | Microsoft | Operational |  |
| [Microsoft SAT 82](https://dchub.cloud/facilities/microsoft-microsoft-sat-82-66188529) | Microsoft | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Texas](https://dchub.cloud/facilities/in/us/texas).

## More on San Antonio

- [San Antonio DCPI score](https://dchub.cloud/dcpi/san-antonio)
- [San Antonio market brief](https://dchub.cloud/markets/san-antonio/brief)
- [Texas data center market brief](https://dchub.cloud/states/texas/brief)
- [Texas data center tax incentives](https://dchub.cloud/states/texas/data-center-incentives)

### Email me when the San Antonio DCPI verdict changes

Email me when San Antonio's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

San Antonio: 1,747 MW tracked, any status — live, cited, and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=san-antonio) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=san-antonio)

JSON: [/api/v1/markets/san-antonio/deep-dive](https://dchub.cloud/api/v1/markets/san-antonio/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"San Antonio","item":"https://dchub.cloud/markets/san-antonio"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"San Antonio Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:23:29.097238+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/san-antonio",
 "wordCount":256,
 "about":{"@type":"Place","name":"San Antonio"},
 "description":"Live data-center market analysis. DCPI score 42.3/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "san-antonio", "name": "San Antonio Data Center Market — DC Hub", "description": "Live data-center market measurements for San Antonio, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/san-antonio", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "San Antonio"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 1747.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 42.3, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:45:16."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "CAUTION", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:45:16.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:45:16."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/san-antonio#webpage", "url": "https://dchub.cloud/markets/san-antonio", "name": "San Antonio data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the San Antonio data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the San Antonio market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the San Antonio data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the San Antonio market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```