---
description: Is Portland, ME a good data center market for power? DCPI verdict AVOID, score 32.3/100 (ISONE), as of 2026-11-12. 283 MW tracked across all listings, unverified included (as of 2026-11-07). Grid, queue and deal context for 300+ markets.
title: "Portland, ME data centers: power, grid and capacity | DC Hub"
---

# Portland, ME data center market

Power availability in Portland, ME: DCPI verdict AVOID, composite score 32.3 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 278 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Portland, ME data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Portland, ME market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**32.3/100**

MW, all listings**283**sum of the sites that report MW; most do notany status, unverified listings included

Verdict**AVOID**

## Portland, ME at a glance

Portland, ME has 10 MW planned among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are Nautilus Data Technologies (10 MW).

Capacity by status, as of 2026-11-12

| Status | MW |
| --- | --- |
| Planned | 10 |
| Total listed | 10 |

## Developers building or planning in Portland, ME

| Operator | Under construction MW | Planned MW |
| --- | --- | --- |
| Nautilus Data Technologies |  | 10 |

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

## Colocation lease rates in Portland, ME

DC Hub does not hold a lease-rate figure for this market yet.

Portland's data center footprint consists of six tracked facilities operated by a mix of regional and national players, with CENTRA Digital Interconnect running two sites and Consolidated Communications, FirstLight, NNENIX, and Nautilus Data Technologies each operating one. The market has attracted modest consolidation interest—regulatory attention in nearby municipalities signals growing awareness of data center deployment—but no recent transactions have been recorded in Portland proper over the tracked window.

These paired signals suggest that operators seeking to expand or new entrants planning greenfield builds should expect deliberate timelines and elevated coordination requirements with local utilities and grid operators. The combination does not foreclose deployment—it means power availability and interconnection speed are the binding variables, not demand.

Operator fragmentation remains pronounced, with no dominant player and no tracked recent deals in the market. Nearby regulatory moves—South Berwick's data center moratorium and Portland, Oregon's emerging transparency rules around data center transactions—reflect broader municipal scrutiny across the region, though these actions do not directly constrain Portland, ME's current permit or interconnection environment.

Forward momentum depends on utility-side capacity additions and interconnection queue visibility, neither of which has generated public announcements in the immediate term.

## Data centers in Portland, ME

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [Nautilus Maine](https://dchub.cloud/facilities/nautilus-data-technologies-nautilus-maine-c0336e33) | Nautilus Data Technologies | Planned | 10 |
| [CENTRA PWM1 - Portland, Maine (340 Cumberland)](https://dchub.cloud/facilities/centra-digital-interconnect-centra-pwm1-portland-maine-340-cumberland-d2cfc65e) | CENTRA Digital Interconnect | Operational |  |
| [Consolidated - 45 Forest Ave.](https://dchub.cloud/facilities/consolidated-communications-inc-consolidated-45-forest-ave-8188b114) | Consolidated Communications, Inc. | Operational |  |
| [FirstLight Data Center](https://dchub.cloud/facilities/firstlight-firstlight-data-center-b50a5389) | FirstLight | Operational |  |
| [FirstLight Regen Hut](https://dchub.cloud/facilities/nnenix-firstlight-regen-hut-0744e1ba) | NNENIX | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Maine](https://dchub.cloud/facilities/in/us/maine).

## More on Portland, ME

- [Portland, ME DCPI score](https://dchub.cloud/dcpi/portland-me)
- [Portland, ME market brief](https://dchub.cloud/markets/portland-me/brief)
- [Maine data center market brief](https://dchub.cloud/states/maine/brief)
- [Maine data center tax incentives](https://dchub.cloud/states/maine/data-center-incentives)

### Email me when the Portland, ME DCPI verdict changes

Email me when Portland, ME's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Portland, ME: 283 MW tracked, any status — live, cited, and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=portland-me) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=portland-me)

JSON: [/api/v1/markets/portland-me/deep-dive](https://dchub.cloud/api/v1/markets/portland-me/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Portland Me","item":"https://dchub.cloud/markets/portland-me"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Portland, ME Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:37:06.870638+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/portland-me",
 "wordCount":278,
 "about":{"@type":"Place","name":"Portland, ME"},
 "description":"Live data-center market analysis. DCPI score 32.3/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "portland-me", "name": "Portland, ME Data Center Market — DC Hub", "description": "Live data-center market measurements for Portland, ME, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/portland-me", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Portland, ME"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 283.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 32.3, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:46:52."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "AVOID", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:46:52.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:46:52."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/portland-me#webpage", "url": "https://dchub.cloud/markets/portland-me", "name": "Portland, ME data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Portland, ME data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Portland, ME market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Portland, ME data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Portland, ME market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```
