---
description: Is Philadelphia a good data center market for power? DCPI verdict AVOID, score 18.0/100 (PJM), as of 2026-11-12. 29 MW tracked across all listings, unverified included (as of 2026-11-07). Grid, queue and deal context for 300+ markets.
title: "Philadelphia data centers: power, grid and capacity | DC Hub"
---

# Philadelphia data center market

Power availability in Philadelphia: DCPI verdict AVOID, composite score 18 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 231 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Philadelphia data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Philadelphia market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**18.0/100**

MW, all listings**29**sum of the sites that report MW; most do notany status, unverified listings included

Verdict**AVOID**

This analysis was written on 2026-11-07, when the Data Center Power Index for this market read 17.9. The index is recomputed through the day and reads 18.0 now — the figure above is the live one, and the narrative below describes the market as it stood when it was written.

## Philadelphia at a glance

Philadelphia has 29 MW operational among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are Netrality (20 MW) and 365 Data Centers (9 MW).

Capacity by status, as of 2026-11-12

| Status | MW |
| --- | --- |
| Operational | 29 |
| Total listed | 29 |

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

## Colocation lease rates in Philadelphia

DC Hub does not hold a lease-rate figure for this market yet.

No recent deal activity has been tracked in the market.

This combination suggests that operators seeking to add generation or secure additional supply commitments will encounter elevated barriers relative to unconstrained markets.

Within Philadelphia proper, however, the operator base remains stable without announced M&A or facility expansions. Operator concentration—with the top five firms controlling 14 of 57 sites—suggests mature market dynamics and established footprint patterns.

Political and community factors merit attention alongside power metrics, as Philadelphia-area data center development has surfaced in legislative and civic debates around land use and infrastructure impact, though these dynamics operate independently of power supply availability.

## Data centers in Philadelphia

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [Netrality 401 N Broad](https://dchub.cloud/facilities/netrality-netrality-401-n-broad-2eac4bb1) | Netrality | Operational | 20 |
| [365 DC Philadelphia](https://dchub.cloud/facilities/365-data-centers-365-dc-philadelphia-68e6f4fa) | 365 Data Centers | Operational | 9 |
| [Crown Castle Philadelphia (401 N Broad)](https://dchub.cloud/facilities/crown-castle-inc-crown-castle-philadelphia-401-n-broad-d72aa1a2) | Crown Castle Inc. | Operational |  |
| [DāStor: 3400 Horizon Drive](https://dchub.cloud/facilities/dstor-3400-horizon-drive-dstor-3400-horizon-drive-25c3a59e) |  | Operational |  |
| [Equinix PH1 - Philadelphia](https://dchub.cloud/facilities/equinix-equinix-ph1-philadelphia-03c92353) | Equinix | Operational |  |
| [Lumen Philadelphia](https://dchub.cloud/facilities/lumen-technologies-lumen-philadelphia-9713c6a9) | Lumen Technologies | Operational |  |
| [Netrality Philadelphia - 401 N Broad](https://dchub.cloud/facilities/netrality-data-centers-netrality-philadelphia-401-n-broad-dbacc02e) | Netrality Data Centers | Operational |  |
| [Sungard AS Philadelphia](https://dchub.cloud/facilities/sungard-availability-services-sungard-as-philadelphia-bdd372f8) | Sungard Availability Services | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Pennsylvania](https://dchub.cloud/facilities/in/us/pennsylvania).

## More on Philadelphia

- [Philadelphia DCPI score](https://dchub.cloud/dcpi/philadelphia)
- [Philadelphia market brief](https://dchub.cloud/markets/philadelphia/brief)
- [Pennsylvania data center market brief](https://dchub.cloud/states/pennsylvania/brief)
- [Pennsylvania data center tax incentives](https://dchub.cloud/states/pennsylvania/data-center-incentives)

### Email me when the Philadelphia DCPI verdict changes

Email me when Philadelphia's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Philadelphia: 29 MW tracked, any status — live, cited, and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=philadelphia) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=philadelphia)

JSON: [/api/v1/markets/philadelphia/deep-dive](https://dchub.cloud/api/v1/markets/philadelphia/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Philadelphia","item":"https://dchub.cloud/markets/philadelphia"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Philadelphia Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:17:44.338469+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/philadelphia",
 "wordCount":231,
 "about":{"@type":"Place","name":"Philadelphia"},
 "description":"Live data-center market analysis. DCPI score 18.0/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "philadelphia", "name": "Philadelphia Data Center Market — DC Hub", "description": "Live data-center market measurements for Philadelphia, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/philadelphia", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Philadelphia"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 29.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 18.0, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:45:49."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "AVOID", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:45:49.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:45:49."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/philadelphia#webpage", "url": "https://dchub.cloud/markets/philadelphia", "name": "Philadelphia data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Philadelphia data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Philadelphia market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Philadelphia data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Philadelphia market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```
