# Red Oak data center market

Power availability in Red Oak: DCPI verdict CAUTION, composite score 45 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 239 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Red Oak data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Red Oak market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**45.0/100**

MW, all listings**805**sum of the sites that report MW; most do notany status, unverified listings included

Verdict**CAUTION**

## Red Oak at a glance

Red Oak has 750 MW under construction among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are DataBank (500 MW) and Compass Datacenters (250 MW).

Capacity by status, as of 2026-11-12

| Status | MW |
| --- | --- |
| Under construction | 750 |
| Total listed | 750 |

## Developers building or planning in Red Oak

| Operator | Under construction MW | Planned MW |
| --- | --- | --- |
| DataBank | 500 |  |
| Compass Datacenters | 250 |  |

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

## Colocation lease rates in Red Oak

DC Hub does not hold a lease-rate figure for this market yet.

Red Oak hosts 805 MW across seven tracked facilities, with Compass operating three sites and DataBank, ALAMO MISSION, and Compass Datacenters each operating one. The market remains fragmented, with no recent transactions recorded in the tracking period. The operator landscape shows Compass maintaining the largest footprint, though the concentration remains modest relative to larger Texas metros.

In practical terms, new capacity can technically connect, but the path to energization will require careful navigation of bottlenecks that are not primarily driven by regional generation shortfalls.

Deal activity in Red Oak remains quiet. DataBank's broader acquisition strategy—evidenced by the Eagan transaction—suggests operator-level consolidation is occurring at a regional scale, though Red Oak-specific activity remains dormant. The presence of DataBank as a local operator positions the company to respond if market conditions shift, but current deal flow offers no signal of immediate expansion or repositioning.

## Data centers in Red Oak

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [DataBank Red Oak Mega Campus](https://dchub.cloud/facilities/databank-databank-red-oak-mega-campus-ac4d3aca) | DataBank | Under Construction | 500 |
| [Compass Red Oak Campus (Dallas)](https://dchub.cloud/facilities/compass-datacenters-compass-red-oak-campus-dallas-a7d9ab20) | Compass Datacenters | Under Construction | 250 |
| [Compass Data Center](https://dchub.cloud/facilities/compass-compass-data-center-8baf7e6e) | Compass | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Texas](https://dchub.cloud/facilities/in/us/texas).

## More on Red Oak

- [Red Oak DCPI score](https://dchub.cloud/dcpi/red-oak)
- [Red Oak market brief](https://dchub.cloud/markets/red-oak/brief)
- [Texas data center market brief](https://dchub.cloud/states/texas/brief)
- [Texas data center tax incentives](https://dchub.cloud/states/texas/data-center-incentives)

### Email me when the Red Oak DCPI verdict changes

Email me when Red Oak's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Red Oak: 805 MW tracked, any status — live, cited, and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=red-oak) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=red-oak)

JSON: [/api/v1/markets/red-oak/deep-dive](https://dchub.cloud/api/v1/markets/red-oak/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Red Oak","item":"https://dchub.cloud/markets/red-oak"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Red Oak Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:21:49.892001+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/red-oak",
 "wordCount":239,
 "about":{"@type":"Place","name":"Red Oak"},
 "description":"Live data-center market analysis. DCPI score 45.0/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "red-oak", "name": "Red Oak Data Center Market — DC Hub", "description": "Live data-center market measurements for Red Oak, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/red-oak", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Red Oak"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 805.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 45.0, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:47:02."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "CAUTION", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:47:02.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:47:02."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/red-oak#webpage", "url": "https://dchub.cloud/markets/red-oak", "name": "Red Oak data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Red Oak data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Red Oak market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Red Oak data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Red Oak market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```