---
description: Is Puyallup a good data center market for power? DCPI verdict CAUTION, score 50.1/100 (WECC), as of 2026-11-12. Grid, queue and deal context for 300+ markets.
title: "Puyallup data centers: power, grid and capacity | DC Hub"
---

# Puyallup data center market

Power availability in Puyallup: DCPI verdict CAUTION, composite score 50.1 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 285 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Puyallup data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Puyallup market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**50.1/100**

MW, all listings**0**any status, unverified listings included

Verdict**CAUTION**

## Colocation lease rates in Puyallup

DC Hub does not hold a lease-rate figure for this market yet.

Puyallup's tracked colocation ecosystem comprises seven facilities operated by a small group of regional and specialized providers, with Centeris holding two build-to-suit offerings alongside single sites managed by IsoFusion/Colocation Northwest and ScaleMatrix Holdings. No recent transactions have been recorded in this market, and operator presence remains concentrated among established colocation vendors rather than hyperscale entrants. The market maintains a nascent deal pipeline with no announced acquisitions or capacity sales currently tracked.

Operator density in Puyallup centers on regional specialists rather than national platforms. Centeris operates both a core facility and a build-to-suit vehicle, positioning the company as the largest tracked presence in the market. IsoFusion and ScaleMatrix each hold single facilities, reflecting a fragmented supply base. The absence of recent tracked deals suggests limited M&A or secondary capacity transitions over the current measurement window, consistent with the region's smaller footprint relative to Pacific Northwest peers like The Dalles or emerging capacity zones.

Power procurement strategy in Puyallup should account for lead times tied to grid study requirements and utility coordination; new entrants should model for 18–36 month timelines to secure dedicated feeds or substation access, particularly if loads exceed 5–10 MW incremental demand.

## Data centers in Puyallup

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [Centeris](https://dchub.cloud/facilities/centeris-centeris-88edb326) |  | Operational |  |
| [Centeris SH1 Colocation](https://dchub.cloud/facilities/centeris-sh1-colocation-88d2ab5a) |  | Operational |  |
| [Centeris SH2 Build-to-Suit](https://dchub.cloud/facilities/centeris-sh2-build-to-suit-332766dc) |  | Operational |  |
| [Colocation Northwest - South Hill](https://dchub.cloud/facilities/isofusion-colocation-northwest-colocation-northwest-south-hill-e8dee539) | IsoFusion / Colocation Northwest | Operational |  |
| [ScaleMatrix Seattle Data Center US-West 02](https://dchub.cloud/facilities/scalematrix-holdings-inc-scalematrix-seattle-data-center-us-west-02-0bdc7f9e) | ScaleMatrix Holdings, Inc. | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Washington](https://dchub.cloud/facilities/in/us/washington).

## More on Puyallup

- [Puyallup DCPI score](https://dchub.cloud/dcpi/puyallup)
- [Puyallup market brief](https://dchub.cloud/markets/puyallup/brief)
- [Washington data center market brief](https://dchub.cloud/states/washington/brief)
- [Washington data center tax incentives](https://dchub.cloud/states/washington/data-center-incentives)

### Email me when the Puyallup DCPI verdict changes

Email me when Puyallup's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Puyallup market data is live in DC Hub — cited and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=puyallup) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=puyallup)

JSON: [/api/v1/markets/puyallup/deep-dive](https://dchub.cloud/api/v1/markets/puyallup/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Puyallup","item":"https://dchub.cloud/markets/puyallup"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Puyallup Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:21:19.358982+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/puyallup",
 "wordCount":285,
 "about":{"@type":"Place","name":"Puyallup"},
 "description":"Live data-center market analysis. DCPI score 50.1/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "puyallup", "name": "Puyallup Data Center Market — DC Hub", "description": "Live data-center market measurements for Puyallup, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/puyallup", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Puyallup"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 0.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 50.1, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:47:25."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "CAUTION", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:47:25.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:47:25."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/puyallup#webpage", "url": "https://dchub.cloud/markets/puyallup", "name": "Puyallup data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Puyallup data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Puyallup market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Puyallup data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Puyallup market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```
