description: Is Pune a good data center market for power? DCPI verdict AVOID, score 16.5/100 (POSOCO), as of 2026-11-12. Grid, queue and deal context for 300+ markets.
title: "Pune data centers: power, grid and capacity | DC Hub"
---

# Pune data center market

Power availability in Pune: DCPI verdict AVOID, composite score 16.5 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 266 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Pune data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Pune market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**16.5/100**

MW, all listings**0**any status, unverified listings included

Verdict**AVOID**

## Colocation lease rates in Pune

DC Hub does not hold a lease-rate figure for this market yet.

Extreme Infocom Pvt. Ltd. also operates two facilities, while Data Galaxy Datagalaxy, Iron Mountain Data Centers, and D-VoiS Broadband Pvt. Ltd. each manage single locations. The market has generated no tracked recent deal activity.

Together, these scores suggest that new capacity requiring power infrastructure expansion will face significant procurement lead times and availability barriers. This verdict describes the immediate feasibility of sourcing additional power for greenfield or expansion projects, not broader market fundamentals.

Operator concentration remains moderate, with no single player controlling a dominant share of tracked sites. Nxtra Data Ltd's dual-site presence positions it as the largest identifiable operator, though the distributed ownership structure across five distinct operators suggests a competitive landscape without clear consolidation trends.

## Data centers in Pune

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [AdaniConneX Pune](https://dchub.cloud/facilities/adaniconnex-adaniconnex-pune-a7d65600) | AdaniConneX | Operational |  |
| [Azure Central India Pune](https://dchub.cloud/facilities/microsoft-azure-central-india-pune-4438261f) | Microsoft | Operational |  |
| [Extreme Vega Center Swargate](https://dchub.cloud/facilities/extreme-infocom-pvt-ltd-extreme-vega-center-swargate-974bf035) | Extreme Infocom Pvt. Ltd. | Operational |  |
| [Iron Mountain Data Center - Pune (PUN-1)](https://dchub.cloud/facilities/iron-mountain-data-centers-iron-mountain-data-center-pune-pun-1-8ce02a9d) | Iron Mountain Data Centers | Operational |  |
| [STTGDC PNQ1](https://dchub.cloud/facilities/st-telemedia-global-data-centres-stt-gdc-stt-pune-1-cf75feb4) | ST Telemedia Global Data Centres (STT GDC) | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [India](https://dchub.cloud/facilities/in/in).

## More on Pune

- [Pune DCPI score](https://dchub.cloud/dcpi/pune)
- [Pune market brief](https://dchub.cloud/markets/pune/brief)
- [Indiana data center market brief](https://dchub.cloud/states/indiana/brief)
- [Indiana data center tax incentives](https://dchub.cloud/states/indiana/data-center-incentives)

### Email me when the Pune DCPI verdict changes

Email me when Pune's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Pune market data is live in DC Hub — cited and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=pune) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=pune)

JSON: [/api/v1/markets/pune/deep-dive](https://dchub.cloud/api/v1/markets/pune/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Pune","item":"https://dchub.cloud/markets/pune"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Pune Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:54:22.551777+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/pune",
 "wordCount":266,
 "about":{"@type":"Place","name":"Pune"},
 "description":"Live data-center market analysis. DCPI score 16.5/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "pune", "name": "Pune Data Center Market — DC Hub", "description": "Live data-center market measurements for Pune, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/pune", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Pune"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 0.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 16.5, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:49:10."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "AVOID", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:49:10.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:49:10."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/pune#webpage", "url": "https://dchub.cloud/markets/pune", "name": "Pune data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Pune data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Pune market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Pune data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Pune market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```