---
description: Is Rome a good data center market for power? DCPI verdict AVOID, score 11.4/100 (ENTSOE-IT), as of 2026-11-12. 120 MW tracked across all listings, unverified included (as of 2026-11-07). Grid, queue and deal context for 300+ markets.
title: "Rome data centers: power, grid and capacity | DC Hub"
---

# Rome data center market

Power availability in Rome: DCPI verdict AVOID, composite score 11.4 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 245 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Rome data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Rome market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**11.4/100**

MW, all listings**120**sum of the sites that report MW; most do notany status, unverified listings included

Verdict**AVOID**

## Colocation lease rates in Rome

DC Hub does not hold a lease-rate figure for this market yet.

The market has recorded no recent deal activity in the tracked dataset.

Combined, these scores indicate that prospective siting or expansion here faces structural power-supply barriers rather than capacity abundance.

Rome's operator landscape reflects established incumbent positioning. The presence of hyperscaler presence through Microsoft and tier-1 colocation providers through Digital Realty suggests the market has attracted core enterprise demand, yet the absence of recent transaction flow indicates deal velocity has stalled. No investment announcements have been tracked for Rome in the current window.

## Data centers in Rome

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [Aruba IT4 - Rome](https://dchub.cloud/facilities/aruba-spa-aruba-it4-rome-08e0314d) | Aruba S.p.A | Operational |  |
| [Aruba s.p.a.](https://dchub.cloud/facilities/aruba-spa-aruba-spa-9f0f6188) |  | Operational |  |
| [DC Noovle ROMA](https://dchub.cloud/facilities/noovle-spa-dc-noovle-roma-fb8976f4) | Noovle S.p.A. | Operational |  |
| [Data center Roma Capitale](https://dchub.cloud/facilities/roma-capitale-data-center-roma-capitale-67e678ff) | Roma Capitale | Operational |  |
| [Namex Datacenter Rome](https://dchub.cloud/facilities/namex-namex-datacenter-rome-f95f980e) | Namex | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Italy](https://dchub.cloud/facilities/in/it).

## More on Rome

- [Rome DCPI score](https://dchub.cloud/dcpi/rome)
- [Rome market brief](https://dchub.cloud/markets/rome/brief)

### Email me when the Rome DCPI verdict changes

Email me when Rome's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Rome: 120 MW tracked, any status — live, cited, and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=rome) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=rome)

JSON: [/api/v1/markets/rome/deep-dive](https://dchub.cloud/api/v1/markets/rome/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Rome","item":"https://dchub.cloud/markets/rome"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Rome Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:22:59.348723+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/rome",
 "wordCount":245,
 "about":{"@type":"Place","name":"Rome"},
 "description":"Live data-center market analysis. DCPI score 11.4/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "rome", "name": "Rome Data Center Market — DC Hub", "description": "Live data-center market measurements for Rome, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/rome", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Rome"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 120.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 11.4, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:48:45."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "AVOID", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:48:45.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:48:45."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/rome#webpage", "url": "https://dchub.cloud/markets/rome", "name": "Rome data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Rome data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Rome market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Rome data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Rome market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```
