---
description: Is Prague a good data center market for power? DCPI verdict AVOID, score 15.3/100 (ENTSOE-CZ), as of 2026-11-12. 20 MW tracked across all listings, unverified included (as of 2026-11-07). Grid, queue and deal context for 300+ markets.
title: "Prague data centers: power, grid and capacity | DC Hub"
---

# Prague data center market

Power availability in Prague: DCPI verdict AVOID, composite score 15.3 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 221 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Prague data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Prague market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**15.3/100**

MW, all listings**20**sum of the sites that report MW; most do notany status, unverified listings included

Verdict**AVOID**

## Prague at a glance

Prague has 5 MW operational among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are Seznam.cz (5 MW).

Capacity by status, as of 2026-11-12

| Status | MW |
| --- | --- |
| Operational | 5 |
| Total listed | 5 |

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

## Colocation lease rates in Prague

DC Hub does not hold a lease-rate figure for this market yet.

CE Colo Czech s.r.o. operates the largest single presence with three facilities, followed by Coolhousing s.r.o. and GTS Novera, a.s., each managing two sites. The market remains fragmented across a moderate number of smaller operators, with no recent deal activity recorded in the tracked dataset.

This combination produces an AVOID designation for parties dependent on straightforward power procurement; new projects will face elevated lead times and negotiation complexity for grid connection and supply commitments.

The absence of deal flow over the measurement window prevents inference about M&A appetite, operator growth strategy, or market consolidation trends. The three-operator concentration among tracked facilities—CE Colo Czech, Coolhousing, and GTS Novera—reflects the market's current competitive structure, but no deal data illuminates whether this composition is stabilizing or subject to change.

## Data centers in Prague

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [Datové centrum Nagoja](https://dchub.cloud/facilities/seznamcz-datov-centrum-nagoja-bb592f30) | Seznam.cz | Operational | 5 |
| [CE Colo DC7 Prague](https://dchub.cloud/facilities/ce-colo-czech-sro-ce-colo-dc7-prague-0182fc4f) | CE Colo Czech s.r.o. | Operational |  |
| [DC Stodůlky](https://dchub.cloud/facilities/o2-czech-republic-as-dc-stodlky-448f7eeb) | O2 Czech Republic a.s. | Operational |  |
| [DC Tower](https://dchub.cloud/facilities/esk-radiokomunikace-as-dc-tower-9b139101) | České Radiokomunikace, a.s. | Operational |  |
| [Datové centrum Zeleneč](https://dchub.cloud/facilities/datov-centrum-zelene-datov-centrum-zelene-d3f68e5c) |  | Operational |  |
| [Eltodo Sarka](https://dchub.cloud/facilities/eltodo-as-eltodo-sarka-80bdcf10) | ELTODO a.s. | Operational |  |
| [Pragonet Telehouse Prague](https://dchub.cloud/facilities/t-systems-pragonet-as-pragonet-telehouse-prague-3792c37d) | T-Systems Pragonet, a.s. | Operational |  |
| [SafeDX s.r.o.](https://dchub.cloud/facilities/safedx-sro-safedx-sro-b91299fe) |  | Operational |  |
| [T-Mobile CZ DC7](https://dchub.cloud/facilities/t-mobile-czech-republic-as-t-mobile-cz-dc7-05fb4fdf) | T-Mobile Czech Republic a.s. | Operational |  |
| [TTC TELEPORT DC2](https://dchub.cloud/facilities/ttc-teleport-sro-ttc-teleport-dc2-6da59e9f) | TTC Teleport s.r.o. | Operational |  |
| [UPL TELECOM s.r.o.](https://dchub.cloud/facilities/upl-telecom-upl-telecom-sro-bd1f99b3) | UPL TELECOM | Operational |  |
| [VSHosting ServerPark DC1](https://dchub.cloud/facilities/vshosting-sro-vshosting-serverpark-dc1-a4fdf6c5) | VSHosting s.r.o. | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Czechia](https://dchub.cloud/facilities/in/cz).

## More on Prague

- [Prague DCPI score](https://dchub.cloud/dcpi/prague)
- [Prague market brief](https://dchub.cloud/markets/prague/brief)

### Email me when the Prague DCPI verdict changes

Email me when Prague's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Prague: 20 MW tracked, any status — live, cited, and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=prague) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=prague)

JSON: [/api/v1/markets/prague/deep-dive](https://dchub.cloud/api/v1/markets/prague/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Prague","item":"https://dchub.cloud/markets/prague"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Prague Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:20:51.529551+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/prague",
 "wordCount":221,
 "about":{"@type":"Place","name":"Prague"},
 "description":"Live data-center market analysis. DCPI score 15.3/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "prague", "name": "Prague Data Center Market — DC Hub", "description": "Live data-center market measurements for Prague, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/prague", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Prague"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 20.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 15.3, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:48:55."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "AVOID", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:48:55.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:48:55."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/prague#webpage", "url": "https://dchub.cloud/markets/prague", "name": "Prague data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Prague data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Prague market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Prague data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Prague market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```
