---
description: Is Rotterdam a good data center market for power? DCPI verdict AVOID, score 14.2/100 (ENTSOE-NL), as of 2026-11-12. Grid, queue and deal context for 300+ markets.
title: "Rotterdam data centers: power, grid and capacity | DC Hub"
---

# Rotterdam data center market

Power availability in Rotterdam: DCPI verdict AVOID, composite score 14.2 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 295 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Rotterdam data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Rotterdam market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**14.2/100**

MW, all listings**0**any status, unverified listings included

Verdict**AVOID**

## Colocation lease rates in Rotterdam

DC Hub does not hold a lease-rate figure for this market yet.

(2 sites), and Alticom Den (1 site), with no recent tracked deals in the market.

The DCPI verdict of AVOID reflects acute power procurement headwinds.

Deal flow into Rotterdam remains quiet; no transactions are currently tracked. Operator concentration is moderate, with NorthC holding the largest footprint at three sites. Recent news indicates that Nebius has signed a letter of intent to lease capacity from an "AI Gigafactory" in the Port of Rotterdam, suggesting that available space in existing facilities may be absorbed faster than new power for expansion can be secured.

The structural challenge ahead is supply-side, not demand-side. Operators and site developers assessing Rotterdam should prioritize early engagement with local grid authorities to map realistic power timelines before committing capital.

## Data centers in Rotterdam

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [Eurofiber Datacenter Rotterdam 2](https://dchub.cloud/facilities/bytesnet-bv-bytesnet-rotterdam-be4e73c8) | Bytesnet B.V. | Operational |  |
| [Intermax Schouwburgplein Rotterdam](https://dchub.cloud/facilities/intermax-cloudsourcing-bv-intermax-schouwburgplein-rotterdam-aedb5631) | Intermax Cloudsourcing B.V. | Operational |  |
| [Luna.nl Rotterdam Puntegale](https://dchub.cloud/facilities/lunanl-bv-lunanl-rotterdam-puntegale-95f4ec21) | Luna.nl B.V. | Operational |  |
| [NorthC Rotterdam Zestienhoven 1&2](https://dchub.cloud/facilities/northc-northc-rotterdam-zestienhoven-12-c0a9825d) | NorthC | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Netherlands](https://dchub.cloud/facilities/in/nl).

## More on Rotterdam

- [Rotterdam DCPI score](https://dchub.cloud/dcpi/rotterdam)
- [Rotterdam market brief](https://dchub.cloud/markets/rotterdam/brief)

### Email me when the Rotterdam DCPI verdict changes

Email me when Rotterdam's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Rotterdam market data is live in DC Hub — cited and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=rotterdam) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=rotterdam)

JSON: [/api/v1/markets/rotterdam/deep-dive](https://dchub.cloud/api/v1/markets/rotterdam/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Rotterdam","item":"https://dchub.cloud/markets/rotterdam"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Rotterdam Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:23:06.613978+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/rotterdam",
 "wordCount":295,
 "about":{"@type":"Place","name":"Rotterdam"},
 "description":"Live data-center market analysis. DCPI score 14.2/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "rotterdam", "name": "Rotterdam Data Center Market — DC Hub", "description": "Live data-center market measurements for Rotterdam, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/rotterdam", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Rotterdam"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 0.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 14.2, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:48:48."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "AVOID", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:48:48.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:48:48."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/rotterdam#webpage", "url": "https://dchub.cloud/markets/rotterdam", "name": "Rotterdam data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Rotterdam data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Rotterdam market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Rotterdam data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Rotterdam market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```
