description: Is Providence a good data center market for power? DCPI verdict AVOID, score 33.9/100 (ISONE), as of 2026-11-12. Grid, queue and deal context for 300+ markets.
title: "Providence data centers: power, grid and capacity | DC Hub"
---

# Providence data center market

Power availability in Providence: DCPI verdict AVOID, composite score 33.9 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 263 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Providence data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Providence market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**33.9/100**

MW, all listings**0**any status, unverified listings included

Verdict**AVOID**

## Colocation lease rates in Providence

DC Hub does not hold a lease-rate figure for this market yet.

No tracked facility has reported megawatt capacity to the market, making total footprint opaque.

The DCPI verdict of AVOID signals material friction in acquiring new power supply. A score this low reflects either tight distribution infrastructure, limited utility appetite for new load, or both—conditions that compound over time as incumbent facilities lock in positions. For siting and build teams, this means utility engagement must begin early and assume protracted negotiation cycles.

Deal flow in Providence remains absent from recent tracking, and the operator roster reflects a mix of regional and national carriers rather than hyperscale or wholesale colocation players. Provdotnet LLC's three-site footprint is the largest single operator presence; the rest are distributed across two facilities each or held singly. The lack of recent deal records—paired with no operator announcements in tracked news—indicates either market maturity with stable holdings or limited capital activity focused on new supply.

Power availability will remain the primary gating factor for new projects in Providence through 2026 and beyond.

## Data centers in Providence

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [Crown Castle Providence (235 Promenade)](https://dchub.cloud/facilities/crown-castle-inc-crown-castle-providence-235-promenade-999ec121) | Crown Castle Inc. | Operational |  |
| [Crown Castle Providence (300 Carpenter)](https://dchub.cloud/facilities/crown-castle-inc-crown-castle-providence-300-carpenter-de98efd4) | Crown Castle Inc. | Operational |  |
| [Prov.net 935](https://dchub.cloud/facilities/provdotnet-llc-provnet-935-328eea16) | Provdotnet LLC | Operational |  |
| [Prov.net PVD1 (1155 Westminster)](https://dchub.cloud/facilities/provdotnet-llc-provnet-pvd1-1155-westminster-3b6b68ee) | Provdotnet LLC | Operational |  |
| [Prov.net PVD2 (304 Carpenter)](https://dchub.cloud/facilities/provdotnet-llc-provnet-pvd2-304-carpenter-a492ad27) | Provdotnet LLC | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Rhode Island](https://dchub.cloud/facilities/in/us/rhode-island).

## More on Providence

- [Providence DCPI score](https://dchub.cloud/dcpi/providence)
- [Providence market brief](https://dchub.cloud/markets/providence/brief)
- [Rhode Island data center market brief](https://dchub.cloud/states/rhode-island/brief)
- [Rhode Island data center tax incentives](https://dchub.cloud/states/rhode-island/data-center-incentives)

### Email me when the Providence DCPI verdict changes

Email me when Providence's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Providence market data is live in DC Hub — cited and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=providence) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=providence)

JSON: [/api/v1/markets/providence/deep-dive](https://dchub.cloud/api/v1/markets/providence/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Providence","item":"https://dchub.cloud/markets/providence"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Providence Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:21:08.742453+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/providence",
 "wordCount":263,
 "about":{"@type":"Place","name":"Providence"},
 "description":"Live data-center market analysis. DCPI score 33.9/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "providence", "name": "Providence Data Center Market — DC Hub", "description": "Live data-center market measurements for Providence, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/providence", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Providence"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 0.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 33.9, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:46:13."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "AVOID", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:46:13.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:46:13."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/providence#webpage", "url": "https://dchub.cloud/markets/providence", "name": "Providence data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Providence data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Providence market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Providence data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Providence market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```