description: Is Portland (Portland-Hillsboro) a good data center market for power? DCPI verdict CAUTION, score 44.7/100 (WECC), as of 2026-11-12. 283 MW tracked across all listings, unverified included (as of 2026-11-10). Grid, queue and deal context for 300+ markets.
title: "Portland (Portland-Hillsboro) data centers: power, grid and capacity | DC Hub"
---

# Portland (Portland-Hillsboro) data center market

Power availability in Portland (Portland-Hillsboro): DCPI verdict CAUTION, composite score 44.7 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 229 words · generated 2026-11-10 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Portland (Portland-Hillsboro) data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Portland (Portland-Hillsboro) market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**44.7/100**

MW, all listings**283**sum of the sites that report MW; most do notany status, unverified listings included

Verdict**CAUTION**

## Portland at a glance

Portland has 155 MW operational among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are Stack Infrastructure (60 MW), EdgeConneX (35 MW) and Infomart (35 MW).

Capacity by status, as of 2026-11-12

| Status | MW |
| --- | --- |
| Operational | 155 |
| Total listed | 155 |

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

## Colocation lease rates in Portland

Broker lease rates (CBRE/JLL): available on paid plans. Asking base rent per kW of critical IT capacity. Electricity is normally billed separately (metered pass-through), plus cross-connects and one-time fees. Signed deals, term and size change the number. Source: CBRE North America Data Center Trends H1 2026 (250+ kW): Hillsboro/Portland (figure on paid plans) [(link)](https://www.cbre.com/insights/books/north-america-data-center-trends-h1-2026)

The market is fragmented across multiple operators, with Stack Infrastructure and Flexential each running four sites, followed by Quality Technology Services and EdgeConneX with three sites each. Power distribution remains uneven across the portfolio, reflecting the region's variable infrastructure maturity.

This combination suggests that while power is not acutely scarce, operators planning expansions should expect deliberate project lead times and grid coordination challenges rather than rapid deployment windows.

Recent deal activity in the Portland region remains muted at the tracked level. News reports indicate Portland is attracting developer interest, including proposals to convert office towers into data center space and heightened municipal attention to transparency in deal structuring. The operator base shows no signs of consolidation, with five distinct players maintaining operational or planned assets across the market.

## Data centers in Portland

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [Stack Portland](https://dchub.cloud/facilities/stack-infrastructure-stack-portland-6c5c4092) | Stack Infrastructure | Operational | 60 |
| [EdgeConneX Portland](https://dchub.cloud/facilities/edgeconnex-edgeconnex-portland-920310ca) | EdgeConneX | Operational | 35 |
| [Infomart Portland](https://dchub.cloud/facilities/infomart-infomart-portland-a1097320) | Infomart | Operational | 35 |
| [Flexential Hillsboro](https://dchub.cloud/facilities/flexential-flexential-hillsboro-36f25bf1) | Flexential | Operational | 15 |
| [Flexential Portland - Hillsboro 3](https://dchub.cloud/facilities/flexential-flexential-portland-hillsboro-3-cd5b15f4) | Flexential | Operational | 10 |
| [Digital Fortress (PTL)](https://dchub.cloud/facilities/digital-fortress-digital-fortress-ptl-caeb9b7d) | Digital Fortress | Operational |  |
| [Digital Fortress - Portland 1](https://dchub.cloud/facilities/digital-fortress-inc-digital-fortress-portland-1-27e13114) | Digital Fortress, Inc | Operational |  |
| [Digital Realty PDX1 Portland](https://dchub.cloud/facilities/digital-realty-digital-realty-pdx1-portland-cfe1170a) | Digital Realty | Operational |  |
| [Digital Realty Portland - PDX10](https://dchub.cloud/facilities/digital-realty-digital-realty-pdx-3825-ne-aloclek-dr-2ee4eda8) | Digital Realty | Operational |  |
| [EdgeConneX Data Center](https://dchub.cloud/facilities/edgeconnex-edgeconnex-data-center-11e7a31a) | EdgeConneX | Operational |  |
| [EdgeConneX Portland (EDCPOR01)](https://dchub.cloud/facilities/edgeconnex-inc-edgeconnex-portland-edcpor01-dfb1c9d4) | EdgeConneX Inc. | Operational |  |
| [EdgeConneX Portland OR](https://dchub.cloud/facilities/edgeconnex-edgeconnex-portland-or-5291e536) | EdgeConneX | Operational |  |
| [Flexential - Portland/Hillsboro (PDX01)](https://dchub.cloud/facilities/flexential-corp-flexential-portlandhillsboro-pdx01-ff9466e9) | Flexential Corp. | Operational |  |
| [Flexential - Portland/Hillsboro 2 (PDX02)](https://dchub.cloud/facilities/flexential-corp-flexential-portlandhillsboro-2-pdx02-65064ea0) | Flexential Corp. | Operational |  |
| [Flexential - Portland/Hillsboro 4 (PDX04)](https://dchub.cloud/facilities/flexential-corp-flexential-portlandhillsboro-4-pdx04-9d92aba6) | Flexential Corp. | Operational |  |
| [H5 DC - Portland](https://dchub.cloud/facilities/h5-data-centers-h5-dc-portland-8286c6e7) | H5 Data Centers | Operational |  |
| [H5 Data Centers Portland (OR01)](https://dchub.cloud/facilities/h5-data-centers-h5-data-centers-portland-or01-a61cf83f) | H5 Data Centers | Operational |  |
| [LightPoint Corporation](https://dchub.cloud/facilities/lightpoint-corporation-lightpoint-corporation-c3e6ef6b) |  | Operational |  |
| [Lumen Portland](https://dchub.cloud/facilities/lumen-technologies-lumen-portland-b38bdb7d) | Lumen Technologies | Operational |  |
| [NTT Portland OR DC](https://dchub.cloud/facilities/ntt-ntt-portland-or-dc-0bcb9b8d) | NTT | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Oregon](https://dchub.cloud/facilities/in/us/oregon).

## More on Portland

- [Portland DCPI score](https://dchub.cloud/dcpi/portland-or)
- [Portland market brief](https://dchub.cloud/markets/portland-or/brief)
- [Oregon data center market brief](https://dchub.cloud/states/oregon/brief)
- [Oregon data center tax incentives](https://dchub.cloud/states/oregon/data-center-incentives)

### Email me when the Portland DCPI verdict changes

Email me when Portland's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Portland: 283 MW tracked, any status — live, cited, and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=portland-or) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=portland-or)

JSON: [/api/v1/markets/portland-or/deep-dive](https://dchub.cloud/api/v1/markets/portland-or/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-10, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Portland Or","item":"https://dchub.cloud/markets/portland-or"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Portland (Portland-Hillsboro) Data Center Market Deep-Dive",
 "datePublished":"2026-11-10T05:27:23.385322+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/portland-or",
 "wordCount":229,
 "about":{"@type":"Place","name":"Portland (Portland-Hillsboro)"},
 "description":"Live data-center market analysis. DCPI score 44.7/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "portland-or", "name": "Portland Data Center Market — DC Hub", "description": "Live data-center market measurements for Portland, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/portland-or", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Portland"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 283.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 44.7, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:48:10."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "CAUTION", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:48:10.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:48:10."}], "dateModified": "2026-11-10", "temporalCoverage": "2026-11-10"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/portland-or#webpage", "url": "https://dchub.cloud/markets/portland-or", "name": "Portland (Portland-Hillsboro) data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Portland (Portland-Hillsboro) data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Portland (Portland-Hillsboro) market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Portland (Portland-Hillsboro) data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Portland (Portland-Hillsboro) market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```