description: Is Phoenix a good data center market for power? DCPI verdict CAUTION, score 43.5/100 (WECC), as of 2026-11-12. 4,323 MW tracked across all listings, unverified included (as of 2026-11-09). Grid, queue and deal context for 300+ markets.
title: "Phoenix data centers: power, grid and capacity | DC Hub"
---

# Phoenix data center market

Power availability in Phoenix: DCPI verdict CAUTION, composite score 43.5 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 228 words · generated 2026-11-09 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Phoenix data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Phoenix market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**43.5/100**

MW, all listings**4,323**sum of the sites that report MW; most do notany status, unverified listings included

Verdict**CAUTION**

## Phoenix at a glance

Phoenix has 2,341 MW operational and 557 MW under construction among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are Microsoft (450 MW), Vantage Data Centers (394 MW) and EdgeCore Digital Infrastructure (344 MW).

Capacity by status, as of 2026-11-12

| Status | MW |
| --- | --- |
| Operational | 2,341 |
| Under construction | 557 |
| Total listed | 2,898 |

## Developers building or planning in Phoenix

| Operator | Under construction MW | Planned MW |
| --- | --- | --- |
| Compass Datacenters | 212 |  |
| EdgeCore Digital Infrastructure | 144 |  |
| Novva Data Centers | 126 |  |
| H5 Data Centers | 50 |  |
| Thor Equities | 25 |  |

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

## Colocation lease rates in Phoenix

Broker lease rates (CBRE/JLL): available on paid plans. Asking base rent per kW of critical IT capacity. Electricity is normally billed separately (metered pass-through), plus cross-connects and one-time fees. Signed deals, term and size change the number. Source: CBRE North America Data Center Trends H1 2026 (250+ kW): Phoenix (figure on paid plans) [(link)](https://www.cbre.com/insights/books/north-america-data-center-trends-h1-2026)

The market spans operational, under-construction, and planned assets, reflecting both legacy infrastructure and ongoing expansion. Recent M&A activity includes RadiusDC's acquisition of PhoenixNAP's Phoenix data center and colocation business, announced March 12, 2026.

This combination reflects a market where available capacity exists but faces meaningful delivery obstacles. Projects seeking grid access should anticipate friction in the interconnection timeline and availability windows, though neither metric reaches critical thresholds that would prevent new supply contracts outright.

The RadiusDC transaction represents active operator repositioning in Phoenix's colocation and wholesale segments. Deal flow, while not prolific, underscores that Phoenix retains operational interest from mid-tier and larger platforms willing to acquire or invest in existing assets and capabilities.

