# Quincy data center market

Power availability in Quincy: DCPI verdict CAUTION, composite score 44.6 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 327 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Quincy data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Quincy market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**44.6/100**

MW, all listings**1,347**sum of the sites that report MW; most do notany status, unverified listings included

Verdict**CAUTION**

## Quincy at a glance

Quincy has 1,187 MW operational among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are Microsoft (800 MW), Sabey (160 MW) and Prime Data Centers (80 MW).

Capacity by status, as of 2026-11-12

| Status | MW |
| --- | --- |
| Operational | 1,187 |
| Total listed | 1,187 |

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

## Colocation lease rates in Quincy

Broker lease rates (CBRE/JLL): available on paid plans. Asking base rent per kW of critical IT capacity. Electricity is normally billed separately (metered pass-through), plus cross-connects and one-time fees. Signed deals, term and size change the number. Source: CBRE North America Data Center Trends H1 2026 (250+ kW): Central Washington (figure on paid plans) [(link)](https://www.cbre.com/insights/books/north-america-data-center-trends-h1-2026)

No recent deals have been tracked in this market.

Operators seeking to expand capacity or newcomers evaluating entry should expect moderately extended lead times and potentially elevated acquisition costs for incremental megawatts. This combination means power is neither abundantly available nor critically scarce; it sits in a middle band where securing new supply requires active engagement with local utilities and grid operators but remains feasible.

Deal silence in Quincy contrasts with broader market activity elsewhere. Vantage's seven-site presence and Microsoft's six-site footprint indicate both scale and ongoing commitment, yet neither operator has announced new capacity additions lately. H5 Data Centers' three sites represent a smaller but established stake.

## Data centers in Quincy

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [Microsoft Azure West US (Washington)](https://dchub.cloud/facilities/microsoft-microsoft-azure-west-us-washington-03ec85f2) | Microsoft | Operational | 400 |
| [Microsoft Quincy Data Center](https://dchub.cloud/facilities/microsoft-microsoft-quincy-data-center-3036ce1b) | Microsoft | Operational | 400 |
| [Sabey Quincy](https://dchub.cloud/facilities/sabey-sabey-quincy-fa920a15) | Sabey | Operational | 100 |
| [Prime Quincy](https://dchub.cloud/facilities/prime-data-centers-prime-quincy-970ace37) | Prime Data Centers | Operational | 80 |
| [Sabey Intergate.Columbia](https://dchub.cloud/facilities/sabey-sabey-intergatecolumbia-8d4363bc) | Sabey | Operational | 60 |
| [Microsoft](https://dchub.cloud/facilities/microsoft-quincy-05eb344c) |  | Operational | 50 |
| [Vantage Quincy](https://dchub.cloud/facilities/vantage-data-centers-vantage-quincy-cd2d9ca3) | Vantage Data Centers | Operational | 50 |
| [H5 Quincy 1](https://dchub.cloud/facilities/h5-data-centers-h5-quincy-1-e00d992a) | H5 Data Centers | Operational | 36 |
| [NTT Data Quincy](https://dchub.cloud/facilities/ntt-ntt-data-quincy-ddda08ee) | NTT | Operational | 11 |
| [Azure West US Washington](https://dchub.cloud/facilities/microsoft-azure-west-us-washington-9a6f0fe5) | Microsoft | Operational |  |
| [CyrusOne Quincy](https://dchub.cloud/facilities/cyrusone-cyrusone-quincy-2f4495d3) | CyrusOne | Operational |  |
| [H5 Data Centers Quincy 2/3](https://dchub.cloud/facilities/h5-data-centers-h5-data-centers-quincy-23-9b44690d) | H5 Data Centers | Operational |  |
| [Microsoft MWH Data Center](https://dchub.cloud/facilities/microsoft-microsoft-mwh-data-center-30652d1e) | Microsoft | Operational |  |
| [Vantage Quincy WA](https://dchub.cloud/facilities/vantage-data-centers-vantage-quincy-wa-532dfad9) | Vantage Data Centers | Operational |  |
| [Yahoo Data Center](https://dchub.cloud/facilities/yahoo-yahoo-data-center-23038eac) | Yahoo | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Washington](https://dchub.cloud/facilities/in/us/washington).

## More on Quincy

- [Quincy DCPI score](https://dchub.cloud/dcpi/quincy)
- [Quincy market brief](https://dchub.cloud/markets/quincy/brief)
- [Washington data center market brief](https://dchub.cloud/states/washington/brief)
- [Washington data center tax incentives](https://dchub.cloud/states/washington/data-center-incentives)

### Email me when the Quincy DCPI verdict changes

Email me when Quincy's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Quincy: 1,347 MW tracked, any status — live, cited, and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=quincy) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=quincy)

JSON: [/api/v1/markets/quincy/deep-dive](https://dchub.cloud/api/v1/markets/quincy/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Quincy","item":"https://dchub.cloud/markets/quincy"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Quincy Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:21:34.145419+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/quincy",
 "wordCount":327,
 "about":{"@type":"Place","name":"Quincy"},
 "description":"Live data-center market analysis. DCPI score 44.6/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "quincy", "name": "Quincy Data Center Market — DC Hub", "description": "Live data-center market measurements for Quincy, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/quincy", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Quincy"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 1347.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 44.6, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:45:15."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "CAUTION", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:45:15.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:45:15."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/quincy#webpage", "url": "https://dchub.cloud/markets/quincy", "name": "Quincy data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Quincy data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Quincy market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Quincy data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Quincy market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```