description: Is Querétaro a good data center market for power? DCPI verdict AVOID, score 11.6/100 (CENACE), as of 2026-11-12. 5 MW tracked across all listings, unverified included (as of 2026-11-07). Grid, queue and deal context for 300+ markets.
title: "Querétaro data centers: power, grid and capacity | DC Hub"
---

# Querétaro data center market

Power availability in Querétaro: DCPI verdict AVOID, composite score 11.6 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 230 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Querétaro data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Querétaro market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**11.6/100**

MW, all listings**5**sum of the sites that report MW; most do notany status, unverified listings included

Verdict**AVOID**

## Querétaro at a glance

Querétaro has 5 MW operational among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are Triara (5 MW).

Capacity by status, as of 2026-11-12

| Status | MW |
| --- | --- |
| Operational | 5 |
| Total listed | 5 |

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

## Colocation lease rates in Querétaro

DC Hub does not hold a lease-rate figure for this market yet.

The market remains fragmented across a moderate operator base, with only one tracked site publicly reporting power consumption figures, limiting visibility into total installed capacity.

The DCPI verdict of AVOID reflects a structural power supply problem. Together, these readings suggest that securing new dedicated power supply for greenfield or expansion projects will face both availability and infrastructure friction.

No recent deals have been tracked in Querétaro's data center market. The operator roster—dominated by EdgeUno and Ascenty—shows consolidation around two players, though the persistence of smaller independent operators suggests the market has not undergone major M&A activity in the observation period. Without active deal flow, the competitive and investment landscape remains stable but opaque.

## Data centers in Querétaro

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [Centro de datos Triara Querétaro](https://dchub.cloud/facilities/triara-centro-de-datos-triara-quertaro-bb9f53a2) | Triara | Operational | 5 |
| [AWS MX Central 1 (Mexico)](https://dchub.cloud/facilities/amazon-web-services-aws-mx-central-1-mexico-c701532d) | Amazon Web Services | Operational |  |
| [Amazon AWS Querétaro](https://dchub.cloud/facilities/amazon-web-services-amazon-aws-quertaro-08addc17) | Amazon Web Services | Operational |  |
| [Azure Mexico Central Queretaro](https://dchub.cloud/facilities/microsoft-azure-mexico-central-queretaro-4bf475d2) | Microsoft | Operational |  |
| [Centro de datos Ascenty Querétaro 1](https://dchub.cloud/facilities/ascenty-centro-de-datos-ascenty-quertaro-1-eb1186e7) | Ascenty | Operational |  |
| [Centro de datos Ascenty Querétaro 2](https://dchub.cloud/facilities/ascenty-centro-de-datos-ascenty-quertaro-2-7d6840cf) | Ascenty | Operational |  |
| [Centro de datos KIO QRO1 y QRO2](https://dchub.cloud/facilities/kio-centro-de-datos-kio-qro1-y-qro2-c9db4000) | KIO | Operational |  |
| [Oracle Cloud Mexico Queretaro](https://dchub.cloud/facilities/oracle-oracle-cloud-mexico-queretaro-5a2ad876) | Oracle | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Mexico](https://dchub.cloud/facilities/in/mx).

## More on Querétaro

- [Querétaro DCPI score](https://dchub.cloud/dcpi/queretaro)
- [Querétaro market brief](https://dchub.cloud/markets/queretaro/brief)

### Email me when the Querétaro DCPI verdict changes

Email me when Querétaro's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Querétaro: 5 MW tracked, any status — live, cited, and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=queretaro) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=queretaro)

JSON: [/api/v1/markets/queretaro/deep-dive](https://dchub.cloud/api/v1/markets/queretaro/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Queretaro","item":"https://dchub.cloud/markets/queretaro"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Querétaro Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:54:30.330718+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/queretaro",
 "wordCount":230,
 "about":{"@type":"Place","name":"Querétaro"},
 "description":"Live data-center market analysis. DCPI score 11.6/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "queretaro", "name": "Querétaro Data Center Market — DC Hub", "description": "Live data-center market measurements for Querétaro, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/queretaro", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Querétaro"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 5.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 11.6, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:49:10."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "AVOID", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:49:10.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:49:10."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/queretaro#webpage", "url": "https://dchub.cloud/markets/queretaro", "name": "Querétaro data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Querétaro data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Querétaro market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Querétaro data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Querétaro market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```