---
description: Is Richland Parish a good data center market for power? DCPI verdict AVOID, score 32.6/100 (MISO), as of 2026-11-12. 19,500 MW tracked across all listings, unverified included (as of 2026-11-07). Grid, queue and deal context for 300+ markets.
title: "Richland Parish data centers: power, grid and capacity | DC Hub"
---

# Richland Parish data center market

Power availability in Richland Parish: DCPI verdict AVOID, composite score 32.6 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 256 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Richland Parish data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Richland Parish market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**32.6/100**

MW, all listings**19,500**every tracked site reports MWany status, unverified listings included

Verdict**AVOID**

This analysis was written on 2026-11-07, when the Data Center Power Index for this market read 32.5. The index is recomputed through the day and reads 32.6 now — the figure above is the live one, and the narrative below describes the market as it stood when it was written.

## Richland Parish at a glance

Richland Parish has 1,110 MW under construction and 3,890 MW planned among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are Meta (5,000 MW).

Capacity by status, as of 2026-11-12

| Status | MW |
| --- | --- |
| Under construction | 1,110 |
| Planned | 3,890 |
| Total listed | 5,000 |

## Developers building or planning in Richland Parish

| Operator | Under construction MW | Planned MW |
| --- | --- | --- |
| Meta | 1,110 | 3,890 |

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

## Colocation lease rates in Richland Parish

DC Hub does not hold a lease-rate figure for this market yet.

Meta accounts for 22 of the tracked sites—13 under the Meta operator name and 9 under Meta Platforms—establishing near-total control of deployed capacity in the parish. The market's power infrastructure reflects this concentration: all tracked capacity exists within a single operator ecosystem, with no recent deals recorded and no competing platforms establishing presence.

This combination—adequate base supply paired with delivery bottlenecks—creates a challenging environment for new facility siting.

Deal flow in Richland Parish has stalled. The absence of competing operators or acquisition activity reflects the structural challenge: available power does not translate readily into usable capacity for new builds or operator diversification.

## Data centers in Richland Parish

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [Meta Hyperion Building 9](https://dchub.cloud/facilities/meta-meta-hyperion-building-9-51a498d3) | Meta | Planned | 560 |
| [Meta Hyperion Building 1](https://dchub.cloud/facilities/meta-meta-hyperion-building-1-db41643d) | Meta | Under Construction | 555 |
| [Meta Hyperion Building 2](https://dchub.cloud/facilities/meta-meta-hyperion-building-2-b8b8ed62) | Meta | Under Construction | 555 |
| [Meta Hyperion Building 3](https://dchub.cloud/facilities/meta-meta-hyperion-building-3-69b868d2) | Meta | Planned | 555 |
| [Meta Hyperion Building 4](https://dchub.cloud/facilities/meta-meta-hyperion-building-4-3981ad40) | Meta | Planned | 555 |
| [Meta Hyperion Building 5](https://dchub.cloud/facilities/meta-meta-hyperion-building-5-559ff6ab) | Meta | Planned | 555 |
| [Meta Hyperion Building 6](https://dchub.cloud/facilities/meta-meta-hyperion-building-6-a9c56e82) | Meta | Planned | 555 |
| [Meta Hyperion Building 7](https://dchub.cloud/facilities/meta-meta-hyperion-building-7-11438413) | Meta | Planned | 555 |
| [Meta Hyperion Building 8](https://dchub.cloud/facilities/meta-meta-hyperion-building-8-666cfaf0) | Meta | Planned | 555 |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Louisiana](https://dchub.cloud/facilities/in/us/louisiana).

## More on Richland Parish

- [Richland Parish DCPI score](https://dchub.cloud/dcpi/richland-parish)
- [Richland Parish market brief](https://dchub.cloud/markets/richland-parish/brief)
- [Louisiana data center market brief](https://dchub.cloud/states/louisiana/brief)
- [Louisiana data center tax incentives](https://dchub.cloud/states/louisiana/data-center-incentives)

### Email me when the Richland Parish DCPI verdict changes

Email me when Richland Parish's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Richland Parish: 19,500 MW tracked, any status — live, cited, and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=richland-parish) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=richland-parish)

JSON: [/api/v1/markets/richland-parish/deep-dive](https://dchub.cloud/api/v1/markets/richland-parish/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Richland Parish","item":"https://dchub.cloud/markets/richland-parish"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Richland Parish Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:22:31.506220+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/richland-parish",
 "wordCount":256,
 "about":{"@type":"Place","name":"Richland Parish"},
 "description":"Live data-center market analysis. DCPI score 32.6/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "richland-parish", "name": "Richland Parish Data Center Market — DC Hub", "description": "Live data-center market measurements for Richland Parish, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/richland-parish", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Richland Parish"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 19500.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 32.6, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:46:30."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "AVOID", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:46:30.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:46:30."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/richland-parish#webpage", "url": "https://dchub.cloud/markets/richland-parish", "name": "Richland Parish data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Richland Parish data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Richland Parish market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Richland Parish data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Richland Parish market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```
