# Richmond data center market

Power availability in Richmond: DCPI verdict AVOID, composite score 21.4 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 189 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Richmond data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Richmond market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**21.4/100**

MW, all listings**710**sum of the sites that report MW; most do notany status, unverified listings included

Verdict**AVOID**

## Colocation lease rates in Richmond

DC Hub does not hold a lease-rate figure for this market yet.

Flexential operates the largest presence with four facilities, followed by QTS (Blackstone) and EdgeConneX each with two locations.

Together, these metrics reflect a market where new power infrastructure—whether through utility upgrades, on-site generation, or power purchase agreements—requires longer lead times and carries execution risk for projects requiring rapid deployment.

Operator diversity remains low: five distinct entities control the market's tracked capacity, with Flexential's four-site footprint representing meaningful concentration. The regional context matters: Chesterfield County has signaled a moratorium on new data center approvals, while state-level debate around data center expansion persists.

## Data centers in Richmond

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [BANK OF AMERICA - VILLA PARK DATA CENTER](https://dchub.cloud/facilities/bank-of-america-villa-park-data-center-baf88a9e) |  |  |  |
| [EdgeConneX Richmond (EDCRIC01)](https://dchub.cloud/facilities/edgeconnex-inc-edgeconnex-richmond-edcric01-c4d2e492) | EdgeConneX Inc. | Operational |  |
| [EdgeConneX Richmond VA](https://dchub.cloud/facilities/edgeconnex-edgeconnex-richmond-va-cfb404dc) | EdgeConneX | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Virginia](https://dchub.cloud/facilities/in/us/virginia).

## More on Richmond

- [Richmond DCPI score](https://dchub.cloud/dcpi/richmond)
- [Richmond market brief](https://dchub.cloud/markets/richmond/brief)
- [Virginia data center market brief](https://dchub.cloud/states/virginia/brief)
- [Virginia data center tax incentives](https://dchub.cloud/states/virginia/data-center-incentives)

### Email me when the Richmond DCPI verdict changes

Email me when Richmond's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Richmond: 710 MW tracked, any status — live, cited, and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=richmond) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=richmond)

JSON: [/api/v1/markets/richmond/deep-dive](https://dchub.cloud/api/v1/markets/richmond/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Richmond","item":"https://dchub.cloud/markets/richmond"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Richmond Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:22:38.110509+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/richmond",
 "wordCount":189,
 "about":{"@type":"Place","name":"Richmond"},
 "description":"Live data-center market analysis. DCPI score 21.4/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "richmond", "name": "Richmond Data Center Market — DC Hub", "description": "Live data-center market measurements for Richmond, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/richmond", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Richmond"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 710.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 21.4, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:46:45."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "AVOID", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:46:45.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:46:45."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/richmond#webpage", "url": "https://dchub.cloud/markets/richmond", "name": "Richmond data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Richmond data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Richmond market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Richmond data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Richmond market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```