---
description: Is Salem a good data center market for power? DCPI verdict AVOID, score 33.1/100 (WECC), as of 2026-11-12. Grid, queue and deal context for 300+ markets.
title: "Salem data centers: power, grid and capacity | DC Hub"
---

# Salem data center market

Power availability in Salem: DCPI verdict AVOID, composite score 33.1 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 242 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Salem data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Salem market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**33.1/100**

MW, all listings**0**any status, unverified listings included

Verdict**AVOID**

## Colocation lease rates in Salem

DC Hub does not hold a lease-rate figure for this market yet.

The market remains atomized, with no operator holding dominant footprint and no recent transaction activity on record.

Together, these metrics indicate that securing dedicated power capacity for new facilities or expansions will encounter significant obstacles. This is not a market with dormant power reserves or rapid utility buildout underway.

Deal flow in Salem shows no recent tracked transactions, and operator concentration remains extremely low. Regional zoning disputes over data center development, documented in Salem Business Journal coverage, reflect local resistance that may compound infrastructure headwinds.

Operators considering Salem will need to reconcile thin power availability with a regulatory environment that has signaled caution toward new data center development; adjacent market dynamics suggest these frictions are not unique to Salem, but their combination here argues for detailed site-level power and permitting assessment before commitment.

## Data centers in Salem

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [Oregon State Data Center](https://dchub.cloud/facilities/state-of-oregon-oregon-state-data-center-52182d57) | State of Oregon | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Oregon](https://dchub.cloud/facilities/in/us/oregon).

## More on Salem

- [Salem DCPI score](https://dchub.cloud/dcpi/salem)
- [Salem market brief](https://dchub.cloud/markets/salem/brief)
- [Oregon data center market brief](https://dchub.cloud/states/oregon/brief)
- [Oregon data center tax incentives](https://dchub.cloud/states/oregon/data-center-incentives)

### Email me when the Salem DCPI verdict changes

Email me when Salem's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Salem market data is live in DC Hub — cited and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=salem) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=salem)

JSON: [/api/v1/markets/salem/deep-dive](https://dchub.cloud/api/v1/markets/salem/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Salem","item":"https://dchub.cloud/markets/salem"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Salem Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:54:45.718623+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/salem",
 "wordCount":242,
 "about":{"@type":"Place","name":"Salem"},
 "description":"Live data-center market analysis. DCPI score 33.1/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "salem", "name": "Salem Data Center Market — DC Hub", "description": "Live data-center market measurements for Salem, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/salem", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Salem"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 0.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 33.1, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:47:35."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "AVOID", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:47:35.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:47:35."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/salem#webpage", "url": "https://dchub.cloud/markets/salem", "name": "Salem data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Salem data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Salem market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Salem data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Salem market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```
