description: Is Perth a good data center market for power? DCPI verdict AVOID, score 24.1/100 (AEMO), as of 2026-11-12. 240 MW tracked across all listings, unverified included (as of 2026-11-07). Grid, queue and deal context for 300+ markets.
title: "Perth data centers: power, grid and capacity | DC Hub"
---

# Perth data center market

Power availability in Perth: DCPI verdict AVOID, composite score 24.1 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 250 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Perth data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Perth market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**24.1/100**

MW, all listings**240**sum of the sites that report MW; most do notany status, unverified listings included

Verdict**AVOID**

## Colocation lease rates in Perth

DC Hub does not hold a lease-rate figure for this market yet.

Equinix, DC Alliance, and Stack Infrastructure lead operator concentration, each running between two and three sites in the region. The market has recorded no recent deal activity, reflecting a pause in announced capacity expansion or M&A since the last tracking cycle.

The DCPI verdict of AVOID carries a specific diagnostic signal about power supply dynamics. Together these readings suggest that new capacity commitments in Perth will encounter material delays in securing power feed-in, grid connection studies, or interconnection queue positions. This is not a statement about market demand or facility quality; it reflects the technical and commercial landscape for sourcing additional electricity supply.

Operator distribution shows fragmentation typical of maturing regional markets. Beyond the lead three operators, NEXTDC and Vocus Group each operate two facilities, while 60 tracked sites distribute among smaller or single-site operators. The absence of recent deal announcements indicates no material M&A or capacity acquisition has been publicly tracked in the current window. This silence does not signal retreat or weakness in underlying demand; it reflects a market pausing between investment cycles.

## Data centers in Perth

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [Equinix PE2](https://dchub.cloud/facilities/equinix-equinix-pe2-1073e0f6) | Equinix | Operational |  |
| [NEXTDC P1 Perth](https://dchub.cloud/facilities/nextdc-nextdc-p1-perth-897cd885) | NEXTDC | Operational |  |
| [Pier Data Centre](https://dchub.cloud/facilities/dc-alliance-pier-data-centre-0f8f0be5) | DC Alliance | Operational |  |
| [Rackmill](https://dchub.cloud/facilities/rackmill-rackmill-rackmill-66934630) | Rackmill, Rackmill | Operational |  |
| [Vocus Perth PER01](https://dchub.cloud/facilities/vocus-group-vocus-perth-per01-3dd7d6cb) | Vocus Group | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Australia](https://dchub.cloud/facilities/in/au).

## More on Perth

- [Perth DCPI score](https://dchub.cloud/dcpi/perth)
- [Perth market brief](https://dchub.cloud/markets/perth/brief)
- [Washington data center market brief](https://dchub.cloud/states/washington/brief)
- [Washington data center tax incentives](https://dchub.cloud/states/washington/data-center-incentives)

### Email me when the Perth DCPI verdict changes

Email me when Perth's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Perth: 240 MW tracked, any status — live, cited, and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=perth) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=perth)

JSON: [/api/v1/markets/perth/deep-dive](https://dchub.cloud/api/v1/markets/perth/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Perth","item":"https://dchub.cloud/markets/perth"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Perth Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:17:36.623850+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/perth",
 "wordCount":250,
 "about":{"@type":"Place","name":"Perth"},
 "description":"Live data-center market analysis. DCPI score 24.1/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "perth", "name": "Perth Data Center Market — DC Hub", "description": "Live data-center market measurements for Perth, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/perth", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Perth"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 240.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 24.1, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:49:07."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "AVOID", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:49:07.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:49:07."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/perth#webpage", "url": "https://dchub.cloud/markets/perth", "name": "Perth data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Perth data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Perth market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Perth data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Perth market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```