# Piscataway data center market

Power availability in Piscataway: DCPI verdict AVOID, composite score 21.6 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 262 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Piscataway data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Piscataway market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**21.6/100**

MW, all listings**80**sum of the sites that report MW; most do notany status, unverified listings included

Verdict**AVOID**

This analysis was written on 2026-11-07, when the Data Center Power Index for this market read 21.8. The index is recomputed through the day and reads 21.6 now — the figure above is the live one, and the narrative below describes the market as it stood when it was written.

## Piscataway at a glance

Piscataway has 5 MW operational among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are Quality Technology Services (5 MW).

Capacity by status, as of 2026-11-12

| Status | MW |
| --- | --- |
| Operational | 5 |
| Total listed | 5 |

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

## Colocation lease rates in Piscataway

DC Hub does not hold a lease-rate figure for this market yet.

QTS Realty operates two sites, QTS operates two additional facilities, and Barclays Capital Data Center and Centersquare each operate one site. The operator base remains fragmented, with no single player commanding dominant capacity.

Together, these metrics flag that operators seeking to expand or acquire new capacity here will face extended lead times for power availability and elevated costs for grid reinforcement. The verdict does not assess market demand or facility quality—it isolates a specific bottleneck: the power supply pathway is not favorable for growth-stage projects.

No recent deals are currently tracked in Piscataway. QTS's dual-site presence positions it as the largest single operator, but no recent deals suggest either consolidation or expansion momentum within the local footprint.

## Data centers in Piscataway

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [QTS Piscataway Data Center](https://dchub.cloud/facilities/quality-technology-services-qts-piscataway-data-center-8f836869) | Quality Technology Services | Operational | 5 |
| [BARCLAYS CAPITAL DATA CENTER](https://dchub.cloud/facilities/barclays-capital-data-center-piscataway-11bfccc1) |  |  |  |
| [Barclays Datacenter](https://dchub.cloud/facilities/barclays-barclays-datacenter-190cf3bc) | Barclays | Operational |  |
| [Centersquare New Jersey (EWR3)](https://dchub.cloud/facilities/centersquare-centersquare-new-jersey-ewr3-a4cabbd5) | Centersquare | Operational |  |
| [DataBank Piscataway (EWR2)](https://dchub.cloud/facilities/databank-databank-piscataway-ewr2-99a84080) | DataBank | Operational |  |
| [Digital Fortress (PNJ)](https://dchub.cloud/facilities/digital-fortress-digital-fortress-pnj-386db907) | Digital Fortress | Operational |  |
| [Digital Realty EWR (3 Corporate Pl)](https://dchub.cloud/facilities/digital-realty-digital-realty-ewr-3-corporate-pl-b3d9240a) | Digital Realty | Operational |  |
| [EVOQUE DATA CENTER SOLUTIONS - PNJ1](https://dchub.cloud/facilities/evoque-data-center-solutions-pnj1-4c6f4331) |  |  |  |
| [Open Data Centers Piscataway](https://dchub.cloud/facilities/open-data-centers-piscataway-a131e8cb) |  | Operational |  |
| [PSE&G Delivery Emergency Response Center](https://dchub.cloud/facilities/pseg-pseg-delivery-emergency-response-center-7fb20add) | PSE&G | Operational |  |
| [QTS Piscataway (PNJ1)](https://dchub.cloud/facilities/qts-qts-piscataway-pnj1-ef5bf01f) | QTS | Operational |  |
| [QTS Piscataway NJ DC](https://dchub.cloud/facilities/qts-realty-qts-piscataway-nj-dc-6f273772) | QTS Realty | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [New Jersey](https://dchub.cloud/facilities/in/us/new-jersey).

## More on Piscataway

- [Piscataway DCPI score](https://dchub.cloud/dcpi/piscataway)
- [Piscataway market brief](https://dchub.cloud/markets/piscataway/brief)
- [New Jersey data center market brief](https://dchub.cloud/states/new-jersey/brief)
- [New Jersey data center tax incentives](https://dchub.cloud/states/new-jersey/data-center-incentives)

### Email me when the Piscataway DCPI verdict changes

Email me when Piscataway's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Piscataway: 80 MW tracked, any status — live, cited, and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=piscataway) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=piscataway)

JSON: [/api/v1/markets/piscataway/deep-dive](https://dchub.cloud/api/v1/markets/piscataway/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Piscataway","item":"https://dchub.cloud/markets/piscataway"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Piscataway Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:17:51.704123+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/piscataway",
 "wordCount":262,
 "about":{"@type":"Place","name":"Piscataway"},
 "description":"Live data-center market analysis. DCPI score 21.6/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "piscataway", "name": "Piscataway Data Center Market — DC Hub", "description": "Live data-center market measurements for Piscataway, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/piscataway", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Piscataway"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 80.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 21.6, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:46:01."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "AVOID", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:46:01.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:46:01."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/piscataway#webpage", "url": "https://dchub.cloud/markets/piscataway", "name": "Piscataway data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Piscataway data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Piscataway market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Piscataway data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Piscataway market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```