---
description: Is Rochester a good data center market for power? DCPI verdict CAUTION, score 48.1/100 (NYISO), as of 2026-11-12. Grid, queue and deal context for 300+ markets.
title: "Rochester data centers: power, grid and capacity | DC Hub"
---

# Rochester data center market

Power availability in Rochester: DCPI verdict CAUTION, composite score 48.1 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 289 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Rochester data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Rochester market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**48.1/100**

MW, all listings**0**any status, unverified listings included

Verdict**CAUTION**

## Colocation lease rates in Rochester

DC Hub does not hold a lease-rate figure for this market yet.

This combination—sufficient power today but tightening pressure ahead—yields a CAUTION verdict from the DCPI framework.

The CAUTION verdict on new power reflects the interplay of these two scores.

Frontier Rochester's four-site dominance and Centurylink Rochester's two-site presence establish two regional anchors; the remaining eight facilities spread across four smaller operators suggest a competitive, non-monopolistic supply landscape. No recent capex deals or power procurement announcements are tracked, consistent with CAUTION-level markets where new projects are assessed cautiously rather than rushed.

## Data centers in Rochester

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [CentriLogic Rochester (ROC)](https://dchub.cloud/facilities/centrilogic-centrilogic-rochester-roc-7a98d2c7) | CentriLogic | Operational |  |
| [Epic / Mayo Data Center](https://dchub.cloud/facilities/epic-mayo-data-center-9df73284) |  | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Minnesota](https://dchub.cloud/facilities/in/us/minnesota).

## More on Rochester

- [Rochester DCPI score](https://dchub.cloud/dcpi/rochester)
- [Rochester market brief](https://dchub.cloud/markets/rochester/brief)
- [New York data center market brief](https://dchub.cloud/states/new-york/brief)
- [New York data center tax incentives](https://dchub.cloud/states/new-york/data-center-incentives)

### Email me when the Rochester DCPI verdict changes

Email me when Rochester's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Rochester market data is live in DC Hub — cited and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=rochester) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=rochester)

JSON: [/api/v1/markets/rochester/deep-dive](https://dchub.cloud/api/v1/markets/rochester/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Rochester","item":"https://dchub.cloud/markets/rochester"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Rochester Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:22:52.263304+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/rochester",
 "wordCount":289,
 "about":{"@type":"Place","name":"Rochester"},
 "description":"Live data-center market analysis. DCPI score 48.1/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "rochester", "name": "Rochester Data Center Market — DC Hub", "description": "Live data-center market measurements for Rochester, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/rochester", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Rochester"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 0.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 48.1, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:45:51."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "CAUTION", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:45:51.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:45:51."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/rochester#webpage", "url": "https://dchub.cloud/markets/rochester", "name": "Rochester data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Rochester data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Rochester market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Rochester data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Rochester market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```
