# Salt Lake City data center market

Power availability in Salt Lake City: DCPI verdict CAUTION, composite score 45.8 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 297 words · generated 2026-11-10 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Salt Lake City data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Salt Lake City market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**45.8/100**

MW, all listings**454**sum of the sites that report MW; most do notany status, unverified listings included

Verdict**CAUTION**

## Salt Lake City at a glance

Salt Lake City has 270 MW operational, 136 MW under construction and 48 MW planned among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are Novva Data Centers (210 MW), Tract (108 MW) and Compass Datacenters (100 MW).

Capacity by status, as of 2026-11-12

| Status | MW |
| --- | --- |
| Operational | 270 |
| Under construction | 136 |
| Planned | 48 |
| Total listed | 454 |

## Developers building or planning in Salt Lake City

| Operator | Under construction MW | Planned MW |
| --- | --- | --- |
| Compass Datacenters | 100 |  |
| Tract | 36 | 48 |

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

## Colocation lease rates in Salt Lake City

Broker lease rates (CBRE/JLL): available on paid plans. Asking base rent per kW of critical IT capacity. Electricity is normally billed separately (metered pass-through), plus cross-connects and one-time fees. Signed deals, term and size change the number. Source: DC Hub estimate. Anchored on JLL North America Data Center Report Midyear 2025 (1-5 MW, H1 2025): Salt Lake City (figure on paid plans); CBRE H1 2026 secondary-market ranges (figure on paid plans)

The market has seen no recent deal activity registered in the tracking window, leaving current operator positioning and capacity expansion plans opaque.

The DCPI verdict of caution reflects a market at an inflection point on power supply. The combination suggests that while additional capacity is technically feasible, operators should expect to navigate both supply tightness and infrastructure coordination challenges.

No recent deals have been tracked in Salt Lake City's registry, leaving operator consolidation activity, M&A signals, and announced expansion intentions unclear. Without visible deal flow, it is difficult to assess whether capacity growth will emerge from existing operator investment in current sites or from new entrant activity. The absence of transaction records stands in contrast to broader Utah activity, where geothermal partnerships and municipal policy shifts are reshaping the regional data center landscape. Flexential's dominant footprint and DataBank's presence establish baseline operator continuity, but the lack of recent announcement flow means capacity plans and power procurement strategies for these facilities remain unannounced.

How Salt Lake City's power supply evolves will depend on utility-level infrastructure investment and operator decisions to expand or relocate load within the region.

