---
description: Is Rancho Cordova a good data center market for power? DCPI verdict CAUTION, score 50.4/100 (CAISO), as of 2026-11-12. Grid, queue and deal context for 300+ markets.
title: "Rancho Cordova data centers: power, grid and capacity | DC Hub"
---

# Rancho Cordova data center market

Power availability in Rancho Cordova: DCPI verdict CAUTION, composite score 50.4 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 215 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Rancho Cordova data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Rancho Cordova market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**50.4/100**

MW, all listings**0**any status, unverified listings included

Verdict**CAUTION**

## Colocation lease rates in Rancho Cordova

DC Hub does not hold a lease-rate figure for this market yet.

The market has not reported aggregated capacity figures to DC Hub's tracking system; only one operator has submitted site-level power data. This opacity limits visibility into total installed load and reserve margins across the region.

No recent deals have been tracked in Rancho Cordova. The operator roster shows established players with multi-site presence (EdgeConneX operates two locations), suggesting an installed base rather than an active M&A or greenfield development cycle. Without recent transaction data, deal flow patterns remain unclear. Operator concentration around EdgeConneX and Sungard Availability Services indicates a landscape shaped by regional incumbents rather than new entrants.

## Data centers in Rancho Cordova

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [365 Data Centers Rancho Cordova (CA1)](https://dchub.cloud/facilities/365-data-centers-365-data-centers-rancho-cordova-ca1-6d8a3e8c) | 365 Data Centers | Operational |  |
| [EdgeConneX Sacramento (EDCSAC01)](https://dchub.cloud/facilities/edgeconnex-inc-edgeconnex-sacramento-edcsac01-86c934df) | EdgeConneX Inc. | Operational |  |
| [Edgeconnex Data Center](https://dchub.cloud/facilities/edgeconnex-edgeconnex-data-center-1fbabd37) | EdgeConneX | Operational |  |
| [Sungard AS Sacramento](https://dchub.cloud/facilities/sungard-availability-services-sungard-as-sacramento-8fb08517) | Sungard Availability Services | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [California](https://dchub.cloud/facilities/in/us/california).

## More on Rancho Cordova

- [Rancho Cordova DCPI score](https://dchub.cloud/dcpi/rancho-cordova)
- [Rancho Cordova market brief](https://dchub.cloud/markets/rancho-cordova/brief)
- [California data center market brief](https://dchub.cloud/states/california/brief)
- [California data center tax incentives](https://dchub.cloud/states/california/data-center-incentives)

### Email me when the Rancho Cordova DCPI verdict changes

Email me when Rancho Cordova's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Rancho Cordova market data is live in DC Hub — cited and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=rancho-cordova) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=rancho-cordova)

JSON: [/api/v1/markets/rancho-cordova/deep-dive](https://dchub.cloud/api/v1/markets/rancho-cordova/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Rancho Cordova","item":"https://dchub.cloud/markets/rancho-cordova"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Rancho Cordova Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:21:42.153801+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/rancho-cordova",
 "wordCount":215,
 "about":{"@type":"Place","name":"Rancho Cordova"},
 "description":"Live data-center market analysis. DCPI score 50.4/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "rancho-cordova", "name": "Rancho Cordova Data Center Market — DC Hub", "description": "Live data-center market measurements for Rancho Cordova, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/rancho-cordova", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Rancho Cordova"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 0.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 50.4, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:48:04."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "CAUTION", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:48:04.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:48:04."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/rancho-cordova#webpage", "url": "https://dchub.cloud/markets/rancho-cordova", "name": "Rancho Cordova data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Rancho Cordova data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Rancho Cordova market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Rancho Cordova data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Rancho Cordova market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```
