---
description: Is Richardson a good data center market for power? DCPI verdict CAUTION, score 43.9/100 (ERCOT), as of 2026-11-12. 125 MW tracked across all listings, unverified included (as of 2026-11-07). Grid, queue and deal context for 300+ markets.
title: "Richardson data centers: power, grid and capacity | DC Hub"
---

# Richardson data center market

Power availability in Richardson: DCPI verdict CAUTION, composite score 43.9 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 260 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Richardson data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Richardson market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**43.9/100**

MW, all listings**125**sum of the sites that report MW; most do notany status, unverified listings included

Verdict**CAUTION**

## Richardson at a glance

Richardson has 125 MW operational among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are Digital Realty (70 MW), Stream (50 MW) and Rackspace (5 MW).

Capacity by status, as of 2026-11-12

| Status | MW |
| --- | --- |
| Operational | 125 |
| Total listed | 125 |

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

## Colocation lease rates in Richardson

DC Hub does not hold a lease-rate figure for this market yet.

Rackspace, Flexential, Flexential Corp., and Stream operate smaller multi-site or single-site footprints in the market. The operator base remains concentrated; no recent deal activity has been recorded in Richardson's tracked data.

Together, these readings mean that new power procurement in Richardson will require explicit attention to grid interconnection timelines, utility capacity coordination, and potential upgrade costs; this is not a market where power procurement can be assumed routine or fast-tracked.

Peer markets in the Dallas–Fort Worth region show sparse recent M&A closure activity, with notable regional development proceeding at larger scale—Flexential announced a 108 MW campus acquisition outside Dallas, and Digital Realty disclosed a planned 600 MW campus deployment in Kansas. Within Richardson proper, no recent deals appear in tracked records, and operator consolidation has not reshaped the market's composition recently.

## Data centers in Richardson

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [Stream Data Centers Dallas](https://dchub.cloud/facilities/stream-stream-data-centers-dallas-4928982c) | Stream | Operational | 50 |
| [Digital Realty Dallas DFW16](https://dchub.cloud/facilities/digital-realty-digital-realty-dallas-dfw16-f73d7080) | Digital Realty | Operational | 14 |
| [Digital Realty Dallas DFW17](https://dchub.cloud/facilities/digital-realty-digital-realty-dallas-dfw17-9d2828f3) | Digital Realty | Operational | 14 |
| [Digital Realty Dallas DFW28](https://dchub.cloud/facilities/digital-realty-digital-realty-dallas-dfw28-b37b2bf8) | Digital Realty | Operational | 14 |
| [Digital Realty Dallas DFW29](https://dchub.cloud/facilities/digital-realty-digital-realty-dallas-dfw29-56b5ce46) | Digital Realty | Operational | 14 |
| [Digital Realty Dallas DFW35](https://dchub.cloud/facilities/digital-realty-digital-realty-dallas-dfw35-dd2fc685) | Digital Realty | Operational | 14 |
| [Rackspace Richardson DFW3](https://dchub.cloud/facilities/rackspace-rackspace-richardson-dfw3-8b51c65b) | Rackspace | Operational | 5 |
| [365 Data Centers Richardson (TX1)](https://dchub.cloud/facilities/365-data-centers-365-data-centers-richardson-tx1-71aa4267) | 365 Data Centers | Operational |  |
| [DataBank Dallas (DFW2)](https://dchub.cloud/facilities/databank-databank-dallas-dfw2-ba46c28b) | DataBank | Operational |  |
| [Digital Realty DFW (1232 Alma)](https://dchub.cloud/facilities/digital-realty-digital-realty-dfw-1232-alma-ae272824) | Digital Realty | Operational |  |
| [Digital Realty DFW18 (1210 Integrity Dr)](https://dchub.cloud/facilities/digital-realty-digital-realty-dfw18-1210-integrity-dr-41513c84) | Digital Realty | Operational |  |
| [Flexential Dallas - Richardson](https://dchub.cloud/facilities/flexential-flexential-dallas-richardson-59ee8dc6) | Flexential | Operational |  |
| [Rackspace Dallas Richardson (DFW3)](https://dchub.cloud/facilities/rackspace-rackspace-dallas-richardson-dfw3-f14c0579) | Rackspace | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Texas](https://dchub.cloud/facilities/in/us/texas).

## More on Richardson

- [Richardson DCPI score](https://dchub.cloud/dcpi/richardson)
- [Richardson market brief](https://dchub.cloud/markets/richardson/brief)
- [Texas data center market brief](https://dchub.cloud/states/texas/brief)
- [Texas data center tax incentives](https://dchub.cloud/states/texas/data-center-incentives)

### Email me when the Richardson DCPI verdict changes

Email me when Richardson's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Richardson: 125 MW tracked, any status — live, cited, and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=richardson) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=richardson)

JSON: [/api/v1/markets/richardson/deep-dive](https://dchub.cloud/api/v1/markets/richardson/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Richardson","item":"https://dchub.cloud/markets/richardson"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Richardson Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:22:23.761199+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/richardson",
 "wordCount":260,
 "about":{"@type":"Place","name":"Richardson"},
 "description":"Live data-center market analysis. DCPI score 43.9/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "richardson", "name": "Richardson Data Center Market — DC Hub", "description": "Live data-center market measurements for Richardson, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/richardson", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Richardson"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 125.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 43.9, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:45:55."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "CAUTION", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:45:55.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:45:55."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/richardson#webpage", "url": "https://dchub.cloud/markets/richardson", "name": "Richardson data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Richardson data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Richardson market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Richardson data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Richardson market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```
