Power availability in Sacramento: DCPI verdict BUILD, composite score 66.4 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 276 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Sacramento data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Sacramento market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**66.4/100**

MW, all listings**336**sum of the sites that report MW; most do notany status, unverified listings included

Verdict**BUILD**

## Sacramento at a glance

Sacramento has 71 MW operational and 100 MW under construction among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are Compass Datacenters (100 MW), Prime Data Centers (60 MW) and NTT (11 MW).

Capacity by status, as of 2026-11-12

| Status | MW |
| --- | --- |
| Operational | 71 |
| Under construction | 100 |
| Total listed | 171 |

## Developers building or planning in Sacramento

| Operator | Under construction MW | Planned MW |
| --- | --- | --- |
| Compass Datacenters | 100 |  |

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

## Colocation lease rates in Sacramento

Broker lease rates (CBRE/JLL): available on paid plans. Asking base rent per kW of critical IT capacity. Electricity is normally billed separately (metered pass-through), plus cross-connects and one-time fees. Signed deals, term and size change the number. Source: DC Hub estimate. Below Silicon Valley (CBRE North America Data Center Trends H1 2026 (250+ kW): (figure on paid plans)), above CBRE secondary markets (figure on paid plans) given CA industrial power ~20.6 c/kWh (EIA via DC Hub).

NTT, Prime, and RagingWire Data Centers each operate three to four sites, while Frontier Sacramento and QTS Realty maintain dual presences. The market has not recorded recent deal activity in tracked datasets.

This configuration signals that new power procurement pathways remain available and grid access barriers remain moderate. The BUILD verdict applies specifically to scenarios where new power supply can be secured; it is not a broader market endorsement.

Operator concentration remains moderate, with no single player controlling more than four sites. The absence of recent deal announcements does not indicate demand weakness—it reflects a pause in transaction recording rather than activity cessation. Local media coverage signals active municipal engagement on future projects, including transparency commitments from Sacramento leaders and reports of prospective "large load" facilities under consideration. These signals suggest planning and feasibility discussions are active, even where formal deal announcements have not yet surfaced.

## Data centers in Sacramento

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [Compass Elk Grove Campus (Sacramento)](https://dchub.cloud/facilities/compass-datacenters-compass-elk-grove-campus-sacramento-bb3f0856) | Compass Datacenters | Under Construction | 100 |
| [Prime Sacramento](https://dchub.cloud/facilities/prime-data-centers-prime-sacramento-09ec654f) | Prime Data Centers | Operational | 60 |
| [RagingWire CA3](https://dchub.cloud/facilities/ntt-ragingwire-ca3-fece0c63) | NTT | Operational | 11 |
| [NTT GLOBAL DATA CENTERS](https://dchub.cloud/facilities/ntt-global-data-centers-171cae3d) |  |  |  |
| [QTS Sacramento (SAC1)](https://dchub.cloud/facilities/qts-qts-sacramento-sac1-90acc89d) | QTS | Operational |  |
| [QTS Sacramento CA DC](https://dchub.cloud/facilities/qts-realty-qts-sacramento-ca-dc-7f99560a) | QTS Realty | Operational |  |
| [RagingWire CA1](https://dchub.cloud/facilities/ntt-ragingwire-ca1-771a1b94) | NTT | Operational |  |
| [RagingWire CA1 - NTT](https://dchub.cloud/facilities/ragingwire-data-centers-ragingwire-ca1-ntt-d13f6806) | RagingWire Data Centers | Operational |  |
| [RagingWire CA2](https://dchub.cloud/facilities/ntt-ragingwire-ca2-c360300a) | NTT | Operational |  |
| [RagingWire CA2 - NTT](https://dchub.cloud/facilities/ragingwire-data-centers-ragingwire-ca2-ntt-66e8e360) | RagingWire Data Centers | Operational |  |
| [RagingWire CA3 - NTT](https://dchub.cloud/facilities/ragingwire-data-centers-ragingwire-ca3-ntt-f41ec9d6) | RagingWire Data Centers | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [California](https://dchub.cloud/facilities/in/us/california).

## More on Sacramento

- [Sacramento DCPI score](https://dchub.cloud/dcpi/sacramento)
- [Sacramento market brief](https://dchub.cloud/markets/sacramento/brief)
- [California data center market brief](https://dchub.cloud/states/california/brief)
- [California data center tax incentives](https://dchub.cloud/states/california/data-center-incentives)

### Email me when the Sacramento DCPI verdict changes

Email me when Sacramento's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Sacramento: 336 MW tracked, any status — live, cited, and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=sacramento) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=sacramento)

JSON: [/api/v1/markets/sacramento/deep-dive](https://dchub.cloud/api/v1/markets/sacramento/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Sacramento","item":"https://dchub.cloud/markets/sacramento"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Sacramento Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:23:13.978156+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/sacramento",
 "wordCount":276,
 "about":{"@type":"Place","name":"Sacramento"},
 "description":"Live data-center market analysis. DCPI score 66.4/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "sacramento", "name": "Sacramento Data Center Market — DC Hub", "description": "Live data-center market measurements for Sacramento, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/sacramento", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Sacramento"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 336.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 66.4, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:46:09."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "BUILD", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:46:09.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:46:09."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/sacramento#webpage", "url": "https://dchub.cloud/markets/sacramento", "name": "Sacramento data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Sacramento data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Sacramento market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Sacramento data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Sacramento market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```