---
description: Is Plano a good data center market for power? DCPI verdict CAUTION, score 43.2/100 (ERCOT), as of 2026-11-12. 814 MW tracked across all listings, unverified included (as of 2026-11-07). Grid, queue and deal context for 300+ markets.
title: "Plano data centers: power, grid and capacity | DC Hub"
---

# Plano data center market

Power availability in Plano: DCPI verdict CAUTION, composite score 43.2 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 269 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Plano data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Plano market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**43.2/100**

MW, all listings**814**sum of the sites that report MW; most do notany status, unverified listings included

Verdict**CAUTION**

## Plano at a glance

Plano has 454 MW operational among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are CoreWeave (230 MW), Aligned (182 MW) and Nvidia (30 MW).

Capacity by status, as of 2026-11-12

| Status | MW |
| --- | --- |
| Operational | 454 |
| Total listed | 454 |

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

## Colocation lease rates in Plano

DC Hub does not hold a lease-rate figure for this market yet.

This combination—neither flush nor starved—defines the current operating environment.

This is not a power scarcity signal; it is a signal that new power comes with friction.

Recent deal activity in Plano is not tracked. Aligned Data Centers has announced three separate acquisitions in prior periods, and CoreWeave operates two facilities in the market, but no new transactions appear in the current monitoring window. DataBank's broader acquisition strategy—documented in other markets—reflects the sector's consolidation trend, though Plano-specific activity is absent from recent records. The operator roster is stable and concentrated, with the top four operators controlling the majority of tracked capacity.

## Data centers in Plano

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [CoreWeave Plano Campus](https://dchub.cloud/facilities/coreweave-coreweave-plano-campus-cf4e7f75) | CoreWeave | Operational | 200 |
| [Aligned DFW Campus](https://dchub.cloud/facilities/aligned-aligned-dfw-campus-d2492837) | Aligned | Operational | 150 |
| [Aligned Dallas](https://dchub.cloud/facilities/aligned-aligned-dallas-2fc3ebb3) | Aligned | Operational | 32 |
| [CoreWeave Plano TX (Lincoln Rackhouse)](https://dchub.cloud/facilities/coreweave-coreweave-plano-tx-lincoln-rackhouse-b86609b7) | CoreWeave | Operational | 30 |
| [Nvidia DGX SuperPOD (Plano TX)](https://dchub.cloud/facilities/nvidia-nvidia-dgx-superpod-plano-tx-442ca3d4) | Nvidia | Operational | 30 |
| [DataBank DFW3](https://dchub.cloud/facilities/databank-databank-dfw3-8bfaae3b) | DataBank | Operational | 12 |
| [Aligned Dallas (DFW-01)](https://dchub.cloud/facilities/aligned-data-centers-aligned-dallas-dfw-01-d6455abd) | Aligned Data Centers | Operational |  |
| [Aligned Energy Plano TX](https://dchub.cloud/facilities/aligned-aligned-energy-plano-tx-a501b90f) | Aligned | Operational |  |
| [Equinix DA7 - Dallas](https://dchub.cloud/facilities/equinix-equinix-da7-dallas-cfe8eca5) | Equinix | Operational |  |
| [Flexential - Dallas/Plano (DFW01)](https://dchub.cloud/facilities/flexential-corp-flexential-dallasplano-dfw01-c6186d64) | Flexential Corp. | Operational |  |
| [Flexential Dallas - Plano](https://dchub.cloud/facilities/flexential-flexential-dallas-plano-27f51a06) | Flexential | Operational |  |
| [Lincoln Rackhouse Dallas](https://dchub.cloud/facilities/lincoln-rackhouse-lincoln-rackhouse-dallas-62917a4f) | Lincoln Rackhouse | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Texas](https://dchub.cloud/facilities/in/us/texas).

## More on Plano

- [Plano DCPI score](https://dchub.cloud/dcpi/plano)
- [Plano market brief](https://dchub.cloud/markets/plano/brief)
- [Texas data center market brief](https://dchub.cloud/states/texas/brief)
- [Texas data center tax incentives](https://dchub.cloud/states/texas/data-center-incentives)

### Email me when the Plano DCPI verdict changes

Email me when Plano's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Plano: 814 MW tracked, any status — live, cited, and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=plano) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=plano)

JSON: [/api/v1/markets/plano/deep-dive](https://dchub.cloud/api/v1/markets/plano/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Plano","item":"https://dchub.cloud/markets/plano"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Plano Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:18:15.178539+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/plano",
 "wordCount":269,
 "about":{"@type":"Place","name":"Plano"},
 "description":"Live data-center market analysis. DCPI score 43.2/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "plano", "name": "Plano Data Center Market — DC Hub", "description": "Live data-center market measurements for Plano, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/plano", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Plano"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 814.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 43.2, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:45:36."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "CAUTION", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:45:36.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:45:36."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/plano#webpage", "url": "https://dchub.cloud/markets/plano", "name": "Plano data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Plano data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Plano market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Plano data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Plano market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```