## Data centers in Phoenix

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [Microsoft Azure West US 3 (Phoenix)](https://dchub.cloud/facilities/microsoft-microsoft-azure-west-us-3-phoenix-47b0782e) | Microsoft | Operational | 300 |
| [Compass Goodyear Campus (Phoenix)](https://dchub.cloud/facilities/compass-datacenters-compass-goodyear-campus-phoenix-dc9da94a) | Compass Datacenters | Under Construction | 212 |
| [EdgeCore Mesa Campus PH01](https://dchub.cloud/facilities/edgecore-digital-infrastructure-edgecore-mesa-campus-ph01-54e3fad5) | EdgeCore Digital Infrastructure | Operational | 200 |
| [Meta Phoenix DC](https://dchub.cloud/facilities/meta-meta-phoenix-dc-647dbd3b) | Meta | Operational | 200 |
| [Vantage Phoenix Campus](https://dchub.cloud/facilities/vantage-data-centers-vantage-phoenix-campus-a4f2d978) | Vantage Data Centers | Operational | 200 |
| [Aligned Phoenix Campus](https://dchub.cloud/facilities/aligned-aligned-phoenix-campus-ac6ab1fc) | Aligned | Operational | 180 |
| [Google Mesa](https://dchub.cloud/facilities/google-google-mesa-51ea53e4) | Google | Operational | 150 |
| [Microsoft West Region](https://dchub.cloud/facilities/microsoft-microsoft-west-region-c68876c8) | Microsoft | Operational | 150 |
| [Compass Mesa Arizona](https://dchub.cloud/facilities/compass-datacenters-compass-mesa-arizona-ac6edae6) | Compass Datacenters | Operational | 120 |
| [QTS Phoenix Campus](https://dchub.cloud/facilities/qts-qts-phoenix-campus-3fb518c9) | QTS | Operational | 120 |
| [Stack Phoenix](https://dchub.cloud/facilities/stack-infrastructure-stack-phoenix-e5e3d1db) | Stack Infrastructure | Operational | 100 |
| [Novva Project Borealis Phase 1](https://dchub.cloud/facilities/novva-data-centers-novva-project-borealis-phase-1-b446777d) | Novva Data Centers | Under Construction | 96 |
| [Vantage Phoenix AZ1](https://dchub.cloud/facilities/vantage-data-centers-vantage-phoenix-az1-dcb07b09) | Vantage Data Centers | Operational | 90 |
| [Yondr Phoenix](https://dchub.cloud/facilities/yondr-group-yondr-phoenix-5189d90d) | Yondr Group | Operational | 80 |
| [EdgeCore Mesa Campus PH02](https://dchub.cloud/facilities/edgecore-digital-infrastructure-edgecore-mesa-campus-ph02-9eb8934c) | EdgeCore Digital Infrastructure | Under Construction | 72 |
| [EdgeCore Mesa Campus PH03](https://dchub.cloud/facilities/edgecore-digital-infrastructure-edgecore-mesa-campus-ph03-54c69f61) | EdgeCore Digital Infrastructure | Under Construction | 72 |
| [EdgeCore Mesa](https://dchub.cloud/facilities/edgecore-edgecore-mesa-ae478246) | EdgeCore | Operational | 65 |
| [Vantage Phoenix V1](https://dchub.cloud/facilities/vantage-data-centers-vantage-phoenix-v1-db9eff19) | Vantage Data Centers | Operational | 56 |
| [H5 Chandler 2](https://dchub.cloud/facilities/h5-data-centers-h5-chandler-2-b31493b3) | H5 Data Centers | Under Construction | 50 |
| [Stream Phoenix](https://dchub.cloud/facilities/stream-data-centers-stream-phoenix-43143c43) | Stream Data Centers | Operational | 50 |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Arizona](https://dchub.cloud/facilities/in/us/arizona).

## More on Phoenix

- [Phoenix DCPI score](https://dchub.cloud/dcpi/phoenix)
- [Phoenix market brief](https://dchub.cloud/markets/phoenix/brief)
- [Arizona data center market brief](https://dchub.cloud/states/arizona/brief)
- [Arizona data center tax incentives](https://dchub.cloud/states/arizona/data-center-incentives)

### Email me when the Phoenix DCPI verdict changes

Email me when Phoenix's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Phoenix: 4,323 MW tracked, any status — live, cited, and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=phoenix) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=phoenix)

JSON: [/api/v1/markets/phoenix/deep-dive](https://dchub.cloud/api/v1/markets/phoenix/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-09, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Phoenix","item":"https://dchub.cloud/markets/phoenix"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Phoenix Data Center Market Deep-Dive",
 "datePublished":"2026-11-09T09:01:25.914896+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/phoenix",
 "wordCount":228,
 "about":{"@type":"Place","name":"Phoenix"},
 "description":"Live data-center market analysis. DCPI score 43.5/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "phoenix", "name": "Phoenix Data Center Market — DC Hub", "description": "Live data-center market measurements for Phoenix, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/phoenix", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Phoenix"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 4323.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 43.5, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:45:19."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "CAUTION", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:45:19.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:45:19."}], "dateModified": "2026-11-09", "temporalCoverage": "2026-11-09"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/phoenix#webpage", "url": "https://dchub.cloud/markets/phoenix", "name": "Phoenix data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Phoenix data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Phoenix market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Phoenix data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Phoenix market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```