## Data centers in Salt Lake City

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [Novva West Jordan Campus Phase 1](https://dchub.cloud/facilities/novva-data-centers-novva-west-jordan-campus-phase-1-b2c050c3) | Novva Data Centers | Operational | 175 |
| [Compass Salt Lake City Campus](https://dchub.cloud/facilities/compass-datacenters-compass-salt-lake-city-campus-3127b981) | Compass Datacenters | Under Construction | 100 |
| [Tract SLC-3](https://dchub.cloud/facilities/tract-tract-slc-3-2ddc6379) | Tract | Planned | 48 |
| [Aligned Salt Lake City](https://dchub.cloud/facilities/aligned-aligned-salt-lake-city-4af03f7a) | Aligned | Operational | 36 |
| [Tract SLC-2](https://dchub.cloud/facilities/tract-tract-slc-2-0f4d0971) | Tract | Under Construction | 36 |
| [Novva Salt Lake City](https://dchub.cloud/facilities/novva-data-centers-novva-salt-lake-city-eac46cdb) | Novva Data Centers | Operational | 35 |
| [Tract SLC-1](https://dchub.cloud/facilities/tract-tract-slc-1-6f58d2f5) | Tract | Operational | 24 |
| [Aligned Salt Lake (SLC-01)](https://dchub.cloud/facilities/aligned-data-centers-aligned-salt-lake-slc-01-4320c937) | Aligned Data Centers | Operational |  |
| [EdgeConneX Salt Lake City (EDCSLC01)](https://dchub.cloud/facilities/edgeconnex-inc-edgeconnex-salt-lake-city-edcslc01-bf993f0b) | EdgeConneX Inc. | Operational |  |
| [Flexential - Salt Lake City/Fairpark (SLC07)](https://dchub.cloud/facilities/flexential-corp-flexential-salt-lake-cityfairpark-slc07-65abf08b) | Flexential Corp. | Operational |  |
| [Flexential - Salt Lake City/South Valley (SLC09)](https://dchub.cloud/facilities/flexential-corp-flexential-salt-lake-citysouth-valley-slc09-076bc054) | Flexential Corp. | Operational |  |
| [Flexential Salt Lake City - Downtown](https://dchub.cloud/facilities/flexential-flexential-salt-lake-city-downtown-ec36dab0) | Flexential | Operational |  |
| [Flexential Salt Lake City - Fair Park](https://dchub.cloud/facilities/flexential-flexential-salt-lake-city-fair-park-ecdce4ce) | Flexential | Operational |  |
| [Flexential Salt Lake City - Millcreek](https://dchub.cloud/facilities/flexential-flexential-salt-lake-city-millcreek-d4c30a79) | Flexential | Operational |  |
| [Flexential Salt Lake City - South Valley](https://dchub.cloud/facilities/flexential-flexential-salt-lake-city-south-valley-12ac812b) | Flexential | Operational |  |
| [Level(3) Salt Lake City](https://dchub.cloud/facilities/lumen-technologies-level3-salt-lake-city-80842786) | Lumen Technologies | Operational |  |
| [Salt Lake City, UT](https://dchub.cloud/facilities/flexential-salt-lake-city-ut-03e4fb8c) | Flexential | Operational |  |
| [Senawave](https://dchub.cloud/facilities/senawave-senawave-089e0755) |  | Operational |  |
| [XMission - Salt Lake City - Utah](https://dchub.cloud/facilities/xmission-xmission-salt-lake-city-utah-2c31661a) | XMission | Operational |  |
| [XO Salt Lake City IP PoP](https://dchub.cloud/facilities/verizon-communications-inc-xo-salt-lake-city-ip-pop-80b71aec) | Verizon Communications, Inc. | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Utah](https://dchub.cloud/facilities/in/us/utah).

## More on Salt Lake City

- [Salt Lake City DCPI score](https://dchub.cloud/dcpi/salt-lake-city)
- [Salt Lake City market brief](https://dchub.cloud/markets/salt-lake-city/brief)
- [Utah data center market brief](https://dchub.cloud/states/utah/brief)
- [Utah data center tax incentives](https://dchub.cloud/states/utah/data-center-incentives)

### Email me when the Salt Lake City DCPI verdict changes

Email me when Salt Lake City's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Salt Lake City: 454 MW tracked, any status — live, cited, and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=salt-lake-city) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=salt-lake-city)

JSON: [/api/v1/markets/salt-lake-city/deep-dive](https://dchub.cloud/api/v1/markets/salt-lake-city/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-10, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Salt Lake City","item":"https://dchub.cloud/markets/salt-lake-city"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Salt Lake City Data Center Market Deep-Dive",
 "datePublished":"2026-11-10T09:00:55.933830+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/salt-lake-city",
 "wordCount":297,
 "about":{"@type":"Place","name":"Salt Lake City"},
 "description":"Live data-center market analysis. DCPI score 45.8/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "salt-lake-city", "name": "Salt Lake City Data Center Market — DC Hub", "description": "Live data-center market measurements for Salt Lake City, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/salt-lake-city", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Salt Lake City"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 454.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 45.8, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:45:47."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "CAUTION", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:45:47.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:45:47."}], "dateModified": "2026-11-10", "temporalCoverage": "2026-11-10"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/salt-lake-city#webpage", "url": "https://dchub.cloud/markets/salt-lake-city", "name": "Salt Lake City data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Salt Lake City data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Salt Lake City market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Salt Lake City data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Salt Lake City market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```