description: Is Piscataway Township a good data center market for power? DCPI verdict AVOID, score 22.5/100 (PJM), as of 2026-11-12. 28 MW tracked across all listings, unverified included (as of 2026-11-07). Grid, queue and deal context for 300+ markets.
title: "Piscataway Township data centers: power, grid and capacity | DC Hub"
---

# Piscataway Township data center market

Power availability in Piscataway Township: DCPI verdict AVOID, composite score 22.5 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 231 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Piscataway Township data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Piscataway Township market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**22.5/100**

MW, all listings**28**sum of the sites that report MW; some do notany status, unverified listings included

Verdict**AVOID**

This analysis was written on 2026-11-07, when the Data Center Power Index for this market read 22.7. The index is recomputed through the day and reads 22.5 now — the figure above is the live one, and the narrative below describes the market as it stood when it was written.

## Piscataway Township at a glance

Piscataway Township has 28 MW operational among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are Digital Realty (28 MW).

Capacity by status, as of 2026-11-12

| Status | MW |
| --- | --- |
| Operational | 28 |
| Total listed | 28 |

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

## Colocation lease rates in Piscataway Township

DC Hub does not hold a lease-rate figure for this market yet.

Digital Realty operates 2 of these facilities, establishing the largest single operator presence in the market. The township's data center footprint remains small relative to regional peers, with total capacity well below 50 MW.

Taken together, these scores suggest that securing incremental megawatts for expansion or new builds will face headwinds from grid availability and procurement timelines. Site developers and operators planning capacity additions should expect extended utility coordination cycles and potential limitations on nameplate sizing.

No recent deals have been tracked in Piscataway Township, leaving operator composition stable around the Digital Realty anchor. Peer markets in New Jersey, including Bridgewater Township, operate fragmented facility portfolios across multiple operators, providing a template for how consolidation and diversification might eventually reshape Piscataway if new power infrastructure improves.

Grid relief or utility-led infrastructure investment would be required to materially improve the power procurement outlook for this market.

## Data centers in Piscataway Township

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [Digital Realty New York EWR11](https://dchub.cloud/facilities/digital-realty-digital-realty-new-york-ewr11-c1241d63) | Digital Realty | Operational | 14 |
| [Digital Realty New York EWR12](https://dchub.cloud/facilities/digital-realty-digital-realty-new-york-ewr12-7793ca00) | Digital Realty | Operational | 14 |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [New Jersey](https://dchub.cloud/facilities/in/us/new-jersey).

## More on Piscataway Township

- [Piscataway Township DCPI score](https://dchub.cloud/dcpi/piscataway-township)
- [Piscataway Township market brief](https://dchub.cloud/markets/piscataway-township/brief)
- [New Jersey data center market brief](https://dchub.cloud/states/new-jersey/brief)
- [New Jersey data center tax incentives](https://dchub.cloud/states/new-jersey/data-center-incentives)

### Email me when the Piscataway Township DCPI verdict changes

Email me when Piscataway Township's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Piscataway Township: 28 MW tracked, any status — live, cited, and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=piscataway-township) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=piscataway-township)

JSON: [/api/v1/markets/piscataway-township/deep-dive](https://dchub.cloud/api/v1/markets/piscataway-township/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Piscataway Township","item":"https://dchub.cloud/markets/piscataway-township"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Piscataway Township Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:17:59.949238+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/piscataway-township",
 "wordCount":231,
 "about":{"@type":"Place","name":"Piscataway Township"},
 "description":"Live data-center market analysis. DCPI score 22.5/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "piscataway-township", "name": "Piscataway Township Data Center Market — DC Hub", "description": "Live data-center market measurements for Piscataway Township, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/piscataway-township", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Piscataway Township"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 28.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 22.5, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:47:48."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "AVOID", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:47:48.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:47:48."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/piscataway-township#webpage", "url": "https://dchub.cloud/markets/piscataway-township", "name": "Piscataway Township data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Piscataway Township data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Piscataway Township market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Piscataway Township data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Piscataway Township market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```